The document outlines the specifications and details for foundation, column, and tie beam construction, including dimensions, reinforcement types, and concrete grades. It includes notes on construction practices, such as clear cover requirements and reinforcement splicing guidelines. The document is intended for use in a construction project and includes a drawing title, client information, and revision details.

Uploaded by

ananya34dey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

Foundation Detail_R1

The document outlines the specifications and details for foundation, column, and tie beam construction, including dimensions, reinforcement types, and concrete grades. It includes notes on construction practices, such as clear cover requirements and reinforcement splicing guidelines. The document is intended for use in a construction project and includes a drawing title, client information, and revision details.

Uploaded by

ananya34dey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 300 300


4nos -16Ø
4375 4500 3775 725 4375
3nos -16Ø Ext. 4nos -16Ø 450 450
6nos -16Ø 75 150 150 75
8Ø @ 100c/c 8Ø @ 175c/c
TB1 (300x500)
700
TB1 (300x500) TB1 (300x500) TB1 (300x500) Foundation

75
500

500
a 2nos -10Ø 2nos -10Ø

450
C1 C2 C2 C1 C1
12nos -12Ø Bolt

160
F1 F2 F2 F1 F1
4nos -16Ø 2nos -12Ø Ext. 8Ø @ 150c/c
TB1 (300x500)

TB1 (300x500)

TB1 (300x500)
4nos -16Ø

800

165
4 Sets
3700

75
PCC PCC

800
450 450 8Ø @ 150c/c

165
C1 C1 C1 b AT SUPPORT AT SPAN Link

75 160
F1 F1 F1
SECTION DETAIL OF TB1
TB1 (300x500)

TB1 (300x500)

TB1 (300x500)
4045

SECTION OF
400 400
COLUMN C1 BOLT LAYOUT OF
4nos -16Ø
4nos -16Ø Ext. 4nos -16Ø COLUMN C1
C1 C1 C1 c
8Ø @ 100c/c 8Ø @ 175c/c
F1 F1 F1

600

600
2nos -10Ø 2nos -10Ø
TB1 (300x500)

TB1 (300x500)

TB1 (300x500)


4045

450
450 75 300 75
4nos -16Ø 3nos -12Ø Ext. 8nos -16Ø
4nos -16Ø Foundation

75
8nos -12Ø Bolt
d

75
C1 C1 C1 PCC PCC

180
F1 F1 F1
550 550
8Ø @ 150c/c

700
TB1 (300x500)

AT SUPPORT AT SPAN 4 Sets

700
190
4045

SECTION DETAIL OF TB2

50 180
C1 C1 C1 e
250 250
F1 F1 F1 3nos -16Ø 3nos -16Ø SECTION OF
BOLT LAYOUT OF
TB1 (300x500)

TB1 (300x500)

TB1 (300x500)
2nos -12Ø Ext.
COLUMN C2
4045

2900 8Ø @ 150c/c 8Ø @ 150c/c COLUMN C2

500

500
C1 C1 C1 f 3nos -16Ø
3nos -16Ø X
F1 F1 F1

75
PCC PCC
TB3 (250x500)

450
TB1 (300x500)

TB1 (300x500)

TB1 (300x500)

50
AT SUPPORT AT SPAN
5000

SECTION DETAIL OF TB3

350
TB4 (250x300)
FLOOR
1350

125

450
250 250
C1 C1 C1 g
3nos -12Ø 3nos -12Ø EGL
Tie Beam
TB3 (250x500)

F1 F1 F1
8Ø @ 150c/c 8Ø @ 150c/c
300

300
3625

Vertical Main
TB1 (300x500)

TB1 (300x500)

TB1 (300x500)

2000 3nos -12Ø 3nos -12Ø


75

TB1 (300x500) TB1 (300x500) TB1 (300x500) TB1 (300x500) PCC PCC Stirrups
1500

C1 C1 h

2000
F3 F3 AT SUPPORT AT SPAN
1700

125 Top Bars


TB2 (400x600) TB2 (400x600) TB2 (400x600) TB2 (400x600)
C1 C2
25
C2 C1 C1 i SECTION DETAIL OF TB4 Bottom Bars

F1 F2 F2 F1 F1
FOUNDATION DETAILS h Min 300 Min 300
CONDITION ABB. SIZE DEPTH REINFORCEMENT
TB1 (300x500)

TB1 (300x500)

TB1 (300x500)

TB1 (300x500)

TB1 (300x500)

75
Lx x Ly h Bottom Lx Bottom Ly Top Lx Top Ly
5550

When Soil SBC F1 2350 x 2000 500 12Ø @ 150C/C 12Ø @ 150C/C 10Ø @ 200C/C 10Ø @ 200C/C Lx x Ly
Above 15 T/Sqm
F2 1700 x 1950 450 12Ø @ 150C/C 12Ø @ 150C/C 10Ø @ 200C/C 10Ø @ 200C/C
F3 2000 x 1500 375 10Ø @ 150C/C 10Ø @ 150C/C 10Ø @ 200C/C 10Ø @ 200C/C TYPICAL FOUNDATION SECTION
TB1 (300x500) TB1 (300x500) TB1 (300x500) TB1 (300x500)
1950
2000

700
450

C1 C2 C2 C1 C1 j
800 25
450
F1 F2 F2 F1 F1
2350 1700

FOUNDATION & TIE BEAM PLAN

NOTE: PROJECT:
1. All Dimensions are in "mm" and levels are in 'M'.
______ SCHEDULE: REVISION DETAIL DRAWING TITLE:
2.
3.
Grade of Concrete: RCC M25 / 1:1:2, PCC M10 / 1:3:6, and PCC For Flooring M15 / 1:2:4.
Grade of reinforcement steel is Fe500 and/or above grade confirming IS 1786 latest.
FOUNDATION, COLUMN, AND TIE BEAM
4. Clear Cover to main reinforcement
CLIENT: DETAILS
a. Footing : 50mm
b. Column : 40mm
c. Beam : 30mm
d. Slab : 20mm
5. All laps are to be min. 50 times dia of reinforcement and all laps must be staggered. Name Signature
6. All Hooks, Bends, Juggling, Curtailment etc. shall be as per IS: 456 & other applicable codes (latest). DESIGN CONSULTANT:
7. Bottom reinforcement of beams shall not be spliced at mid span. DRAWN BY
8. Top reinforcement of beam shall not be spliced near supports.
9. Column Reinforcement shall not be spliced at joint.
CHECKED BY
10. Reinforcement bars at junctions shall be suitably anchored in concrete member.
11. backfilling should be done in layers and should be compacted with 8-10T roller or plate compactor to achieve compaction.
12. All brick works are 250mm or 125mm thick wall. APP. BY
13. RCC Floor with nominal reinforcement should be proved in place of PCC floor wherever filling within plinth is more than 1.0m
CONTRACTOR:
R0 20.06.2024 Issued for Approval
SCALE DATE DRAWING NO. SHEET REV. NO.
DATE 1:100, 1:125 20.06.2024 1 OF 1 R1