Foundation Detail_R1
Foundation Detail_R1
9Ø
4nos -16Ø
4375 4500 3775 725 4375
3nos -16Ø Ext. 4nos -16Ø 450 450
6nos -16Ø 75 150 150 75
8Ø @ 100c/c 8Ø @ 175c/c
TB1 (300x500)
700
TB1 (300x500) TB1 (300x500) TB1 (300x500) Foundation
75
500
500
a 2nos -10Ø 2nos -10Ø
450
C1 C2 C2 C1 C1
12nos -12Ø Bolt
160
F1 F2 F2 F1 F1
4nos -16Ø 2nos -12Ø Ext. 8Ø @ 150c/c
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
4nos -16Ø
800
165
4 Sets
3700
75
PCC PCC
800
450 450 8Ø @ 150c/c
165
C1 C1 C1 b AT SUPPORT AT SPAN Link
75 160
F1 F1 F1
SECTION DETAIL OF TB1
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
4045
SECTION OF
400 400
COLUMN C1 BOLT LAYOUT OF
4nos -16Ø
4nos -16Ø Ext. 4nos -16Ø COLUMN C1
C1 C1 C1 c
8Ø @ 100c/c 8Ø @ 175c/c
F1 F1 F1
600
600
2nos -10Ø 2nos -10Ø
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
9Ø
4045
450
450 75 300 75
4nos -16Ø 3nos -12Ø Ext. 8nos -16Ø
4nos -16Ø Foundation
75
8nos -12Ø Bolt
d
75
C1 C1 C1 PCC PCC
180
F1 F1 F1
550 550
8Ø @ 150c/c
700
TB1 (300x500)
700
190
4045
50 180
C1 C1 C1 e
250 250
F1 F1 F1 3nos -16Ø 3nos -16Ø SECTION OF
BOLT LAYOUT OF
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
2nos -12Ø Ext.
COLUMN C2
4045
500
500
C1 C1 C1 f 3nos -16Ø
3nos -16Ø X
F1 F1 F1
75
PCC PCC
TB3 (250x500)
450
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
50
AT SUPPORT AT SPAN
5000
350
TB4 (250x300)
FLOOR
1350
125
450
250 250
C1 C1 C1 g
3nos -12Ø 3nos -12Ø EGL
Tie Beam
TB3 (250x500)
F1 F1 F1
8Ø @ 150c/c 8Ø @ 150c/c
300
300
3625
Vertical Main
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
TB1 (300x500) TB1 (300x500) TB1 (300x500) TB1 (300x500) PCC PCC Stirrups
1500
C1 C1 h
2000
F3 F3 AT SUPPORT AT SPAN
1700
F1 F2 F2 F1 F1
FOUNDATION DETAILS h Min 300 Min 300
CONDITION ABB. SIZE DEPTH REINFORCEMENT
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
TB1 (300x500)
75
Lx x Ly h Bottom Lx Bottom Ly Top Lx Top Ly
5550
When Soil SBC F1 2350 x 2000 500 12Ø @ 150C/C 12Ø @ 150C/C 10Ø @ 200C/C 10Ø @ 200C/C Lx x Ly
Above 15 T/Sqm
F2 1700 x 1950 450 12Ø @ 150C/C 12Ø @ 150C/C 10Ø @ 200C/C 10Ø @ 200C/C
F3 2000 x 1500 375 10Ø @ 150C/C 10Ø @ 150C/C 10Ø @ 200C/C 10Ø @ 200C/C TYPICAL FOUNDATION SECTION
TB1 (300x500) TB1 (300x500) TB1 (300x500) TB1 (300x500)
1950
2000
700
450
C1 C2 C2 C1 C1 j
800 25
450
F1 F2 F2 F1 F1
2350 1700
NOTE: PROJECT:
1. All Dimensions are in "mm" and levels are in 'M'.
______ SCHEDULE: REVISION DETAIL DRAWING TITLE:
2.
3.
Grade of Concrete: RCC M25 / 1:1:2, PCC M10 / 1:3:6, and PCC For Flooring M15 / 1:2:4.
Grade of reinforcement steel is Fe500 and/or above grade confirming IS 1786 latest.
FOUNDATION, COLUMN, AND TIE BEAM
4. Clear Cover to main reinforcement
CLIENT: DETAILS
a. Footing : 50mm
b. Column : 40mm
c. Beam : 30mm
d. Slab : 20mm
5. All laps are to be min. 50 times dia of reinforcement and all laps must be staggered. Name Signature
6. All Hooks, Bends, Juggling, Curtailment etc. shall be as per IS: 456 & other applicable codes (latest). DESIGN CONSULTANT:
7. Bottom reinforcement of beams shall not be spliced at mid span. DRAWN BY
8. Top reinforcement of beam shall not be spliced near supports.
9. Column Reinforcement shall not be spliced at joint.
CHECKED BY
10. Reinforcement bars at junctions shall be suitably anchored in concrete member.
11. backfilling should be done in layers and should be compacted with 8-10T roller or plate compactor to achieve compaction.
12. All brick works are 250mm or 125mm thick wall. APP. BY
13. RCC Floor with nominal reinforcement should be proved in place of PCC floor wherever filling within plinth is more than 1.0m
CONTRACTOR:
R0 20.06.2024 Issued for Approval
SCALE DATE DRAWING NO. SHEET REV. NO.
DATE 1:100, 1:125 20.06.2024 1 OF 1 R1
REV. NO. DESCRIPTION APPD. BY