0% found this document useful (0 votes)
11 views

vietnams-pdp8-implementation-plan-nhh-12-apr-2024

Vietnam's PDP8 Implementation Plan, approved by the Prime Minister in April 2024, outlines a 27-year roadmap for power generation and transmission, aiming to double the country's power capacity to 137,853 MW by 2030. The plan emphasizes renewable energy development, targeting 43% of energy generation from renewable sources by 2030, and includes significant investments in power transmission infrastructure. Additionally, new policies and regulations will be introduced to support the implementation of the plan and facilitate the growth of renewable energy projects.

Uploaded by

hải Bùi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

vietnams-pdp8-implementation-plan-nhh-12-apr-2024

Vietnam's PDP8 Implementation Plan, approved by the Prime Minister in April 2024, outlines a 27-year roadmap for power generation and transmission, aiming to double the country's power capacity to 137,853 MW by 2030. The plan emphasizes renewable energy development, targeting 43% of energy generation from renewable sources by 2030, and includes significant investments in power transmission infrastructure. Additionally, new policies and regulations will be introduced to support the implementation of the plan and facilitate the growth of renewable energy projects.

Uploaded by

hải Bùi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 28

VIETNAM’S

PDP8 IMPLEMENTATION PLAN

Nguyen Huu Hoai


Russin & Vecchi

Tel: (84-28) 3824-3026


Email: [email protected]
Web: www.russinvecchi.com.vn

In May 2023 the Prime Minister issued the long-awaited Decision 500, approving the national
power development plan which is broadly known as (“PDP8”). Decision 500 will take effect
on May 15, 2023. It covers a term of 27 years (2023 to 2050). It provides general policies,
objectives, plans for development of power generation and transmission lines, land use, list of
important projects, and a general road map to implement PDP8.

After PDP 8 was issued, the Ministry of Industry and Trade (“MOIT”) was assigned to draft a
plan to implement PDP8. Several drafts have been submitted and reviewed since issuance. In
late March 2024 the MOIT resubmitted the final Draft PDP8 Implementation Plan to the Prime
Minister for approval. On April 1, 2024 the Prime Minister issued Decision 262, approving the
PDP8 Implementation Plan (“Plan”). Generally, the Plan is consistent with PDP8, but it
provides more detail.

Double capacity of power generation (up to 2030). Vietnam plans to double the current
capacity of the power industry, reaching 137,853 MW in 2030. Below is a table that describes
the total capacity of the power industry by source of energy:

No. Source of energy 2030


Capacity (MW)
1 Hydropower plants 29,346
2 Coal-fired power plants 30,127
3 Domestic gas-fired power plants 14,930
4 LNG power plants 22,400
5 Onshore wind power projects 21,880
6 Offshore wind power projects 6,000
7 Biomass 1,088
6 Waste-to-energy projects 1,182
9 Heat and power co-generation 2,700
10 Flexible source 300
11 Pumped-storage hydroelectricity 2,400
12 Battery storage 300
13 Imported electricity from Laos 5,000
Total 137,6531

The list of particular energy projects can be found in Appendices 1, 2, 3, 4, 5, 6,7,8,9,10, and 11.

1
A large volume of solar power projects (with capacity of 12,836MW), as approved in PDP8, is not included in
the Plan.

1
Development of Renewable Energy (“RE”) under the Plan (up to 2030). Vietnam plans to
develop various sources of energy, but will focus on RE and clean energy. It is projected that
(i) the RE portion (including hydro-power projects) will contribute about 43% of the generated
energy in 2030; (ii) the total capacity of onshore wind projects will be 21,880MW in 2030; (iii)
the total capacity of offshore wind projects may reach 6,000 MW2; (iv) the total capacity of
biomass and WTE projects will be 2,270MW; and (v) under the Plan, new rooftop solar power
projects (with total capacity of 2,600 MW) will be developed for self-consumption.

Under the Plan, Vietnam will develop RE projects (with a total capacity of 5,000 MW) and
convert the electricity generated from these RE projects in order to produce new energy (green
hydrogen, ammoniac). Vietnam also has a plan to export electricity generated by RE projects.
The projected volume is 5,000 MW and it may reach 10,000MW.

Development of Power Transmission Lines. It is planned that US$15 billion will be used to
develop the transmission lines. A list of particular transmission line projects can be found in
Decision 262. For the purpose of purchasing electricity from Laos and China, Vietnam has a
plan to develop the national transmission lines to connect with Laos and China.

Development of Legislation. The current regulations do not deal with several matters of PDP8.
Vietnam has a plan to issue new policies and laws during 2023-2025, including:

• Issuing pricing mechanisms for various types of power sources;


• Issuing regulations to regulate direct power purchase arrangements;
• Develop a mechanism to encourage the development of rooftop solar power projects
for self-production and self-consumption;
• Amending the Electricity Law;
• Amending the Law on Energy Saving and Efficient Use; and
• Developing a mechanism to develop a carbon credit market.

Reservation of land for power development. Under the Plan, 90,000 ha is reserved to develop
power projects (up to 2030).

2
In computing the capacity of offshore wind projects, PDP8 does not include the capacity of offshore wind
projects for the production of new energy.

2
APPENDIX 1

LIST OF HYDRO-POWER PLANTS

A. LIST OF MEDIUM AND LARGE SCALED HYDRO-POWER PROJECTS

No. Name Capacity Province Year of Notes


(MW) operation
1 Long Tao hydropower plant 44 Dien Bien - Being operated
2 Song Lo 6 60 Ha Giang - Being operated
3 Pac Ma 160 Lai Chau - Being operated
4 Suoi Sap 2A hydropower 49.6 Son La - Being operated
5 Dak Mi 2 hydropower plant 147 Quang Nam - Being operated
6 Song Tranh 4 hydropower 48 Quang Nam - Being operated
7 Thuong Kon Tum 220 Kon Tum - Being operated
8 Song Lo 7 36 Tuyen Quang - Being operated
9 Nam Cum 1,4,5 95.8 Lai Chau 2024-2027 Under construction
hydropower
10 Nam Cum 2,3,6 79.5 Lai Chau 2023-2027 Under construction
hydropower
11 Song Hieu hydropower 45 Nghe An 2024 Being developed
plant
12 Phu Tan 2 hydropower 93 Dong Nai 2023 Being operated
plant
13 Yen Son hydropower plant 90 Tuyen Quang 2025 Under construction
14 Hoi Xuan hydropower 102 Thanh Hoa 2024 Under construction
Station
15 Ialy TD MR 360 Gia Lai 2024 Under construction
16 Dak Mi 1 hydropower plant 84 Kon Tum 2024
17 Hoa Binh hydropower plant 480 Hoa Binh 2025 Under construction
18 Tri An hydropower plant 200 Dong Nai 2027 In progress
MR
19 Thanh Son hydropower 40 Dong Nai 2026 Planning is being adjusted
plant
20 My Ly hydropower plant 120 Nghe An 2028 Pending
21 Nam Mo 1 hydropower 51 Nghe An 2028 Pending
plant
22 Duc Thanh hydropower 40 Binh Phuoc 2026 Under construction
plant
23 La Ngau hydropower plant 46 Binh Thuan 2026 Under construction
(*)
24 Phu Tho low water 105 Phu-Tho 2026
hydropower station (**)
25 Cam Thuy 2 hydropower 38 Thanh Hoa 2030 Conflict with Cam Hoang
plant lake zoning

3
Note:

(*) La Ngau hydropower project was approved in the adjusted Electricity Planning VII, and
has been granted an Investment Certificate and Land Use Rights Certificate. The People's
Committee of Binh Thuan province issued Document No. 21/UBND-KT dated January 3, 2020
requesting to remove the La Ngau hydroelectric project from the plan. The Ministry of Industry
and Trade issued Document No. 1986/BCT-DL dated March 20, 2020 requesting the People's
Committee of Binh Thuan province to completely handle the contents mentioned in Notice No.
193/TB-VPCP dated May 25, 2018 of the Ministry of Industry and Trade. Government Office,
reporting to the Prime Minister.

(**) Phu Tho Provincial People's Committee has issued Document No. 4424/UBND-CNXD
dated November 8, 2023 requesting to remove this project from the PDP8 Implementation Plan.

B. SMALL HYDRO-POWER PLANTS

No Name Capacity Year of operation Notes


(MW)
Bac Kan Province 47.3
1 Khuoi Thoc hydroelectric plant 3 2025
2 Khuoi Noc 2 hydroelectric plant 4.2 2025
3 Thac Gieng 2 hydroelectric plant 4 2026-2030
4 Khuoi Noc hydroelectric plant 6.6 2026-2030
5 Kim Lu hydroelectric plant 9 2026-2030
6 Nam Cat 2 hydropower plant 5 2023-2030
7 My Thanh hydroelectric plant 5 2026-2030
8 Cong Bang hydroelectric plant 4 2026-2030
9 Pac Nam hydroelectric plant 6.5 2026-2030
Binh Dinh Province 49.9
1 Dong Mit hydroelectric plant 7 2023 Being operated
2 Nuoc Luong hydroelectric power 22 2024
3 Vinh Son 4 hydroelectric plant 18 2025
4 Ha Luu Dap Dang Phu Phong 2.9 2025
hydroelectric power
Binh Phuoc Province 36.1
1 Dak Kar 12 2023
2 Long Ha hydroelectric plant 20.1 2026-2030
3 Dam Lo 4 2023-2030
Cao Bang Province 121
1 Pac Khuoi hydroelectric plant 7 2024
2 Khuoi Luong hydroelectric plant 4.4 2024
3 Hong Nam hydroelectric plant 24 2025
4 Bao Lac A hydroelectric power 30 2026-2030
5 Thuong Ha hydroelectric power 13 2026-2030

4
No Name Capacity Year of operation Notes
(MW)
6 Ban Nga hydroelectric plant 24 2026-2030

7 Ban Rien hydroelectric plant 18.6 2026-2030


Dak Lak Province 10.6
1 Ea Tih hydroelectric plant 8.6 2025
2 Hydroelectric power plant behind 2.0 2026-2030
Krong Buk Ha lake irrigation dam
Dak Nong Province 8.8
1 Dak Sor 4 8.8 2023-2030
Dien Bien Province 116.5
1 Huoi Chan 1 15 2023 Being operated
2 De Bau 6 2023 Being operated
3 Muong Muon 22 2024
4 Phi Linh 18 2024
5 Muong Luan 2 10 2024
6 Muong Tung 13 2024
7 Nam Nua 2 7.5 2025
8 Chieng So 2 16 2025
9 Nam He Thuong 2 9 2026-2030
Dong Nai Province 44
1 Phu Tan 1 hydropower project 28 2026-2030
2 Thac Troi hydropower project 16 2026-2030
Ha Tinh Province 6.5
1 Irrigation combined with Song Rac 1.7 2023-2030
hydropower project
2 Vu Quang 4.8 2023-2030
Kontum Province 358.5
1 Bo Ko 2 hydroelectric plant 12.6 2023 Being operated
2 Dak Robaye hydroelectric plant 10 2024
3 Nam Vao 2 hydropower plant 8.6 2024
4 Thuong Dak Psi hydropower plant 2,4 2024
(2.4MW sub-reservoir)
5 Dak Mi 1A hydroelectric plant 11 2024
6 Dak Psi 1 hydroelectric plant 4 2024
7 Nuoc Long 1 hydroelectric plant 3.2 2024
8 Nuoc Long 2 hydroelectric plant 6.4 2024
9 Dak Nghe hydroelectric plant 7 2024
10 Bo Ko 1 hydroelectric plant 6 2024
11 Ngoc Tem hydroelectric plant 7.5 2024
12 Thuong Nam Vao hydroelectric plant 9.8 2025
13 Dak Mi 1B hydroelectric plant 6 2025
14 Dak Po Co 1 hydroelectric plant 11 2025

5
No Name Capacity Year of operation Notes
(MW)
15 Dak Mek 3 hydropower plant 7.5 2025
16 Dak Lo 4 hydropower plant 10 2025
17 Dak Lo 1 hydropower plant 12 2025
18 Dak Lo 3 hydropower plant 22 2025
19 Plei Kan Ha hydroelectric plant 13 2025
20 Dak Pru 3 hydropower plant 5 2025
21 Dak Re Thuong hydroelectric plant 14 2026-2030
22 Dak Roong hydroelectric plant 5 2026-2030
23 Dak Pone hydroelectric plant 1.6 2026-2030
(reservoir B plant)
24 Dak Krin hydroelectric plant 7.4 2026-2030
25 Nam Vao 1 hydropower plant 10 2026-2030
26 Dak Ruoi 2 hydroelectric plant 14 2026-2030
27 Dak Ruoi 3 hydroelectric plant 3 2026-2030
28 Ngoc Linh 1 hydroelectric plant 4 2026-2030
29 Ngoc Linh 2 hydroelectric plant 7.8 2026-2030
30 Ngoc Linh 3 hydroelectric plant 8.2 2026-2030
31 Dak Pek Hydroelectric Plant 10.2 2026-2030
32 Thuong Dak Psi 1 hydroelectric plant 7.2 2026-2030
33 Tan Lap hydroelectric plant 5.2 2023-2030
34 Nuoc Tre hydroelectric plant 12.8 2023-2030
35 Sa Thay 1 hydroelectric plant 9.5 2023-2030
36 Sa Thay 2 hydroelectric plant 11.2 2023-2030
37 Sa Thay 3 hydroelectric plant 10.5 2026-2030
38 Dak Bla 3 hydroelectric power 8.6 2026-2030
39 Dak Su 2 hydropower plant 7.2 2026-2030
40 Dak Toa hydroelectric plant 5 2026-2030
41 Dak Po Ne 4 hydropower plant 6 2026-2030
42 Dak Glei hydroelectric plant 10.6 2026-2030
43 Dak Piu 1 hydroelectric plant 4.5 2026-2030
Lai Chau Province 1,056.85
1 Pa Ha 28 2023 Being operated
2 Pa Tan 2 20 2023 Being operated
3 Nam Lan 15 2023 Being operated
4 Nam Lum 2 18 2023 Being operated
5 Nam Nghe 1A 10 2023 Being operated
6 Nam Xe 20 2023 Being operated
7 Chu Va 2 12 2023 Being operated
8 Chang Phang 5 2023 Being operated
9 Suoi Linh 5.2 2023 Being operated
10 Huoi Van 8 2024
11 Nam Xi Lung 2A 29 2024

6
No Name Capacity Year of operation Notes
(MW)
12 Kho Ha 22 2024
13 Nam Cau 1 13 2024
14 Nam Cau Thuong 7 2024
15 Nam Cum 7 2024
16 Nam Bum 1A 9.5 2024
17 Nam Cuoi 1 19 2024
18 Nam Cuoi 11 2024
19 Nam Pi 10 2024
20 Nam Pang 2 11 2024
21 Nam Chan 7.8 2024
22 Nam Xe 2 8 2024
23 Nam Xe 2A 10 2024
24 Vang Ma Chai 2 19 2024
25 Nam Dich 2 9 2024
26 Nam Mit Luong 6.8 2024
27 Hua Be 10 2024
28 Nam Be 2 10 2024
29 Muong Mit 11 2024
30 Muong Kim 3 18.5 2024
31 Ta Pao Ho 10 2024
32 Nam Cau 29.6 2024
33 Nam Luong 21.5 2024
34 Dong Pao 7.6 2024
35 Pa Tan 1 8 2024
36 Ho Mit 5 2024
37 Ta Pao Ho 1A 13.5 2024
38 Nam Han 8 2024
39 Nam Xi Lung 1B 11 2024
40 La Si 1 11 2024
41 Tho Ma 6 2024
42 Nam Puc 6 2024
43 Ta Pao Ho 2 5 2024
44 Nam Chan 1 5 2024
45 Suoi Ngang 12 2024
46 La Po 22 2024
47 Chu Va 2A 8 2024
48 Phieng Khon 18 2024
49 Kha U 2 15.5 2024
50 Nam Mo 1A 30 2024
51 Chu Va 12 1.8 2025
52 Nam Xi Lung 2 29.65 2025
53 Tho Gu 30 2025

7
No Name Capacity Year of operation Notes
(MW)
54 Tho Gu 1 10.2 2025
55 Na An 10.2 2025
56 Nam Ma 3 11.5 2025
57 Ta Pao Ho 1B 10.5 2025
58 Vang Ma Chai 3 21 2025
59 Nam Xi Lung 1A 7.8 2025
60 Nam Han 1 18 2025
61 Nam Bon 1 10 2025
62 Nam Cuoi 1A 7 2025
63 Nam Cuoi 1B 7.5 2025
64 Nam Cum 7 6.5 2025
65 Nam Ma 1A 16.6 2025
66 Nam Ma 1B 14 2025
67 Nam Ma 1C 10.5 2025
68 Nam Ma 2A 11.5 2025
69 Nam Ma 2B 13.8 2025
70 Nam Cha 1 24 2025
71 Nam Cha 2 4.4 2025
72 Nam Cay 15 2025
73 Pa Vay Su 1 8.5 2025
74 Nam Lon 10 2025
75 Nam Mo 2 17 2025
76 Nam Lung 5.4 2026-2030
77 Nung Than 1 30 2026-2030
78 La Si 1A 28 2026-2030
79 Nam Nga 24 2026-2030
Lang Son Province 68.8
1 Ban Lai hydroelectric plant 7 2023 Being operated
2 Ban Nhung hydroelectric plant 13 2024
3 Trang Dinh 2 hydroelectric plant 29.8 2026-2030
4 Bac Giang hydropower plant (Vang 14 2026-2030
Puoc)
5 Deo Khach hydroelectric plant 5 2026-2030
Lao Cai Province 223.5
Bao Nhai hydroelectric plant level 1
1 belongs to Bao Nhai hydroelectric 14 2024
plant project
2 May Ho hydroelectric plant 6.5 2024
3 Nam Tha Ha hydroelectric plant 6 2025
4 Nam Khoa 1 -2 hydropower plant 15 2025
5 Si Ma Cai hydroelectric plant 18 2025

8
No Name Capacity Year of operation Notes
(MW)
6 Nam Trung Ho 1 hydroelectric power 20 2025
Plant
7 Xuan Hoa hydroelectric plant 3.2 2026-2030
8 Mong Sen 1 hydroelectric plant 4.5 2026-2030
9 Ban Me hydroelectric plant 5 2026-2030
10 Ngoi Nhu 1A hydropower plant 6 2026-2030
11 Suoi Chan hydroelectric plant 6.8 2026-2030
12 Nam Cang 1A hydropower plant 10 2026-2030

13 Ta Loi 1 hydroelectric plant 15 2026-2030


14 Yen Ha hydroelectric plant 13 2026-2030
15 Lan Bo hydroelectric plant 7.6 2026-2030
16 Viet Tien hydroelectric plant 7 2026-2030
17 Sa Phin hydroelectric plant 6 2026-2030
18 Sang Ma Sao hydroelectric plant 12.5 2026-2030
19 Hom Duoi hydroelectric power 18 2026-2030
20 Nam Ho hydroelectric plant 2 2026-2030
21 Coc Dam hydroelectric plant 2,3 2026-2030
22 Nam Mu hydroelectric plant 5 2026-2030
23 Nam Pung hydroelectric plant 3.1 2026-2030
24 Suoi Chan 2 hydroelectric plant 8 2026-2030
25 Vo Lao hydroelectric plant 9 2026-2030
Lam Dong Province 96.2
1 Da Chomo hydroelectric plant 9 2023 Being operated
2 Dai Binh hydroelectric plant 15 2023 Being operated
3 Da Sar hydroelectric plant 12 2023 Being operated
4 Da Br'Len hydroelectric plant 6.2 2024
5 Tan Thuong hydroelectric plant 22 2025
6 Cam Ly hydroelectric plant 12 2025
7 Bao Lam hydroelectric plant 10 2026-2030
8 Da Huoai 2 hydroelectric plant 10 2026-2030
Ninh Thuan Province 40
1 Phuoc Hoa hydroelectric plant 22 2026-2030
2 Thuong Song Ong 2 hydropower plant 7 2026-2031
3 Lam Son hydroelectric plant 11 2026-2032
Nghe An Province 57.8
1 Chau Thon 29.8 2024
2 Thong Thu 28 2026-2030
Phu Yen Province 36
1 Khe Cach hydroelectric plant 12 2026-2030
2 Son Hoa 1 hydroelectric plant 10 2026-2030
3 Son Hoa 2 hydroelectric plant 14 2026-2030

9
No Name Capacity Year of operation Notes
(MW)
Quang Binh Province 42
1 Kim Hoa hydroelectric plant 20 2024
2 La Trong hydroelectric plant 22 2026-2030
Quang Ngai Province 210.4
1 Thach Nham hydropower plant 10 2024
(Irrigation combined with
Tra Phong hydropower plant (Tra
2 Phong 1A: 19MW; Tra Phong 1B: 30 2024
11MW)
3 Song Lien 1 hydroelectric plant 15 2024

4 Ba Vi hydroelectric plant 9 2025

5 Tra Khuc 1 hydroelectric plant 30 2025

6 Tra Khuc 2 hydroelectric plant 30 2025

7 Song Lien 2 hydroelectric plant 12 2025

8 Dakdrinh 2 hydroelectric plant 21 2026-2030

9 Tay Tra 1 hydroelectric plant 10 2026-2030

10 Tay Tra 2 hydroelectric plant 9 2026-2030

11 Tay Tra 3 hydroelectric plant 10 2026-2030

12 Long Son hydroelectric plant 10.6 2026-2030

13 Son Linh hydroelectric plant 7 2026-2030

14 Son Nham hydroelectric plant 6.8 2026-2030

Thua Thien Hue Province 9


1 Ho Truoi hydroelectric plant 6 2026-2030
2 Song Bo 1 hydropower plant 3 2026-2030
Tuyen Quang Province 27.2
1 Hung Loi 1 hydroelectric plant 8 2026-2030

2 Hung Loi 2 hydroelectric plant 3.5 2026-2030

3 Thac Giom hydroelectric plant 5.4 2026-2030

4 Hung Loi 3 hydroelectric plant 3.3 2026-2030

10
No Name Capacity Year of operation Notes
(MW)
5 Suoi Ba 2 hydroelectric plant 4 2026-2030
6 Khuan Co hydroelectric plant 3 2026-2030
Thanh Hoa Province 46.5
1 Song Am 14 2026-2030
2 10 Tan 12 2026-2030
3 Xuan Khao 7.5 2026-2030
4 Muong Min 13 2026-2030
Yen Bai Province 274.1
1 Chi Lu hydroelectric plant 15 2023
2 Thao Sa Chai hydroelectric plant 6.5 2023
3 Hanh Phuc hydroelectric plant 7 2024
4 Mi Hang Tau hydroelectric plant 4,6 2024
5 Nam Tang 3 hydropower plant 17.5 2024
6 De Dinh Mao hydroelectric plant 22 2024
7 Thac Ba 2 hydroelectric plant 18.9 2025
8 Phin Ho 2 hydropower plant 10 2025
9 Nam Tuc Bac I hydropower plant 21 2025
10 Ban Liu hydroelectric plant 3 2026-2030
11 Chan Thinh hydroelectric plant 10 2026-2030
12 Tan Linh hydroelectric plant 22 2026-2030
13 Ngoi Hut 8 hydroelectric power 11 2026-2030
14 Nam Puoi hydroelectric plant 15 2026-2030
15 Chong Khua hydroelectric plant 9.5 2026-2030
16 Nha Trang hydroelectric plant 2.6 2026-2030
17 Dong Ngai hydroelectric plant 9 2026-2030
18 Ho Bon 2 hydroelectric power 5 2026-2030
19 Phong Du Ha hydroelectric plant 16 2026-2030
20 Phong Du Thuong hydroelectric plant 22 2026-2030
21 Dao Sa hydroelectric plant 15.5 2026-2030
22 Nam Bung hydroelectric plant 11 2026-2030

11
APPENDIX 2

LIST OF COAL-FIRED POWER PLANTS

No. Name Capacity Province Year of Notes


(MW) operation
1 Van Phong 1 thermal power plant 1,432 Khanh Hoa 2024 Being operated
2 Vung Ang II thermal power plant 1,330 Ha Tinh 2025-2026
3 Na Duong II thermal power plant 110 Lang Son 2026 To be
developed
4 Quang Trach I thermal power 1,403 Quang Binh 2026 Under
plant construction
5 An Khanh thermal power plant 650 Bac Giang 2027
6 Long Phu I thermal power plant 1,200 Soc Trang 2027

List of coal-fired power projects behind schedule, facing difficulties in changing shareholders
and arranging capital

No. Project Capacity Stage Notes


(MW)
1 Quang Tri thermal (*) 1,320 2023-2030
2 Cong Thanh thermal (**) 600 2023-2030 The Ministry of Industry and Trade
works with investors and allows it to
3 Nam Dinh I thermal 1,200 2023-2030
be extended until June 2024. If it
4 Vinh Tan III thermal 1,980 2023-2030 cannot be implemented, it must be
5 Song Hau II thermal 2,120 2023-2030 considered for legal termination.

Note:

(*) The investor has requested to stop the project (According to Document EGATi 277/2023).
(**) The People’s Committee of Thanh Hoa Province proposes to convert to gas-turbine
power plant.

12
APPENDIX 3

LIST OF DOMESTIC GAS FIRED POWER PLANTS

No Project Capacity Conscious Year of Notes


(MW) operation
1 O Mon I* thermal 660 Can Tho Being operated
power
2 O Mon II thermal 1,050 Can Tho 2027 Use Block B gas
power
4 O Mon IV thermal 1,050 Can Tho 2028
power
5 TBKHH Dung Quat I 750 Quang Ngai 2028
6 TBKHH Dung Quat II 750 Quang Ngai 2028
7 TBKHH Dung Quat III 750 Quang Ngai 2028 Use Blue Whale gas
3 O Mon III thermal 1,050 Can Tho 2030 Use Block B gas
power
8 Central Region I 750 Quang Nam 2030
9 Central Region II 750 Quang Nam 2030 Use Blue Whale gas
TBKHH
10 Quang Tri TBKHH 340 Quang Tri 2030 Using gas from Bao Vang
field

Note:

(*) Existing power plant will be converted and will use Block B gas;
The exact scale of the power plants will be specifically determined, in accordance with the
capacity of the generating units during the project implementation phase.

13
APPENDIX 4

LIST OF LNG POWER PLANTS

Capacity Province Year of


No Name (MW) operation Notes

1 Nhon Trach 3 and Nhon Trach 1,624 Dong Nai 2024-2025 Under
4 power plants construction
2 LNG Hiep Phuoc phase I 1,200 HCM City 2025 Under
construction
3 Bac Lieu LNG 3,200 Bac Lieu 2027-2029 Preparing FS
4 Son My II thermal power 2,250 Binh Thuan 2027-2029 Preparing FS
plant
5 Son My I BOT thermal power 2,250 Binh Thuan 2027-2029 Preparing FS
plant
6 Quang Ninh LNG 1,500 Quang Ninh 2028-2029 Preparing FS
7 Hai Lang LNG phase 1 1,500 Quang Tri 2028-2029 Preparing FS
8 Thai Binh LNG 1,500 Thai Binh 2029 Choosing an
investor
9 LNG Nghi Son 1,500 Thanh Hoa 2029-2030 Choosing an
investor
10 Ca Na LNG 1,500 Ninh Thuan 2029-2030 Choosing an
investor
11 LNG Quang Trach II 1,500 Quang Binh 2029-2030
12 LNG Quynh Lap 1,500 Nghe An 2029-2030
13 LNG Long An I 1,500 Long An 2029-2030 Preparing FS
Thai Binh, Nam
Dinh, Nghi Son,
Potential locations, backup for Quynh Lap,
projects that are behind Vung Ang, Chan
schedule or cannot be May, Mui Ke Ga,
implemented Hiep Phuoc 2,
'Tan Phuoc, Ben
Tre,
Ca Mau,...

Note:

The exact scale of the power plants will be specifically determined, in accordance with the
capacity of the generating units during the project implementation phase.

14
APPENDIX 5

LIST OF ONSHORE WIND POWER PROJECTS

operation
No. Name Capacity Notes
(MW) stages

Dien Bien Province 300


1 BCG Dien Bien 1 wind power
plant 175 2026-2030
Envision Nam Po wind power
2 plant 125 2026-2030

Bac Kan Province 400


1 Cho Moi 2 wind power plant 130 2026-2030
2 Ngan Son wind power plant 150 2026-2030
Thien Long Cho Moi wind power
3 plant 120 2026-2030

Yen Bai Province 200


1 Nam Bung wind power plant 200 2026-2030
Bac Giang Province 500
1 Bac Giang 1 wind power plant 55 2026-2030
2 Bac Giang 2 wind power plant 55 2026-2030
3 Cam Ly wind power plant 55 2026-2030
4 Tan Son wind power plant 50 2026-2030
5 Luc Ngan wind power plant 30 2026-2030
6 SD Son Dong wind power plant 105 2026-2030
7 Yen Dung wind power plant 150 2026-2030
Lang Son Province 1,444
1 Ai Quoc wind power plant 100 2026-2030
2 Binh Gia wind power plant 80 2026-2030
3 Cao Loc wind power plant 55 2026-2030
4 Cao Loc 3 wind power plant 69 2026-2030
5 Chi Lang wind power plant 100 2026-2030
6 Cao Loc 1 wind power plant 50 2026-2030
7 Cao Loc wind power plant 1.1 50 2026-2030
8 Dinh Lap wind power plant 100 2026-2030
9 Dinh Lap 1 wind power plant 50 2026-2030
10 Dinh Lap wind power plant 1.1 50 2026-2030
11 Dinh Lap 4 wind power plant 90 2026-2030
12 Dinh Lap 5 wind power plant 100 2026-2030
13 Van Quan 1 wind power plant 50 2026-2030
14 Huu Kien wind power plant 90 2026-2030
15 Loc Binh wind power plant 60 2026-2030
Loc Binh - Pharbaco wind power
16 plant 50 2026-2030
17 Loc Binh 1 wind power plant 50 2026-2030
18 Loc Binh 3 wind power plant 60 2026-2030
19 Mau Son wind power plant 30 2026-2030
20 Thang Long 3 wind power plant 50 2026-2030
21 Van Lang 1 wind power plant 80 2026-2030
15
operation
No. Name Capacity Notes
(MW) stages
22 Van Quan wind power plant 30 2026-2030
Thai Binh Province 70
1 Tien Hai wind power plant - Thai
Binh 70 2026-2030

Thanh Hoa Province 300


1 Bac Phuong - Nghi Son wind
power plant 100 2026-2030
2 Muong Lat wind power plant 200 2026-2030
Nghe An Province 70
1 Nam Dan wind power plant 70 2026-2030

Ha Tinh Province 350


1 HBRE Ha Tinh wind power farm
120 2023-2025
Ky Khang wind power plant -
2 phase 1 60 2026-2030
3 Cam Xuyen wind power plant 1 70 2024-2025
4 Cam Xuyen 2 wind power plant 100 2026-2030
Dak Lak Province 870
18 wind turbines have
1 Cu Ne 1 wind power plant 2023-2025 been deployed,
50 expected to operate
in 2024
Expected operation
2 Cu Ne 2 wind power plant 50 2023-2025 2025
18 wind turbines have
3 Krong Buk 1 wind power plant 2023-2025 been deployed,
50 expected to operate
in 2024
18 wind turbines have
4 Krong Buk 2 wind power plant 2023-2025 been deployed,
50 expected to operate in
2024
5 Buon Ho 1 wind power plant 2023-2025
20
6 Buon Ho 2 wind power plant 2023-2025
20
7 Buon Ho 3 wind power plant 2023-2025
15
8 Cu M'Gar 2 wind power plant 2023-2025
10
Ea H'Leo 3 wind power plant (Cu
9 M'Gar) 10 2023-2025
Ea H'Leo 4 wind power plant (Cu
10 M'Gar - Buon Ho) 20 2023-2025
11 Easin1 wind power plant 2026-2030
100
12 Krongbuk 3 wind power plant 2026-2030
100
Thuan Phong Dak Lak wind power
13 plant 100 2026-2030
Tan Lap - Ea Ho wind power plant
14 50 2026-2030

16
operation
No. Name Capacity Notes
(MW) stages
15 Cu Pong 1,2 wind power plant 2026-2030
80
Krong Nang 1.1 wind power plant;
16 1.2 ' 80 2026-2030
17 NT 1 wind power plant; NT 2 2026-2030
75
Lam Dong Province 118.9
1 Duc Trong wind power plant 2026-2030
50
2 Cau Dat wind power plant 2023-2025 Construction
68.9
Ninh Thuan Province 553.7
1 Part of Hanbaram wind power
plant's capacity 93 2026-2030
2 Phuoc Huu wind power plant 50 2023-2025
Vietnam Power wind power plant
3 No. 1 30 2023-2025
Cong Hai 1 wind power plant -
4 phase 2 25 2023-2025
Cong Hai 1 wind power plant -
5 phase 1 3 2023-2025
Phuoc Nam - Enfinity - Ninh
6 Thuan renewable energy power 65 2023-2025
plant
7 Dam Nai 3 wind power plant 2023-2025
39.4
8 Dam Nai 4 wind power plant 2023-2025
27.6
BIM wind power plant expansion
9 phase 2 50 2023-2025

10 Wind power plant 7A phase 2 21 2023-2025


Phuoc Dan wind power plant 2023-2025
11 45
12 Bau Ngu Lake wind power plant 25.2 2023-2025
Tri Hai wind power plant 2023-2025
13 79.5
Phu Yen Province 298
1 HBRE An Tho wind power farm 200 2023-2025
Phase 1
Song Cau green wind power plant
2 phase 1 50 2023-2025
Nam Viet Green wind power
3 plant 48 2023-2025

Binh Dinh Province 30


1 Nhon Hoi wind power plant phase 2
30 2023-2025
Operated May 2023
Ba Ria Vung Tau Province 150
1 Xuyen Moc nearshore wind power
plant phase 2 47 2026-2030
Ba Ria - Vung Tau Cong Ly wind
2 power plant phase 1 103 2026-2030

17
operation
No. Name Capacity Notes
(MW) stages

Ben Tre Province 713.45


1 VPL wind power plant
4.2
2 Binh Dai wind power plant
25.8
3 Binh Dai wind power plant No. 2
49
4 Binh Dai No. 3 wind power plant
49
5 Thanh Phong wind power plant
29.7
Completed 07
6 Sunpro wind power plant 30 2023-2025 pillars/29.4 MW
Completed 21
Wind power plant No. 5 Ben Tre pillars/90 MW, 4.25
7 phase 2 (Thanh Hai 2,3,4 thermal 85.75 2023-2025 MW connected to the
power plant) grid, expected to
generate 85.75 MW of
electricity in 2024
Operational progress
8 30 2023-2025 2025
VPL wind power plant (Phase 2)
Nexif Energy Ben Tre wind power Investment policy has
9 plant 30 2023-2025 been granted
Nexif Ben Tre wind power plant Investment policy has
10 phases 2 and 3 50 2023-2025 been granted
Investment policy has
11 Thien Phu 2 wind power plant 30 2023-2025 been granted
Investment policy has
12 Thien Phu wind power plant 30 2023-2025 been granted
Investment policy has
13 Thanh Phu wind power plant 120 2023-2025 been granted
Investment policy has
14 Bao Thanh wind power plant 50 2023-2025 been granted
Investment policy has
15 Wind power plant No. 19 50 2023-2025 been granted
Investment policy has
16 Wind power plant No. 20 50 2023-2025 been granted

Bac Lieu Province 741


Hoa Binh 3 wind power plant 2026-2030
1 50
2 Hoa Binh 2-1 wind power plant 2026-2030
50
3 Hoa Binh 4 wind power plant 2026-2030
50
4 Hoa Binh 6 wind power plant 2026-2030
40
5 Hoa 8 wind power plant 2026-2030
50
6 Hoa Binh wind power plant 5.1 2026-2030
80
Dong Hai 1 wind power plant -
7 phase 3 50 2026-2030
8 Dong Hai 13 wind power plant 2026-2030
100
Dong Hai 3 wind power plant -
9 phase 1 50 2026-2030
Dong Hai 6 wind power plant 2026-2030
10 30

18
operation
No. Name Capacity Notes
(MW) stages
Bac Lieu wind power plant phase
11 III 141 2023-2025
Japanese wind power plant - Bac
12 Lieu 50 2023-2025

Tien Giang Province 200


Tan Thanh wind power plant 2026-2030
1 100
2 100 2026-2030
Tan Phu Dong 1 wind power plant
Tra Vinh Province 872.5
Commercially
1 64.5 2023-2025 operated
Hiep Thanh wind power plant
Choosing EPC
2 Duyen Hai wind power plant 48 2023-2025 general contractor
3 Dong Thanh 1 wind power plant 2023-2025 Under construction
80
4 Dong Thanh 2 wind power plant 2023-2025 Under construction
120
Investment policy
5 Thang Long wind power plant 96 2023-2025 granted
Dong Hai 3 wind power plant
6 (location V3-3) 48 2026-2030
7 Expanded V1-2 wind power plant 2026-2030
48
8 48 2023-2025
Wind power plant V1-3 Phase 2
Wind power plant V1 -5 and V1-6
9 Phase 2 80 2023-2025
10 Duyen Hai 2 wind power plant 2026-2030
96
Wind power plant No. 3 (location
11 V3-8) ' ' 48 2026-2030
V1-1 Tra Vinh wind power plant
12 phase 2 48 2023-2025
13 Long Vinh wind power plant 2026-2030
48
Soc Trang Province 733.2
1 Hoa Dong 2 wind power plant
45.6
2 Lac Hoa 2 wind power plant
123.6
Lac Hoa wind power plant - phase
3 1, Soc Trang province 5
4 Lac Hoa 2 wind power plant
6.4
5 Lac Hoa wind power plant
30
6 Hoa Dong wind power plant
30
7 Cong Ly wind power plant phase 1
30
8 Wind power plant No. 3
29.4
9 Wind power plant No. 2
30
10 Wind power plant No. 18
22.4
11 Wind power plant No. 7, phase 2
90

19
operation
No. Name Capacity Notes
(MW) stages
12 Wind power plant No. 11
100.8
13 Tran De wind power plant
50
14 Song Hau wind power plant
50
15 Soc Trang 16 wind power plant 2026-2030
40
BCG Soc Trang 1 wind power
16 plant 50 2026-2030

An Giang Province 50
1 JR An Giang wind power plant 50 2026-2030

Ca Mau Province 900


1 45 MW has been
Tan An 45 wind power plant 75
MW 2023-2025 operated and 30 MW
is under construction
25 MW has been
50
2 Vien An wind power plant 2023-2025 operated, and another
25 MW is under
3 Ca Mau 1A wind power plant 2023-2025 Under construction
88
4 Ca Mau 1B wind power plant 2023-2025 Under construction
88
Evaluating technical
5 Ca Mau 1C wind power plant 88 2023-2025 design
86 Evaluating technical
6 Ca Mau 1D wind power plant 2026-2030 design
Wind power plant project in Khai
7 Long tourist area - Ca Mau phase 100 2023-2025
1
Tan Thuan wind power plant
8 phase 3 25 2023-2025
9 An Dong 1 wind power plant 50 2023-2025
10
Khanh Binh Tay wind power plant 50 2023-2025
11 Khai Long wind power plant
phase 2 100 2023-2025
12 Khai Long wind power plant
phase 3 100 2026-2030

Hau Giang Province 100


1 Long My 1 wind power 100 2023-2025
Kien Giang Province 137
1 Hoa Dat 1 wind power plant 77 2026-2030
2 Kien Luong 1 wind power plant 60 2026-2030

20
APPENDIX 6

LIST OF OFFSHORE WIND POWER PROJECTS BY REGION3

TT Region Capacity (MW)


name 2023-2030
1 Northern region 2,500
2 North Central 0
3 Central Central 500
4 South Central region 2,000
5 Highlands 0
6 Southern 1,000
Total capacity 6,000

3
The Plan does not specify the name of each project. The Plan provides only the allocation to each region.
21
APPENDIX 7

LIST OF BIOMASS PROJECTS

Capacity
No. Name (MW) Stage Notes

Ca Mau Province 24
Khanh An biomass
1 power plant 24 2026-2030

Lang Son Province 30


1 Bac Son biomass power
plant 12 2026-2030
Lang Son biomass power
2 plant 18 2026-2030

Yen Bai Province 108


Yen Bai biomass
1 electricity 1 50
Truong Minh biomass power
2 58 2026-2030
Tuyen Quang Province
50
1 Tuyen Quang biomass
electricity 50 2026-2030

Nghe An Province 10
1 Quy Hop biomass
power plant 10 2026-2030

Ha Tinh Province 5
1 Hung Anh biomass
power plant 5 2026-2030

Binh Phuoc 10
1 Binh Phuoc biomass
power plant 10

Dong Nai Province 12

1 Ajinomoto Bien Hoa 12


biomass power plant
Vinh Long Province 10
1 Biomass power plant
project 10

Ben Tre Province 10


1 Ben Tre biomass power plant
10

Hau Giang Province 30


Hau Giang biomass
power plant 20
1
Hau Giang rice husk
power plant 10
2

22
APPENDIX 8

LIST OF WTE PROJECTS

Name
Capacity
No Year of Notes
(MW)
operation

Bac Ninh Province 36.7


Investment project to build an
1 industrial waste and domestic 6.1 2023 - 2025 Being operated
solid waste treatment complex
Investment project to build a 2023 - 2025
2 solid waste treatment plant 11.6 Being operated

high-tech energy generation


Investment project to build a
3 high-tech domestic solid waste 13 2023 - 2025 Being operated
treatment plant that generates
energy
Project of domestic solid waste
4 treatment area focusing on 6 2023 - 2025 Being operated
electricity generation
Lang Son Province 11
1
Lang Son waste power plant 11
2026 - 2030
Nam Dinh 15

1 Greenity Nam Dinh waste


power plant 15 2023 - 2025 Under construction

Hai Phong 40
Investment project to build a
domestic solid waste treatment 20 2026 - 2030
1 plant using waste incineration
technology to generate
Investment project to build a
household solid waste
2 treatment plant using Dinh Vu 20 2026 2030
waste incineration technology,
phase 1
Thanh Hoa Province 18
1 Thanh Hoa household waste
treatment plant generates 18
2026 - 2030
Ha Tinh Province 30

1 Waste treatment and power


generation plant in Hong Loc 30
commune, Loc Ha district, Ha
Phu Yen Province 15
1 Trung An household waste
treatment and electricity 15
2026 - 2030
23
Binh Phuoc 15
1 Tan Hung Hon Quan waste
power plant 15

Dong Nai Province 66


1 Vinh Tan waste power plant
phase 1 20
Quang Trung waste power
2 plant 7.5
W2E Dong Nai waste power
3 plant - phase 1 20
Dinh Quan waste power plant
4 - phase 1 18.5
Ba Ria Vung Tau Province 30
1 Electricity produced from
waste in Ba Ria - Vung Tau 5
2026 - 2030
Electricity produced from Toc
2 Tien 02 waste 20
2026 - 2030
Electricity produced from Toc Investment policy
3 Tien waste 5
2026 - 2030 has been granted
Soc Trang Province 16
1 Power generation plant from
solid waste in Soc Trang 16
2026 2030
Ben Tre Province 15
1 Solid waste incineration plant
to generate electricity in Ben 15
2026 - 2030
Tien Giang Province 10
1
10
Tien Giang waste power plant 2026 - 2030
Vinh Long Province 14
Waste incineration plant
1 project (electricity generation 14
using solid waste)
Kien Giang Province 14
1 Hon Dat waste power plant 10
2 Phu Quoc waste power plant 4
Ca Mau Province 16
1 Ca Mau city waste power plant 2026 - 2030
4

2 Nam Can waste power plant 6


2026 - 2030
3 U Minh waste power plant 6 2026 - 2030

24
APPENDIX 9

LIST OF CO-GENERATION POWER SOURCE PROJECTS

Capacity Year of
No. Name of power plant (MW) Province/City operation Notes
required
1 Formosa HT2 650 Ha Tinh 2026
2 Duc Giang cogeneration 100 Lao Cai 2027

3 Hai Ha 1 cogeneration 300 Quang Ninh 2025-2030


thermal power plant
4 Hoa Phat II residual gas 300 Quang Ngai 2025-2026
Prioritize and encourage the development of this type of
5 Other projects electricity production to increase energy use efficiency.
The total capacity of this type is developed without
limitation in accordance with the needs and potential of
industrial facilities.

25
APPENDIX 10

LIST OF PUMPED STORAGE HYDROPOWER PROJECTS

Capacity Year of
No Project Conscious (MW) operation Note
s
1 Bac Ai hydropower Ninh Thuan 1,200 2028-
plant 2029
2 Phuoc Hoa Ninh Thuan 1,200 2029-
hydropower 2030
Some localities propose additional pumped storage hydropower
projects: Dien Bien, Lai Chau, Quang Tri, Kon Tum, Khanh Hoa,
Other projects Dak Nong,... However, the number of projects, capacity, location,
the need must be further evaluated based on system needs to report
to the Prime Minister.

Storage battery project list

Capacity
TT Project Stage Notes
(MW)
1 50 MW battery storage project 50 2023-2030
According to
7 MW battery storage project Decision No.
2 integrated into 50 NW solar farm 7 2023-2030
1009/QD-TTg
105 MW battery storage project dated August 31,
3 integrated into 400 MW solar farm 105 2023-2030
2023
4 Other battery storage projects 138 2023-2030

26
APPENDIX 11

LIST OF ROOFTOP SOLAR PROJECTS BY EACH PROVINCE

Region/province Capacity increase 2023-2030


(MW)
Northern region 927
Hanoi 47
Hai Phong 107
Hai Duong 70
Hung Yen 62
Ha Nam 57
Nam Dinh 31
Hoa Binh 32
Ninh Binh 23
Ha Giang 3
Cao Bang 2
Lao Cai 28
Bac Kan 3
Lang Son 25
Tuyen Quang 4
Yen Bai 26
Thai Nguyen 52
Phu-Tho 31
Vinh Phuc 59
Bac Giang 86
Bac Ninh 79
Quang Ninh 73
Lai Chau 2
Dien Bien 1
Son La 5
Peace 19
North Central 231
Thanh Hoa 75
Nghe An 54
Ha Tinh 74
Quang Binh 28
Central Central 168
Quang Tri 23
Hue 33
Da Nang 30
Quang Nam 43
Quang Ngai 39
Highlands 32
Kon Tum 7

27
Region/province Capacity increase 2023-2030
(MW)
Gia Lai 8
Dak Lak 8
Dak Nong 9
South Central region 134
Binh Dinh 38
Phu Yen 18
Khanh Hoa 14
Ninh Thuan 21
Binh Thuan 38
Lam Dong 7
Southern 1.107
Ho Chi Minh City 73
Binh Phuoc 93
Tay Ninh 53
Binh Duong 185
Dong Nai 229
BA Ria Vung Tau 133
Long An 153
Dong Thap 16
An Giang 11
Tien Giang 22
Vinh Long 16
Ben tre 17
Kien Giang 10
City. Can Tho 29
Hau Giang 28
Tra Vinh 10
Soc Trang 14
Bac Lieu 2
Ca Mau 15
Nationwide 2,600