0% found this document useful (0 votes)
40 views

p 041054001 w

The document is a revision certification certificate for the drawing BI-49-14044-0001, related to the Master Gas System Expansion Phase III in Saudi Arabia. It includes approval and certification requirements, project descriptions, and methodologies for pipeline location classification. The document is proprietary to Saudi Aramco and prohibits reproduction without consent.

Uploaded by

kukuzovbolat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

p 041054001 w

The document is a revision certification certificate for the drawing BI-49-14044-0001, related to the Master Gas System Expansion Phase III in Saudi Arabia. It includes approval and certification requirements, project descriptions, and methodologies for pipeline location classification. The document is proprietary to Saudi Aramco and prohibits reproduction without consent.

Uploaded by

kukuzovbolat
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 74

EDSD REV

REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
OCT 2023
Saudi Arabia

U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
Main Pipelines

INDEX
EWJZG-1 Sec II Pipeline
BI-49-14044-0001

PDI and MLIV Locations Report for

BI-49-14044-0001
DRAWING NO.

PE-041054
1
of
74
PIPELINE LOCATION CLASSIFICATION

SHT.NO.
Master Gas System Expansion Phase III

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TABLE OF CONTENTS
ENGG CERT

BKH

BKH

BKH

SECTION 1 DEFINITIONS, ABBREVIATIONS AND HOLDS .....................................................................................5


BD

BD

BD

SECTION 2 CODES, STANDARDS AND SPECIFICATION .......................................................................................6


RE-ISSUED FOR 100% PROJECT PROPOSAL

2.1. Saudi Aramco Standards .......................................................................................................................................... 6


ISSUED FOR 100% PROJECT PROPOSAL

2.2. Industrial Codes and Standards ............................................................................................................................... 6


2.3. Reference Project Documents & drawings .............................................................................................................. 6
DESCRIPTION

SECTION 3 INTRODUCTION ........................................................................................................................7


3.1. Project Overview...................................................................................................................................................... 7
3.2. Project Locations...................................................................................................................................................... 8
ADDENDUM IFB

SECTION 4 DOCUMENT PURPOSE ...............................................................................................................9

SECTION 5 EXECUTIVE SUMMARY .............................................................................................................10


JO/EWO
10-14044-

49-14044-

49-14044-

SECTION 6 RUPTURE EXPOSURE RADIUS (RER).............................................................................................13


0001

0001

0001

SECTION 7 METHODOLOGY .....................................................................................................................14


05/31/23

10/15/23
04/26/23
DATE

7.1. Pipeline Fluid Characteristics ................................................................................................................................. 14


7.2. Population Density Index (PDI) .............................................................................................................................. 14
NO.
REV

G
F
E

DISCIPLINE 7.3. Pipeline Area Classification .................................................................................................................................... 15


ENGINEER
BD 7.4. Design Factor ......................................................................................................................................................... 15
10/15/23
DATE:
PROJECT
ENGINEER SECTION 8 EWJZG1 SEC-II PIPELINE DESCRIPTION ......................................................................................16
JMM

DATE:
10/15/23
SECTION 9 ATTACHMENTS ..................................................................................................................17
CERTIFIED
BKH 9.1. EIV and Sectionalizing Valve Requirements ........................................................................................................... 17
10/15/23
DATE:
CONSTRUCTION SECTION 10 APPENDIX ..........................................................................................................................18
AGENCY

FIGURES
DATE:
OPERATIONS
Figure 1: BI-49-14044-PL: Main Pipelines Overview................................................................................................................. 8
Figure 2: Main Pipelines Overview of change of location class in Pipelines.......................................................................... 17
DATE:
Figure 3: EWJZG1 SEC-II Pipeline Area Classification.............................................................................................................. 18
CONTROL NUMBER
VERIFICATION

Figure 4 EWJZG1 SEC-II Pipeline Area Classification from KM 463.183 To KM 470.............................................................. 19


EDSD

Figure 5 EWJZG1 SEC-II Pipeline Area Classification from KM 470 TO KM 476 .................................................................... 20
Figure 6 EWJZG1 SEC-II Pipeline Area Classification from KM 476To KM 482 ...................................................................... 21
DATE:

Figure 7 EWJZG1 SEC-II Pipeline Area Classification from KM 482To KM 489 ...................................................................... 21
BY:

Figure 8 EWJZG1 SEC-II Pipeline Area Classification from KM 489To KM 499 ...................................................................... 22
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________

Figure 9 EWJZG1 SEC-II Pipeline Area Classification from KM 499To KM 506 ...................................................................... 22
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Figure 10 EWJZG1 SEC-II Pipeline Area Classification from KM 506To KM 520................................................................... 23


BI-49-14044-0001
G

(DCC) NO. _____________________

Figure 11 EWJZG1 SEC-II Pipeline Area Classification from KM 520 To KM 529................................................................... 23

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 2


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Figure 12 EWJZG1 SEC-II Pipeline Area Classification from KM 529 To KM 539................................................................... 24
Figure 13 EWJZG1 SEC-II Pipeline Area Classification from KM 539 To KM 548................................................................... 25
ENGG CERT

BKH

BKH

BKH

Figure 14 EWJZG1 SEC-II Pipeline Area Classification from KM 548 To KM 552................................................................... 26


Figure 15 EWJZG1 SEC-II Pipeline Area Classification from KM 552 To KM 562................................................................... 27
BD

BD

BD

Figure 16 EWJZG1 SEC-II Pipeline Area Classification from KM 562 To KM 572................................................................... 27


Figure 17 EWJZG1 SEC-II Pipeline Area Classification from KM 572 To KM 585................................................................... 28
Figure 18 EWJZG1 SEC-II Pipeline Area Classification from KM 585 To KM 598................................................................... 28
RE-ISSUED FOR 100% PROJECT PROPOSAL

Figure 19 EWJZG1 SEC-II Pipeline Area Classification from KM 598 To KM 604................................................................... 29


ISSUED FOR 100% PROJECT PROPOSAL

Figure 20 EWJZG1 SEC-II Pipeline Area Classification from KM 604To KM 608.................................................................... 30


Figure 21 EWJZG1 SEC-II Pipeline Area Classification from KM 608 To KM 618................................................................... 31
Figure 22 EWJZG1 SEC-II Pipeline Area Classification from KM 618 To KM 633................................................................... 31
DESCRIPTION

Figure 23 EWJZG1 SEC-II Pipeline Area Classification from KM 633 To KM 636................................................................... 32


Figure 24 EWJZG1 SEC-II Pipeline Area Classification from KM 637 To KM 644................................................................... 33
Figure 25 EWJZG1 SEC-II Pipeline Area Classification from KM 644 To KM 650................................................................... 34
Figure 26 EWJZG1 SEC-II Pipeline Area Classification from KM 650 To KM 657................................................................... 35
ADDENDUM IFB

Figure 27 EWJZG1 SEC-II Pipeline Area Classification from KM 657 To KM 665................................................................... 36


Figure 28 EWJZG1 SEC-II Pipeline Area Classification from KM 665 To KM 669................................................................... 37
Figure 29 EWJZG1 SEC-II Pipeline Area Classification from KM 669 To KM 674................................................................... 38
Figure 30 EWJZG1 SEC-II Pipeline Area Classification from KM 674 To KM 677................................................................... 39
Figure 31 EWJZG1 SEC-II Pipeline Area Classification from KM 677 To KM 682................................................................... 40
Figure 32 EWJZG1 SEC-II Pipeline Area Classification from KM 682 To KM 688................................................................... 41
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

Figure 33 EWJZG1 SEC-II Pipeline Area Classification from KM 688 To KM 692................................................................... 42


Figure 34 EWJZG1 SEC-II Pipeline Area Classification from KM 692 To KM 698................................................................... 43
Figure 35 EWJZG1 SEC-II Pipeline Area Classification from KM 698 To KM 703................................................................... 44
05/31/23

10/15/23
04/26/23
DATE

Figure 36 EWJZG1 SEC-II Pipeline Area Classification from 703 To KM 710 ......................................................................... 45
Figure 37 EWJZG1 SEC-II Pipeline Area Classification from KM 710 To KM 716................................................................... 46
NO.
REV

G
F

Figure 38 EWJZG1 SEC-II Pipeline Area Classification from KM 716 To KM 723................................................................... 46


E

DISCIPLINE Figure 39 EWJZG1 SEC-II Pipeline Area Classification from KM 723 To KM 730................................................................... 47
ENGINEER
BD Figure 40 EWJZG1 SEC-II Pipeline Area Classification from KM 730 To KM 737................................................................... 47
DATE:
10/15/23 Figure 41 EWJZG1 SEC-II Pipeline Area Classification from KM 737 To KM 745................................................................... 47
PROJECT Figure 42 EWJZG1 SEC-II Pipeline Area Classification from KM 745 To KM 753................................................................... 48
ENGINEER
JMM
Figure 43 EWJZG1 SEC-II Pipeline Area Classification from KM 753 To KM 761................................................................... 49
10/15/23 Figure 44 EWJZG1 SEC-II Pipeline Area Classification from KM 761 To KM 769................................................................... 49
DATE:
CERTIFIED Figure 45 EWJZG1 SEC-II Pipeline Area Classification from KM 769 To KM 777................................................................... 49
BKH Figure 46 EWJZG1 SEC-II Pipeline Area Classification from KM 777 To KM 785................................................................... 50
DATE:
10/15/23 Figure 47 EWJZG1 SEC-II Pipeline Area Classification from KM 785 To KM 793................................................................... 50
CONSTRUCTION Figure 48 EWJZG1 SEC-II Pipeline Area Classification from KM 793 To KM 800................................................................... 50
AGENCY
Figure 49 EWJZG1 SEC-II Pipeline Area Classification from KM 800 To KM 808................................................................... 51
Figure 50 EWJZG1 SEC-II Pipeline Area Classification from KM 808 To KM 816................................................................... 51
DATE:
OPERATIONS
Figure 51 EWJZG1 SEC-II Pipeline Area Classification from KM 816 To KM 823................................................................... 52
Figure 52 EWJZG1 SEC-II Pipeline Area Classification from KM 823 To KM 831................................................................... 52
Figure 53 EWJZG1 SEC-II Pipeline Area Classification from KM 831 To KM 839................................................................... 52
DATE:
Figure 54 EWJZG1 SEC-II Pipeline Area Classification from KM 839 To KM 847................................................................... 53
CONTROL NUMBER
VERIFICATION

Figure 55 EWJZG1 SEC-II Pipeline Area Classification from KM 847 To KM 854................................................................... 53


Figure 56 EWJZG1 SEC-II Pipeline Area Classification from KM 854 To KM 862................................................................... 54
EDSD

Figure 57 EWJZG1 SEC-II Pipeline Area Classification from KM 862 To KM 870................................................................... 54


DATE:

Figure 58 EWJZG1 SEC-II Pipeline Area Classification from KM 870 To KM 878................................................................... 54


BY:

Figure 59 EWJZG1 SEC-II Pipeline Area Classification from KM 878 To KM 886................................................................... 55


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

Figure 60 EWJZG1 SEC-II Pipeline Area Classification from KM 886 To KM 894................................................................... 55


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

Figure 61 EWJZG1 SEC-II Pipeline Area Classification from KM 894 To KM 902................................................................... 55


BI-49-14044-0001
G

(DCC) NO. _____________________

Figure 62 EWJZG1 SEC-II Pipeline Area Classification from KM 902 To KM 910................................................................... 56

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 3


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Figure 63 EWJZG1 SEC-II Pipeline Area Classification from KM 910 To KM 918................................................................... 56
Figure 64 EWJZG1 SEC-II Pipeline Area Classification from KM 918 To KM 927................................................................... 57
ENGG CERT

BKH

BKH

BKH

Figure 65 EWJZG1 SEC-II Pipeline Area Classification from KM 927 To KM 932................................................................... 57


Figure 66 EWJZG1 SEC-II Pipeline Area Classification from KM 932 To KM 937+472 .......................................................... 58
BD

BD

BD

TABLES
RE-ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL

Table 1 Definitions ...................................................................................................................................................................... 5


Table 2 Abbreviations ................................................................................................................................................................. 5
Table 3 Saudi Aramco Standards ............................................................................................................................................... 6
DESCRIPTION

Table 4 Industrial Codes and standards .................................................................................................................................... 6


Table 5 Project Documents and Drawings ................................................................................................................................ 6
Table 6 Pipelines comprised under Main Pipelines Scope ....................................................................................................... 7
Table 7: EWJZG1 SEC-II............................................................................................................................................................... 9
ADDENDUM IFB

Table 8 Area Location Class for EWJZG1- SEC-II pipeline. ...................................................................................................... 10


Table 9 RER Values for EWJZG1 SEC-II.................................................................................................................................... 13
Table 10: Summary of Design Factors (SAES-L-410) ............................................................................................................... 15
Table 11: Gas Service Pipeline Sectionalizing Valves Criteria................................................................................................. 17
Table 12: EWJZG1 SEC-II Sales Gas Pipeline PDI and Area Classification............................................................................... 59
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001
05/31/23

10/15/23
04/26/23
NO. DATE
REV

G
F
E

DISCIPLINE
ENGINEER
BD
10/15/23
DATE:
PROJECT
ENGINEER
JMM
10/15/23
DATE:
CERTIFIED
BKH

10/15/23
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 4


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 1 DEFINITIONS, ABBREVIATIONS AND HOLDS
ENGG CERT

BKH

BKH

BKH

Table 1 Definitions
BD

BD

BD

Acronym Description
COMPANY Saudi Aramco/Saudi Arabian Oil Company
RE-ISSUED FOR 100% PROJECT PROPOSAL

SUBCONTRACTOR Suitably qualified and experienced Subcontractor engaged by CONTRACTOR to provide specific
ISSUED FOR 100% PROJECT PROPOSAL

services to support the execution of the scope


CONTRACTOR Jacobs ZATE
DESCRIPTION

WORK Shall mean all services and activities to be performed by the SUBCONTRACTOR
PROJECT Master Gas System Expansion Phase 3 (MGSEP3), Main Pipelines
Table 2 Abbreviations
ADDENDUM IFB

Acronym Description
BOD Basis of Design
DF Design Factor
EIV Emergency Isolation Valve
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

SV Sectionalizing Valve
FEED Front End Engineering Design
05/31/23

10/15/23
04/26/23
DATE

MGS Master Gas System


NO.
REV

G
F
E

MLIV Main Line Isolation Valve


DISCIPLINE
ENGINEER SG Sales Gas
BD

DATE:
10/15/23 No. Number
PROJECT
ENGINEER
OD Outside Diameter
JMM

DATE:
10/15/23 PDI Population Density Index
CERTIFIED
BKH PL Pipeline
10/15/23
DATE: RER Rupture Exposure Radius
CONSTRUCTION
AGENCY TVP True Vapor Pressure

DATE: SA Saudi Aramco


OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 5


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 2 CODES, STANDARDS AND SPECIFICATION
ENGG CERT

BKH

BKH

BKH

2.1. SAUDI ARAMCO STANDARDS


BD

BD

BD

All Saudi Aramco standards are applicable for the Project and the following shall be used (but not limited to)
RE-ISSUED FOR 100% PROJECT PROPOSAL

as applicable, with cut of date June 2022.


ISSUED FOR 100% PROJECT PROPOSAL

Table 3 Saudi Aramco Standards


Document No. Document Name
DESCRIPTION

SAES-B-064 Onshore and Nearshore Pipeline Safety

SAES-L-410 Design of Pipelines


ADDENDUM IFB

2.2. INDUSTRIAL CODES AND STANDARDS

The Pipelines and associated facilities shall be designed to the latest issue of the following Codes and
JO/EWO
10-14044-

49-14044-

49-14044-

Standards:
0001

0001

0001

Table 4 Industrial Codes and standards


05/31/23

10/15/23
04/26/23
DATE

Document No. Document Name


NO.
REV

ASME B31.8 Gas Transmission and Distribution Piping Systems


F
E

DISCIPLINE
ENGINEER
BD

DATE:
10/15/23 2.3. REFERENCE PROJECT DOCUMENTS & DRAWINGS
PROJECT
ENGINEER
JMM
Table 5 Project Documents and Drawings
10/15/23
DATE: Document No. Document Name
CERTIFIED
BKH

10/15/23 PE-041040 Pipelines Basis of Design


DATE:
CONSTRUCTION
AGENCY
PE-041059 Crossing Schedule EWJZG1 SEC-I
DATE:
OPERATIONS PA-040101 Overall Site Plan MGSEP3 Main Pipelines

DATE: PA-040110 EWJZG1 SEC-I Overall Route Map


CONTROL NUMBER
VERIFICATION

PE-041052 Pipeline Location Classification, PDI and MLIV Locations Report for EWG-3 & 4 PL
EDSD

DATE:

PE-041053 Pipeline Location Classification, PDI and MLIV Location Report EWJZG1 Sec-I
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

PE-041054 Pipeline Location Classification, PDI and MLIV Location Report EWJZG1 Sec-II
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 6


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 3 INTRODUCTION
ENGG CERT

BKH

BKH

BKH

3.1. PROJECT OVERVIEW


BD

BD

BD

The overall project objective is to expand the Master Gas System (MGS) capacity based on December 16, 2021,
RE-ISSUED FOR 100% PROJECT PROPOSAL

sales gas forecast which reaches 17.48 BSCFD by 2030 to:


ISSUED FOR 100% PROJECT PROPOSAL

• Displace liquid hydrocarbon fuel at existing Power and Desalination Plants and at major industrial
customers around the Kingdom.
DESCRIPTION

• Supply sales gas to new Power Plants in the Western region.


• Extend the MGS to the Southwestern region.
The liquid displacement program will efficiently meet the Kingdom’s energy needs and support the Kingdom
ADDENDUM IFB

and Saudi Aramco’s carbon emissions reduction strategy.


The required facilities to be developed under BI-49-14044, consists of three (3) major packages (i.e., Main
Pipelines, Compressor Stations, and Industrial Clusters) that shall be developed in parallel, to achieve the
overall business objective. An identifier (suffix) has been added where appropriate for the purposes of
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

clarifying the scope between the three (3) major scope packages, support scope development during
subsequent project stages, and facilitate cross-referencing between the major scope packages.
05/31/23

10/15/23
04/26/23
DATE

A. BI-49-14044-PL: Main Pipelines


NO.
REV

G
F
E

B. BI-49-14044-CS: Compressor Stations


DISCIPLINE
ENGINEER
BD C. BI-49-20676: Industrial Clusters
10/15/23
DATE:
PROJECT Pipelines comprised under PROJECT are shown in Figure 1 and Table 6.
ENGINEER
JMM Table 6 Pipelines comprised under Main Pipelines Scope
10/15/23
DATE: Sl. No. Pipeline Name From To Pipe Total Length (km)
CERTIFIED
BKH size (Approx.)
10/15/23
DATE: 1 SRG-3 PIPELINE UBTG-1 BGCS#1 56" 56 *
CONSTRUCTION
AGENCY 2 EWG-3 PIPELINE BGCS#1 BGCS # 10 56" 824 *

DATE: 3 EWG-4 PIPELINE BGCS#1 BGCS # 10 56" 824 *


OPERATIONS
4 EWJZG-1 SEC-I. PIPELINE BGCS # 10 SHOIABA HUB 56" 458 *

DATE:
5 EWJZG-1 SEC-II. PIPELINE SHOIABA HUB Shoqaiq 56" 462 *
CONTROL NUMBER
VERIFICATION

* Refer to the pipeline route map for the actual Pipeline length.
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 7


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
3.2. PROJECT LOCATIONS
ENGG CERT

BKH

BKH

BKH

Figure 1 below is showing a post MGS Expansion Phase-III for the main pipelines simplified schematic on the MGS
Regional map:
BD

BD

BD
RE-ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
DESCRIPTION

ADDENDUM IFB
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001
05/31/23

10/15/23
04/26/23
NO. DATE
REV

G
F
E

DISCIPLINE
ENGINEER
BD
10/15/23
DATE:
PROJECT
ENGINEER
JMM
10/15/23
DATE:
CERTIFIED
BKH

10/15/23
DATE:
CONSTRUCTION
AGENCY
Figure 1: BI-49-14044-PL: Main Pipelines Overview

DATE: The required facilities to be developed under BI-49-14044-PL are mentioned in section 3 which are located
OPERATIONS
along the Main Pipeline (Light Green line) in the above figure.

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 8


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 4 DOCUMENT PURPOSE
ENGG CERT

BKH

BKH

BKH

The purpose of this document is to identify the Area Location Class and determine the Population Density
BD

BD

BD

Index (PDI) along the Pipelines comprised within the PROJECT by using SAES-B-064 and COMPANY’s specific
RER Calculations for PROJECT Export Pipelines.
RE-ISSUED FOR 100% PROJECT PROPOSAL

This Report is developed based on the following data:


ISSUED FOR 100% PROJECT PROPOSAL

 Google Earth Pro Imagery desktop study,


 Past MGS PDI studies
DESCRIPTION

 Planimetric data provided by COMPANY


 Site visit findings
Table 7: EWJZG1 SEC-II
ADDENDUM IFB

Line Designation Pipeline Route OD Length


From To inch km

EWJZG1 SEC-II SHOAIBAH SHOQAIQ 56 475*


JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

*Pipeline length is approximate, accurate pipelines lengths are shown in the Table 12.
05/31/23

10/15/23
04/26/23
NO. DATE
REV

G
F
E

DISCIPLINE
ENGINEER
BD
10/15/23
DATE:
PROJECT
ENGINEER
JMM
10/15/23
DATE:
CERTIFIED
BKH

10/15/23
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 9


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 5 EXECUTIVE SUMMARY
ENGG CERT

BKH

BKH

BKH

The table below summarizes all the Area Location Class along the EWJZG1 SEC-II pipeline whilst the Section
BD

BD

BD

10Appendix 1.2 is listing the Area Classification in detail for each 1km pipeline section and Section 10Appendix
1.1 is showing all the PDI analysis sketches.
RE-ISSUED FOR 100% PROJECT PROPOSAL

Table 8 Area Location Class for EWJZG1- SEC-II pipeline.


ISSUED FOR 100% PROJECT PROPOSAL

Area
PL RER
Length Location Remark
Sections
Class
DESCRIPTION

From- To
km 1,2,3, or 4
(km)
463.183-
7.077 1 Scraper launcher at Shoaibah HUB, RER Covers unpopulated areas
ADDENDUM IFB

470.260
470.260-
1.18 2 Road crossing at STA. 470.850, Scattered buildings
471.440
471.440-
11.535 1 RER Covers unpopulated areas
482.975
JO/EWO
10-14044-

49-14044-

49-14044-

482.975-
0001

0001

0001

1 2 Road crossing at STA. 483.480


483.975
483.975-
05/31/23

10/15/23
04/26/23
DATE

64.825 1 NEW SV at STA. 495.177 & 527.177, RER Covers unpopulated areas
548.000
548.800-
1.2 2 Road Crossing at STA. 549.135, RER Covers unpopulated areas
NO.
REV

G
F
E

550.000
DISCIPLINE
ENGINEER 550.000-
0.715 1 RER Covers unpopulated areas
BD
550.715
10/15/23
DATE:
550.715-
PROJECT 1.285 2 Road #4040 Crossing at STA. 551.220, Scattered buildings
ENGINEER 552.000
JMM
552.000-
DATE:
10/15/23 46.445 1 SV AT STA. 559.162 & 591.155, RER Covers unpopulated areas
CERTIFIED
598.445
BKH 598.445-
1 2 RER Covers unpopulated areas, Road crossing at STA. 598.940
DATE:
10/15/23 599.445
CONSTRUCTION 599.445-
AGENCY 7.74 1 RER Covers unpopulated areas
607.185
DATE: 607.185-
0.99 2 RER Covers unpopulated areas, Road #4030 crossing at STA. 607.690
OPERATIONS 608.175
608.175-
25.05 1 RER Covers unpopulated areas, 1ST STS AT KM 623.110
DATE: 633.225
CONTROL NUMBER

633.225-
VERIFICATION

1 2 RER Covers unpopulated areas, Road crossing at STA. 633.725


634.225
EDSD

634.225-
15.775 1 RER Covers unpopulated areas
DATE:

650.000
BY:

650.000- RER Covers unpopulated areas, Road (Alshab Almusailm Dugha Rd.)
REVISIONCERTIFICATION

1 2
APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

651.000 crossing at STA. 650.490


OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001

651.000-
G

(DCC) NO. _____________________

14 1 SV AT STA. 655.110, RER Covers unpopulated areas


665.000

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 10


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Area
PL RER
Length Location Remark
ENGG CERT

BKH

BKH

BKH

Sections
Class
665.000- Scattered buildings, Road crossing at STA. 667.235 & Road
BD

BD

BD

4.115 2
669.115 (Althu'aban Rd) crossing at STA. 668.530
669.115-
2.515 1 RER Covers unpopulated areas
RE-ISSUED FOR 100% PROJECT PROPOSAL

671.630
ISSUED FOR 100% PROJECT PROPOSAL

671.630- RER Covers unpopulated areas, Road (HWY 246) crossing at STA.
3.37 2
675.000 674.330
675.000-
1 1 RER Covers unpopulated areas
DESCRIPTION

676.000
676.000-
1 2 Scattered buildings
677.000
677.000-
ADDENDUM IFB

5 1 RER Covers unpopulated areas


682.000
682.000-
2.26 2 RER Covers unpopulated areas, Road crossing at STA. 683.805
684.260
684.260- RER Covers unpopulated areas, SV AT STA. 686.910, RER Covers
3.74 1
688.000 unpopulated areas
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

688.000-
4 2 Scattered buildings, Road crossing at STA. 690.900
692.000
05/31/23

10/15/23
04/26/23
DATE

692.000-
6.155 1 RER Covers unpopulated areas
698.155
NO.
REV

698.155-
G
F
E

1.04 2 Scattered buildings, Road crossing at STA. 698.690


DISCIPLINE 699.195
ENGINEER
BD 699.195-
17.76 1 SV AT STA. 716.761, RER Covers unpopulated areas
DATE:
10/15/23 716.955
PROJECT
ENGINEER 716.955-
3.045 2 Scattered buildings, Road #4295 crossing at STA. 717.605
JMM 720.000
10/15/23
DATE: 720.000- RER Covers unpopulated areas. J/O to Southern Cement Company
CERTIFIED 19.7 1
BKH
739.700 Makkah
10/15/23 739.700- RER Covers unpopulated areas, Road crossing at STA. 740.410,
DATE: 1.41 2
CONSTRUCTION 741.110 Asphalt Road < 500 m
AGENCY
741.110-
4.225 1 RER Covers unpopulated areas
DATE:
745.335
OPERATIONS 745.335- RER Covers unpopulated areas, Road #4295 crossing at STA. 745.900,
1.17 2
746.505 Asphalt Road < 500 m
DATE: 746.505-
10.85 1 SV AT STA. 748.339, RER Covers unpopulated areas
757.355
CONTROL NUMBER
VERIFICATION

757.355-
EDSD

1.005 2 RER Covers unpopulated areas, Road crossing at STA. 757.840


758.360
DATE:

758.360-
BY:

5.07 1 RER Covers unpopulated areas


763.430
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

763.430-
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

1.01 2 RER Covers unpopulated areas, Road crossing at STA. 763.925


764.440
BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 11


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Area
PL RER
Length Location Remark
ENGG CERT

BKH

BKH

BKH

Sections
Class
764.440-
BD

BD

BD

11.16 1 RER Covers unpopulated areas


775.600
775.600-
1.02 2 Scattered buildings, Road crossing at STA. 776.120
RE-ISSUED FOR 100% PROJECT PROPOSAL

776.620
ISSUED FOR 100% PROJECT PROPOSAL

776.620- RER Covers unpopulated areas, 2ND STS AT KM 780.312 & SV AT STA.
40.195 1
816.815 811.864, RER Covers unpopulated areas
816.815-
1.005 2 RER Covers unpopulated areas, Road crossing at STA. 817.325
DESCRIPTION

817.820
817.820-
4.18 1 RER Covers unpopulated areas
822.000
822.000-
ADDENDUM IFB

3 2 Scattered buildings
825.000
825.000-
6 1 Scattered buildings
831.000
831.000-
1 2 Scattered buildings
832.000
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

832.000-
48.8 1 SV AT STA. 843.793 & 875.014, RER Covers unpopulated areas
880.000
05/31/23

10/15/23
04/26/23
DATE

880.000- RER Covers unpopulated areas, Road (HWY 209) crossing at STA.
2.2 2
883.000 881.465, Asphalt Road < 500 m
NO.
REV

883.000-
G
F
E

21.525 1 RER Covers unpopulated areas


DISCIPLINE 904.525
ENGINEER
BD 904.525-
1.125 2 Scattered Buildings, Road (Alrisasah Rd) crossing at STA. 905.105
DATE:
10/15/23 905.650
PROJECT
ENGINEER 905.650-
1.364 1 RER Covers unpopulated areas
JMM 907.014
10/15/23
DATE: SV AT STA. 907.014 & 922.014, RER Covers unpopulated areas,
CERTIFIED
907.014- Location Class 3 Selected during DBSP
BKH
30.458 3
10/15/23 937.472 in conjunction with COMPANY due to
DATE:
CONSTRUCTION future expansion of residential areas. Scraper reciver at Shoqaiq
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 12


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 6 RUPTURE EXPOSURE RADIUS (RER)
ENGG CERT

BKH

BKH

BKH

In accordance with COMPANY Standard SAES-B-064 a pipeline location class shall be based on the Population
BD

BD

BD

Density Index (PDI) within the Rupture Exposure Radius (RER) along the pipeline route.
The pipeline class location is based on the population density analysis within the rupture exposure radius (RER)
RE-ISSUED FOR 100% PROJECT PROPOSAL

along the pipeline route. SAES-B-064 describes the default values of RER in Tables 1&2 as well as the formula
ISSUED FOR 100% PROJECT PROPOSAL

shown below, for the calculation of the RER for Sweet Gas.
RER has been calculated based on Sweet Gas RER formula from SAES-B-064
DESCRIPTION

RER=20*(D^2*√P) ^ (0.3)
where D is the inner diameter of the pipeline (in.) and
ADDENDUM IFB

P is the MAOP of the pipeline (psig)


The RER values for the new EWJZG1 SEC-I line are presented in the Table 9.
Table 9 RER Values for EWJZG1 SEC-II.
EWJZG1 SEC-II
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

OD P
Inside Diameter (in) Location Class Design Factor Calculated RER (m) Selected RER
(in) (psig)
05/31/23

10/15/23
04/26/23
DATE

56 54.61 1250 1 0.72 642.6 700


56 54.33 1250 2 0.6 640.6 700
NO.
REV

G
F
E

DISCIPLINE 56 54.00 1250 3 0.5 638.3 700


ENGINEER
BD
56 53.50 1250 4 0.4 634.7 700
10/15/23
DATE:
PROJECT
ENGINEER Selected RER is rounded off to 700 m to keep a common RER for different design factor in various location
JMM
class to have a more optimum/conservative approach for the PDI study.
10/15/23
DATE:
CERTIFIED The Selected RER has been reviewed and approved during previous Project Phase, i.e., during MGS3 DBSP, see
BKH

10/15/23
Section 10Appendix 1.3.
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 13


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 7 METHODOLOGY
ENGG CERT

BKH

BKH

BKH

7.1. PIPELINE FLUID CHARACTERISTICS


BD

BD

BD

56” diameter with approximate length of 475 kilometers EWJZG1 SEC-II service is Sales Gas transportation
RE-ISSUED FOR 100% PROJECT PROPOSAL

from SHOAIBA HUB to SHOQAIQ. For more details on sales gas characteristics refer to Pipeline Basis of Design
ISSUED FOR 100% PROJECT PROPOSAL

document PE-041040.

7.2. POPULATION DENSITY INDEX (PDI)


DESCRIPTION

In order to determine PDI with respect to SAES-B-064, all the pipelines are divided into sections of 1 kilometer-
long, an RER zone has been considered on each side of pipeline centerline as summarized in Table 8. Same has
been established from start to the end of the pipeline.
ADDENDUM IFB

Each of the created RER sections along the pipelines will be analyzed considering the following list and
presented in the Section 10Appendix 1.1.
 Number of existing buildings
JO/EWO
10-14044-

49-14044-

49-14044-

 Based on number of existing buildings a number of virtual buildings is calculated


0001

0001

0001

 If identified buildings are made up of more than four occupied stories are present, they will be
05/31/23

10/15/23
04/26/23
DATE

counted as equivalent buildings. The number of equivalent buildings shall be calculated by dividing
the number of stories in those buildings by three and rounding up to a whole number.

NO.
REV

Potential future development in accordance with available information


G
F
E

DISCIPLINE
ENGINEER
 Temporary facilities in accordance with available information
BD
 Places of human concentration such as hospitals, schools, universities, prisons, hotels, shopping malls
10/15/23
DATE:
PROJECT or similar shopping complexes, or gathering halls such as a hall for weddings which are within the
ENGINEER
JMM
RER (if any) will be also noted.
DATE:
10/15/23  Final Population Density Index range is identified as sum of existing density index and virtual density
CERTIFIED
BKH
index values in accordance with SAES-B-064 Section 5.6
10/15/23
DATE: The Final Population Density index for each kilometer of pipeline is provided in Table 12, corresponding PDI
CONSTRUCTION
AGENCY sketches for each RER 1km section are provided under Section 10Appendix 1.1.

DATE: During detail design phase LSTK Contractor shall confirm the existing PDI and determine the virtual density
OPERATIONS
index of all future development within the RER, planned within at least the next (5) years along the pipeline
route.
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 14


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
7.3. PIPELINE AREA CLASSIFICATION
ENGG CERT

BKH

BKH

BKH

Pipeline will be designated for the following location classifications based on the PDI determination.
BD

BD

BD

Location class is used to justify an increase in pipeline design safeguards such as fencing, thicker pipe wall, and
isolation valves requirements.
RE-ISSUED FOR 100% PROJECT PROPOSAL

Location Class identification will be determined as follows:


ISSUED FOR 100% PROJECT PROPOSAL

 Class 1: locations are undeveloped areas within the RER for which the population density index for
any 1-kilometre segment is 10 or less.
DESCRIPTION

 Class 2: locations are areas within the RER for which the population density index is 11 through 30,
or pipeline sections adjacent to or crossing primary or secondary highways as defined in Saudi Arab
Government Ministry of Transport.
ADDENDUM IFB

 The extent of class 2 area at such crossings shall be 500 m or one RER distance, whichever is less,
perpendicularly from the edge of the highway right of way. For pipelines adjacent to or crossing
highways that are in populated areas, the more conservative classification shall prevail.
 Class 3: locations are areas within the RER for which the population density index is more than 30.
 Class 4: locations are areas within the RER in which a school, hospital, hotel, prison, shopping mall or
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

similar retail complex, or wedding hall is located, as well as any Location Class 3 areas which include
buildings of more than four occupied floors.
05/31/23

10/15/23
04/26/23
DATE

Detail breakdown of identified Area Location Class has been presented in the Section 10Appendix 1.2.
NO.
REV

G
F
E

DISCIPLINE
ENGINEER
7.4. DESIGN FACTOR
BD

DATE:
10/15/23 Referring to SAES-L-410 for the Limitations on the design factors, the design factors related to the four
PROJECT
ENGINEER Location classes described above are considered in the calculations. The values of the Design Factors are given
JMM
in Table 10.
10/15/23
DATE:
CERTIFIED Table 10: Summary of Design Factors (SAES-L-410)
BKH

10/15/23
SN SERVICE LOCATION CLASS DESIGN FACTOR
DATE:
CONSTRUCTION
AGENCY
1 SALES GAS Class 1 0.72
2 SALES GAS Class 2 0.60
DATE:
OPERATIONS 3 SALES GAS Class 3 0.50
4 SALES GAS Class 4 0.40
DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 15


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 8 EWJZG1 SEC-II PIPELINE DESCRIPTION
ENGG CERT

BKH

BKH

BKH

The EWJZG1 SEC-II Sales gas pipeline are dominantly located in the remote area, undeveloped desert with no
BD

BD

BD

buildings nearby, but in some RER section there are few buildings in the range of less than 10 and between
11-30 which are categorized as area Location Class 1 and 2 respectively. Area class 3 is considered in locations
RE-ISSUED FOR 100% PROJECT PROPOSAL

where future expansion of population and development of nearby city of SHOQAIQ.


ISSUED FOR 100% PROJECT PROPOSAL

The proposed 56" EWJZG1 SEC-II sales gas pipeline will start from scraper launcher at Shoaibah HUB and will
end at the scraper receiver at Shoqaiq. Along the way of the pipeline, two intermediate scraper trap stations
DESCRIPTION

were considered with 155 KM between each scraping facilities. Majority of the pipeline route cross
unpopulated area with area classification ranges between 1 and 2. At KM 907.014 area classification 3 and it
will continue all the way to the scraper receiver area at Shoqaiq.
ADDENDUM IFB

For further details on the pipeline route refer to overall Pipeline Route Map PA-040110 and figures attached
in Section 10Appendix 1.1.
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001
05/31/23

10/15/23
04/26/23
NO. DATE
REV

G
F
E

DISCIPLINE
ENGINEER
BD
10/15/23
DATE:
PROJECT
ENGINEER
JMM
10/15/23
DATE:
CERTIFIED
BKH

10/15/23
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 16


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 9 ATTACHMENTS
ENGG CERT

BKH

BKH

BKH

9.1. EIV AND SECTIONALIZING VALVE REQUIREMENTS


BD

BD

BD

In accordance with SAES-B-064 paragraph 8 and 8.1.1, an Emergency Isolation valve (EIV) is required between
RE-ISSUED FOR 100% PROJECT PROPOSAL

pipeline sections of different location classes as specified below:


ISSUED FOR 100% PROJECT PROPOSAL

- Location Class 1 and Class 3


- Location Class 1 and Class 4
DESCRIPTION

- Location Class 2 and Class 3


- Location Class 2 and Class 4
ADDENDUM IFB

- Location Class 3 and Class 4


JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001
05/31/23

10/15/23
04/26/23
NO. DATE
REV

G
F
E

DISCIPLINE
ENGINEER
BD Figure 2: Main Pipelines Overview of change of location class in Pipelines
10/15/23
DATE:
PROJECT
ENGINEER
The sectionalizing valves (SV) will be installed as required in SAES-L-410 Table 4. SAES-L-410 dictates the
JMM
10/15/23 criteria for the provision of the SV and their maximum spacing as a function of the pipeline service and location
DATE:
CERTIFIED class.
BKH

DATE:
10/15/23 The criteria for “Gas Service” in the above-mentioned standard are shown below.
CONSTRUCTION
AGENCY Table 11: Gas Service Pipeline Sectionalizing Valves Criteria

DATE:
Class 1 Class 2 Class 3 Class 4
OPERATIONS
32 km 24 km 16 km 8 km

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 17


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Section 10 APPENDIX
ENGG CERT

BKH

BKH

BKH

Appendix 1.1 RER SECTIONS ALONG EWJZG-1 SEC II PIPELINES


BD

BD

BD

The figures under this section are presenting RER extension on each side of the EWJZG1 SEC-II Pipelines, 1km
sections distribution along EWJZG1 SEC-II Pipeline route and Location Class identified for each 1km RER
RE-ISSUED FOR 100% PROJECT PROPOSAL

section.
ISSUED FOR 100% PROJECT PROPOSAL

The following figures are presenting RER distribution along the EWJZG1 SEC-II Pipelines route.
DESCRIPTION

ADDENDUM IFB
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001
05/31/23

10/15/23
04/26/23
NO. DATE
REV

G
F
E

DISCIPLINE
ENGINEER
BD
10/15/23
DATE:
PROJECT
ENGINEER
JMM
10/15/23
DATE:
CERTIFIED
BKH
Figure 3: EWJZG1 SEC-II Pipeline Area Classification
10/15/23
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 18


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX

BI-49-14044-0001
DRAWING NO.
Figure 4 EWJZG1 SEC-II Pipeline Area Classification from KM 463.183 To KM 470

PE-041054
of
19

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 5 EWJZG1 SEC-II Pipeline Area Classification from KM 470 TO KM 476

BI-49-14044-0001
DRAWING NO.

PE-041054
of
20

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 7 EWJZG1 SEC-II Pipeline Area Classification from KM 482To KM 489
Figure 6 EWJZG1 SEC-II Pipeline Area Classification from KM 476To KM 482

BI-49-14044-0001
DRAWING NO.

PE-041054
of
21

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 9 EWJZG1 SEC-II Pipeline Area Classification from KM 499To KM 506
Figure 8 EWJZG1 SEC-II Pipeline Area Classification from KM 489To KM 499

BI-49-14044-0001
DRAWING NO.

PE-041054
of
22

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 11 EWJZG1 SEC-II Pipeline Area Classification from KM 520 To KM 529
Figure 10 EWJZG1 SEC-II Pipeline Area Classification from KM 506To KM 520

BI-49-14044-0001
DRAWING NO.

PE-041054
of
23

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 12 EWJZG1 SEC-II Pipeline Area Classification from KM 529 To KM 539

BI-49-14044-0001
DRAWING NO.

PE-041054
of
24

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 13 EWJZG1 SEC-II Pipeline Area Classification from KM 539 To KM 548

BI-49-14044-0001
DRAWING NO.

PE-041054
of
25

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 14 EWJZG1 SEC-II Pipeline Area Classification from KM 548 To KM 552

BI-49-14044-0001
DRAWING NO.

PE-041054
of
26

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 16 EWJZG1 SEC-II Pipeline Area Classification from KM 562 To KM 572
Figure 15 EWJZG1 SEC-II Pipeline Area Classification from KM 552 To KM 562

BI-49-14044-0001
DRAWING NO.

PE-041054
of
27

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 18 EWJZG1 SEC-II Pipeline Area Classification from KM 585 To KM 598
Figure 17 EWJZG1 SEC-II Pipeline Area Classification from KM 572 To KM 585

BI-49-14044-0001
DRAWING NO.

PE-041054
of
28

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 19 EWJZG1 SEC-II Pipeline Area Classification from KM 598 To KM 604

BI-49-14044-0001
DRAWING NO.

PE-041054
of
29

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 20 EWJZG1 SEC-II Pipeline Area Classification from KM 604To KM 608

BI-49-14044-0001
DRAWING NO.

PE-041054
of
30

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 22 EWJZG1 SEC-II Pipeline Area Classification from KM 618 To KM 633
Figure 21 EWJZG1 SEC-II Pipeline Area Classification from KM 608 To KM 618

BI-49-14044-0001
DRAWING NO.

PE-041054
of
31

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 23 EWJZG1 SEC-II Pipeline Area Classification from KM 633 To KM 636

BI-49-14044-0001
DRAWING NO.

PE-041054
of
32

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 24 EWJZG1 SEC-II Pipeline Area Classification from KM 637 To KM 644

BI-49-14044-0001
DRAWING NO.

PE-041054
of
33

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 25 EWJZG1 SEC-II Pipeline Area Classification from KM 644 To KM 650

BI-49-14044-0001
DRAWING NO.

PE-041054
of
34

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 26 EWJZG1 SEC-II Pipeline Area Classification from KM 650 To KM 657

BI-49-14044-0001
DRAWING NO.

PE-041054
of
35

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 27 EWJZG1 SEC-II Pipeline Area Classification from KM 657 To KM 665

BI-49-14044-0001
DRAWING NO.

PE-041054
of
36

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 28 EWJZG1 SEC-II Pipeline Area Classification from KM 665 To KM 669

BI-49-14044-0001
DRAWING NO.

PE-041054
of
37

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 29 EWJZG1 SEC-II Pipeline Area Classification from KM 669 To KM 674

BI-49-14044-0001
DRAWING NO.

PE-041054
of
38

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 30 EWJZG1 SEC-II Pipeline Area Classification from KM 674 To KM 677

BI-49-14044-0001
DRAWING NO.

PE-041054
of
39

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 31 EWJZG1 SEC-II Pipeline Area Classification from KM 677 To KM 682

BI-49-14044-0001
DRAWING NO.

PE-041054
of
40

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 32 EWJZG1 SEC-II Pipeline Area Classification from KM 682 To KM 688

BI-49-14044-0001
DRAWING NO.

PE-041054
of
41

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 33 EWJZG1 SEC-II Pipeline Area Classification from KM 688 To KM 692

BI-49-14044-0001
DRAWING NO.

PE-041054
of
42

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 34 EWJZG1 SEC-II Pipeline Area Classification from KM 692 To KM 698

BI-49-14044-0001
DRAWING NO.

PE-041054
of
43

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 35 EWJZG1 SEC-II Pipeline Area Classification from KM 698 To KM 703

BI-49-14044-0001
DRAWING NO.

PE-041054
of
44

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 36 EWJZG1 SEC-II Pipeline Area Classification from 703 To KM 710

BI-49-14044-0001
DRAWING NO.

PE-041054
of
45

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 38 EWJZG1 SEC-II Pipeline Area Classification from KM 716 To KM 723
Figure 37 EWJZG1 SEC-II Pipeline Area Classification from KM 710 To KM 716

BI-49-14044-0001
DRAWING NO.

PE-041054
of
46

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 41 EWJZG1 SEC-II Pipeline Area Classification from KM 737 To KM 745
Figure 40 EWJZG1 SEC-II Pipeline Area Classification from KM 730 To KM 737
Figure 39 EWJZG1 SEC-II Pipeline Area Classification from KM 723 To KM 730

BI-49-14044-0001
DRAWING NO.

PE-041054
of
47

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 42 EWJZG1 SEC-II Pipeline Area Classification from KM 745 To KM 753

BI-49-14044-0001
DRAWING NO.

PE-041054
of
48

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 44 EWJZG1 SEC-II Pipeline Area Classification from KM 761 To KM 769

Figure 45 EWJZG1 SEC-II Pipeline Area Classification from KM 769 To KM 777


Figure 43 EWJZG1 SEC-II Pipeline Area Classification from KM 753 To KM 761

BI-49-14044-0001
DRAWING NO.

PE-041054
of
49

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 48 EWJZG1 SEC-II Pipeline Area Classification from KM 793 To KM 800
Figure 47 EWJZG1 SEC-II Pipeline Area Classification from KM 785 To KM 793
Figure 46 EWJZG1 SEC-II Pipeline Area Classification from KM 777 To KM 785

BI-49-14044-0001
DRAWING NO.

PE-041054
of
50

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 50 EWJZG1 SEC-II Pipeline Area Classification from KM 808 To KM 816
Figure 49 EWJZG1 SEC-II Pipeline Area Classification from KM 800 To KM 808

BI-49-14044-0001
DRAWING NO.

PE-041054
of
51

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 53 EWJZG1 SEC-II Pipeline Area Classification from KM 831 To KM 839
Figure 52 EWJZG1 SEC-II Pipeline Area Classification from KM 823 To KM 831
Figure 51 EWJZG1 SEC-II Pipeline Area Classification from KM 816 To KM 823

BI-49-14044-0001
DRAWING NO.

PE-041054
of
52

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 55 EWJZG1 SEC-II Pipeline Area Classification from KM 847 To KM 854
Figure 54 EWJZG1 SEC-II Pipeline Area Classification from KM 839 To KM 847

BI-49-14044-0001
DRAWING NO.

PE-041054
of
53

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 58 EWJZG1 SEC-II Pipeline Area Classification from KM 870 To KM 878
Figure 57 EWJZG1 SEC-II Pipeline Area Classification from KM 862 To KM 870
Figure 56 EWJZG1 SEC-II Pipeline Area Classification from KM 854 To KM 862

BI-49-14044-0001
DRAWING NO.

PE-041054
of
54

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 61 EWJZG1 SEC-II Pipeline Area Classification from KM 894 To KM 902
Figure 60 EWJZG1 SEC-II Pipeline Area Classification from KM 886 To KM 894
Figure 59 EWJZG1 SEC-II Pipeline Area Classification from KM 878 To KM 886

BI-49-14044-0001
DRAWING NO.

PE-041054
of
55

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 63 EWJZG1 SEC-II Pipeline Area Classification from KM 910 To KM 918
Figure 62 EWJZG1 SEC-II Pipeline Area Classification from KM 902 To KM 910

BI-49-14044-0001
DRAWING NO.

PE-041054
of
56

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX
Figure 65 EWJZG1 SEC-II Pipeline Area Classification from KM 927 To KM 932
Figure 64 EWJZG1 SEC-II Pipeline Area Classification from KM 918 To KM 927

BI-49-14044-0001
DRAWING NO.

PE-041054
of
57

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX

BI-49-14044-0001
DRAWING NO.
Figure 66 EWJZG1 SEC-II Pipeline Area Classification from KM 932 To KM 937+472

PE-041054
of
58

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Appendix 1.2 PDI AND AREA CLASSIFICATION FINDINGS
ENGG CERT

BKH

BKH

BKH

As presented in Appendix 1.1, EWJZG1 SEC-II Pipeline is divided into 1 km sections with a zone of one RER on
each side as listed in Table 12 of this document.
BD

BD

BD

Based on the above, the PDI analysis was performed, and the results are tabulated below.
RE-ISSUED FOR 100% PROJECT PROPOSAL

Table 12: EWJZG1 SEC-II Sales Gas Pipeline PDI and Area Classification
ISSUED FOR 100% PROJECT PROPOSAL

PDI per
Area
PL RER Each 1 Design
No of Location Remark
Sections KM No. of Factor
Equivalent Class
Section Buildings
DESCRIPTION

Buildings
No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
Scraper launcher at
Shoaibah HUB, RER
ADDENDUM IFB

463.183-464.000 <10 0 0 1 0.72


Covers unpopulated
areas
RER Covers
464.000-469.000 <10 0 0 1 0.72
unpopulated areas
RER Covers
469.000-470.000 <10 5 5 1 0.72
unpopulated areas
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

RER Covers
470.000-470.260 <10 0 0 1 0.72
unpopulated areas
05/31/23

10/15/23

Road crossing at
04/26/23
DATE

470.260-471.440 <10 0 0 2 0.6 STA. 470.850,


Scattered buildings
NO.
REV

RER Covers
G
F
E

471.440-472.000 <10 7 7 1 0.72


DISCIPLINE unpopulated areas
ENGINEER
RER Covers
BD 472.000-473.000 <10 3 3 1 0.72
10/15/23 unpopulated areas
DATE:
RER Covers
PROJECT
ENGINEER 473.000-474.000 <10 0 0 1 0.72 unpopulated areas
JMM
RER Covers
10/15/23 474.000-475.000 <10 2 2 1 0.72
DATE: unpopulated areas
CERTIFIED
RER Covers
BKH 475.000-476.000 <10 0 0 1 0.72
unpopulated areas
10/15/23
DATE: RER Covers
CONSTRUCTION 476.000-477.000 <10 8 8 1 0.72
AGENCY unpopulated areas
RER Covers
477.000-481.000 <10 0 0 1 0.72
DATE: unpopulated areas
OPERATIONS RER Covers
481.000-482.000 <10 5 5 1 0.72
unpopulated areas
RER Covers
DATE: 482.000-482.975 <10 3 3 1 0.72
unpopulated areas
CONTROL NUMBER
VERIFICATION

Road crossing at
482.975-483.975 <10 0 0 2 0.6
EDSD

STA. 483.480
RER Covers
483.975-485.000 <10 0 0 1 0.72
DATE:

unpopulated areas
BY:

RER Covers
485.000-486.000 <10 10 10 1 0.72
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

unpopulated areas
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

NEW SV at STA.
BI-49-14044-0001
G

486.000-516.000 1 0.72
(DCC) NO. _____________________

<10 0 0 495.177, RER Covers


unpopulated areas

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 59


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
RER Covers
RE-ISSUED FOR 100% PROJECT PROPOSAL

516.000-517.000 <10 2 2 1 0.72


unpopulated areas
ISSUED FOR 100% PROJECT PROPOSAL

RER Covers
517.000-525.000 <10 0 0 1 0.72
unpopulated areas
RER Covers
525.000-526.000 <10 1 1 1 0.72
DESCRIPTION

unpopulated areas
NEW SV at STA.
526.000-536.000 <10 0 0 1 0.72 527.177, RER Covers
unpopulated areas
RER Covers
ADDENDUM IFB

536.000-537.000 <10 2 2 1 0.72


unpopulated areas
RER Covers
537.000-544.000 <10 0 0 1 0.72
unpopulated areas
RER Covers
544.000-545.000 <10 5 5 1 0.72
unpopulated areas
JO/EWO
10-14044-

49-14044-

49-14044-

RER Covers
545.000-547.000 <10 0 0 1 0.72
0001

0001

0001

unpopulated areas
RER Covers
547.000-548.000 <10 1 1 1 0.72
05/31/23

10/15/23
04/26/23
DATE

unpopulated areas
RER Covers
548.000-548.800 <10 2 2 1 0.72
unpopulated areas
NO.
REV

G
F
E

Road Crossing at
DISCIPLINE
STA. 547.135, RER
ENGINEER 548.800-550.000 11-30 11 11 2 0.6
BD Covers unpopulated
DATE:
10/15/23 areas
PROJECT RER Covers
ENGINEER 550.000-550.715 <10 0 0 1 0.72
JMM
unpopulated areas
10/15/23
Road #4040 Crossing
DATE:
CERTIFIED
550.715-552.000 11-30 11 11 2 0.6 at STA. 551.220,
BKH Scattered buildings
RER Covers
DATE:
10/15/23 552.000-553.000 <10 6 6 1 0.72
CONSTRUCTION
unpopulated areas
AGENCY RER Covers
553.000-554.000 <10 8 8 1 0.72
unpopulated areas
DATE: RER Covers
OPERATIONS 554.000-555.000 <10 0 0 1 0.72
unpopulated areas
RER Covers
555.000-556.000 <10 10 10 1 0.72
DATE:
unpopulated areas
RER Covers
CONTROL NUMBER

556.000-557.000 <10 0 0 1 0.72


VERIFICATION

unpopulated areas
EDSD

RER Covers
557.000-559.000 <10 3 3 1 0.72
unpopulated areas
DATE:

SV AT STA. 559.162,
BY:

559.000-560.000 <10 0 0 1 0.72 RER Covers


REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

unpopulated areas
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

RER Covers
BI-49-14044-0001

560.000-561.000 <10 5 5 1 0.72


G

(DCC) NO. _____________________

unpopulated areas

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 60


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
SV AT STA. 591.155,
RE-ISSUED FOR 100% PROJECT PROPOSAL

561.000-598.445 <10 0 0 1 0.72 RER Covers


ISSUED FOR 100% PROJECT PROPOSAL

unpopulated areas
RER Covers
unpopulated areas,
598.445-599.445 <10 0 0 2 0.6
DESCRIPTION

Road crossing at
STA. 598.940
RER Covers
599.445-603.000 <10 0 0 1 0.72
unpopulated areas
RER Covers
ADDENDUM IFB

603.000-604.000 <10 8 8 1 0.72


unpopulated areas
RER Covers
604.000-605.000 <10 2 2 1 0.72
unpopulated areas
RER Covers
605.000-606.000 <10 1 1 1 0.72
unpopulated areas
JO/EWO
10-14044-

49-14044-

49-14044-

RER Covers
606.000-607.000 <10 0 0 1 0.72
0001

0001

0001

unpopulated areas
RER Covers
607.000-607.185 <10 0 0 1 0.72
05/31/23

10/15/23
04/26/23
DATE

unpopulated areas
RER Covers
unpopulated areas,
607.185-608.175 <10 1 1 2 0.6
NO.
REV

G
F
E

Road #4030 crossing


DISCIPLINE at STA. 607.690
ENGINEER
BD RER Covers
608.175-609.000 <10 1 1 1 0.72 unpopulated areas
10/15/23
DATE:
PROJECT RER Covers
ENGINEER 609.000-610.000 <10 2 2 1 0.72
unpopulated areas
JMM
1ST STS AT KM
DATE:
10/15/23 610.000-623.110 <10 0 0 1 0.72
CERTIFIED
623.110
RER Covers
BKH
623.110-633.225 <10 0 0 1 0.72
10/15/23
unpopulated areas
DATE:
CONSTRUCTION
RER Covers
AGENCY unpopulated areas,
633.225-634.225 <10 0 0 2 0.6
Road crossing at
DATE: STA. 633.725
OPERATIONS RER Covers
634.225-635.000 <10 6 6 1 0.72
unpopulated areas
RER Covers
DATE: 635.000-637.000 <10 0 0 1 0.72
unpopulated areas
CONTROL NUMBER
VERIFICATION

RER Covers
637.000-638.000 <10 4 4 1 0.72
EDSD

unpopulated areas
RER Covers
638.000-639.000 <10 6 6 1 0.72
DATE:

unpopulated areas
BY:

RER Covers
639.000-641.000 <10 2 2 1 0.72
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

unpopulated areas
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

RER Covers
BI-49-14044-0001

641.000-642.000 <10 2 2 1 0.72


G

(DCC) NO. _____________________

unpopulated areas

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 61


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
RER Covers
RE-ISSUED FOR 100% PROJECT PROPOSAL

642.000-649.000 <10 0 0 1 0.72


unpopulated areas
ISSUED FOR 100% PROJECT PROPOSAL

RER Covers
649.000-650.000 <10 4 4 1 0.72
unpopulated areas
RER Covers
DESCRIPTION

unpopulated areas,
Road (Alshab
650.000-651.000 <10 5 5 2 0.6
Almusailm Dugha
Rd.) crossing at STA.
650.490
ADDENDUM IFB

SV AT STA. 655.110,
651.000-665.000 <10 0 0 1 0.72 RER Covers
unpopulated areas
665.000-666.000 <10 15 15 2 0.6 Scattered Buildings
RER Covers
666.000-666.630 <10 9 9 1 0.6
JO/EWO
10-14044-

49-14044-

49-14044-

unpopulated areas
0001

0001

0001

Scattered buildings,
666.630-668.000 11-30 24 24 2 0.6 Road crossing at
05/31/23

10/15/23
04/26/23
DATE

STA. 667.235
RER Covers
unpopulated areas,
NO.
REV

G
F
E

668.000-669.115 <10 0 0 2 0.6 Road (Althu'aban Rd)


DISCIPLINE
ENGINEER crossing at STA.
BD 668.530
DATE:
10/15/23 RER Covers
669.115-671.000 <10 0 0 1 0.72
PROJECT
ENGINEER
unpopulated areas
RER Covers
JMM
671.000-671.630 <10 4 4 1 0.72
10/15/23 unpopulated areas
DATE:
CERTIFIED RER Covers
BKH 671.630-674.000 <10 2 2 2 0.6 unpopulated areas,
DATE:
10/15/23 Asphalt <500 m
CONSTRUCTION RER Covers
AGENCY
unpopulated areas,
674.000-675.000 11-30 12 12 1 0.6 Road (HWY 246)
DATE: crossing at STA.
OPERATIONS
674.330
RER Covers
675.000-676.000 <10 7 7 1 0.72
DATE: unpopulated areas
CONTROL NUMBER

676.000-677.000 11-30 25 25 2 0.6 Scattered buildings


VERIFICATION

RER Covers
EDSD

677.000-678.000 <10 4 4 1 0.72


unpopulated areas
RER Covers
DATE:

678.000-679.000 <10 0 0 1 0.72


BY:

unpopulated areas
RER Covers
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

679.000-680.000 <10 1 1 1 0.72


THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

unpopulated areas
BI-49-14044-0001

RER Covers
G

(DCC) NO. _____________________

680.000-681.000 <10 0 0 1 0.72


unpopulated areas

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 62


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
RER Covers
RE-ISSUED FOR 100% PROJECT PROPOSAL

681.000-682.000 <10 4 4 1 0.72


unpopulated areas
ISSUED FOR 100% PROJECT PROPOSAL

682.000-683.000 11-30 11 11 2 0.6 Scattered buildings


RER Covers
683.000-683.185 <10 7 7 1 0.6
unpopulated areas
DESCRIPTION

RER Covers
unpopulated areas,
683.185-684.260 <10 7 7 2 0.6
Road crossing at
STA. 683.805
ADDENDUM IFB

RER Covers
684.260-685.000 <10 0 0 1 0.72
unpopulated areas
RER Covers
unpopulated areas,
685.000-687.000 <10 2 2 1 0.72 SV AT STA. 686.910,
RER Covers
JO/EWO
10-14044-

49-14044-

49-14044-

unpopulated areas
0001

0001

0001

RER Covers
687.000-688.000 <10 5 5 1 0.72
unpopulated areas
05/31/23

10/15/23
04/26/23
DATE

688.000-689.000 11-30 16 16 2 0.6 Scattered buildings


689.000-690.000 11-30 18 18 2 0.6 Scattered buildings
NO.
REV

G
F
E

Scattered buildings,
DISCIPLINE
ENGINEER
690.000-691.000 11-30 14 14 2 0.6 Road crossing at
BD STA. 690.900
DATE:
10/15/23 Scattered buildings,
PROJECT 691.000-692.000 11-30 11 11 2 0.6 Road crossing < 500
ENGINEER
m.
JMM
RER Covers
10/15/23 692.000-698.155 <10 0 0 1 0.72
DATE: unpopulated areas
CERTIFIED
BKH
Scattered buildings,
10/15/23
698.155-699.195 11-30 11 11 2 0.6 Road crossing at
DATE:
STA. 698.690
CONSTRUCTION
AGENCY RER Covers
699.195-700.000 <10 3 3 1 0.72
unpopulated areas
DATE: RER Covers
700.000-705.000 <10 0 0 1 0.72
OPERATIONS unpopulated areas
RER Covers
705.000-706.000 <10 3 3 1 0.72
DATE:
unpopulated areas
SV AT STA. 716.761,
CONTROL NUMBER
VERIFICATION

706.000-716.955 <10 0 0 1 0.72 RER Covers


EDSD

unpopulated areas
Scattered buildings,
DATE:

716.955-718.000 11-30 29 29 2 0.6 Road #4295 crossing


BY:

at STA. 717.605
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

RER Covers
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

unpopulated areas,
BI-49-14044-0001

718.000-719.000 11-30 13 13 2 0.6


G

(DCC) NO. _____________________

Road crossing < 500


m.

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 63


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
719.000-720.000 11-30 24 24 2 0.6 Scattered buildings
RE-ISSUED FOR 100% PROJECT PROPOSAL

RER Covers
ISSUED FOR 100% PROJECT PROPOSAL

720.000-721.000 <10 6 6 1 0.72


unpopulated areas
RER Covers
721.000-724.000 <10 0 0 1 0.72
unpopulated areas
DESCRIPTION

RER Covers
724.000-725.000 <10 7 7 1 0.72
unpopulated areas
RER Covers
725.000-737.000 <10 0 0 1 0.72
unpopulated areas
ADDENDUM IFB

RER Covers
737.000-738.000 <10 1 1 1 0.72
unpopulated areas
RER Covers
738.000-739.700 <10 0 0 1 0.72
unpopulated areas
RER Covers
unpopulated areas,
JO/EWO
10-14044-

49-14044-

49-14044-

Road crossing at
0001

0001

0001

739.700-741.110 <10 2 2 2 0.6


STA. 740.410,
Asphalt Road < 500
05/31/23

10/15/23
04/26/23
DATE

m
RER Covers
741.110-742.000 <10 6 6 1 0.72
unpopulated areas
NO.
REV

G
F
E

RER Covers
DISCIPLINE 742.000-743.000 <10 4 4 1 0.72
ENGINEER unpopulated areas
BD
RER Covers
10/15/23 743.000-744.000 <10 2 2 1 0.72
DATE: unpopulated areas
PROJECT
RER Covers
ENGINEER
744.000-745.000 <10 0 0 1 0.72
JMM unpopulated areas
10/15/23 RER Covers
DATE: 745.000-745.335 <10 0 0 1 0.72
CERTIFIED unpopulated areas
BKH RER Covers
DATE:
10/15/23 unpopulated areas,
CONSTRUCTION Road #4295 crossing
AGENCY 745.335-746.505 <10 0 0 2 0.6
at STA. 745.900,
Asphalt Road < 500
DATE:
m
OPERATIONS
RER Covers
746.505-747.000 <10 0 0 1 0.72
unpopulated areas
DATE: SV AT STA. 748.339,
747.000-753.000 1 0.72
CONTROL NUMBER

<10 0 0 RER Covers


VERIFICATION

unpopulated areas
EDSD

RER Covers
753.000-754.000 <10 2 2 1 0.72
unpopulated areas
DATE:
BY:

RER Covers
754.000-755.000 <10 6 6 1 0.72
unpopulated areas
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

RER Covers
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

755.000-756.000 <10 8 8 1 0.72


BI-49-14044-0001

unpopulated areas
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 64


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
RER Covers
RE-ISSUED FOR 100% PROJECT PROPOSAL

756.000-757.000 <10 1 1 1 0.72


unpopulated areas
ISSUED FOR 100% PROJECT PROPOSAL

RER Covers
757.000-757.355 <10 5 5 1 0.72
unpopulated areas
RER Covers
DESCRIPTION

unpopulated areas,
757.355-758.360 <10 5 5 2 0.6 Road crossing at
STA. 757.840
RER Covers
758.360-763.430 <10 0 0 1 0.72
unpopulated areas
ADDENDUM IFB

RER Covers
unpopulated areas,
763.430-764.440 <10 0 0 1 0.6
Road crossing at
STA. 763.925
RER Covers
764.440-771.000 <10 0 0 1 0.72
unpopulated areas
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

RER Covers
771.000-772.000 <10 3 3 1 0.72
unpopulated areas
05/31/23

10/15/23
04/26/23
DATE

RER Covers
772.000-773.000 <10 0 0 1 0.72
unpopulated areas
RER Covers
773.000-774.000 <10 6 6 1 0.72
NO.
REV

G
F
E

unpopulated areas
DISCIPLINE RER Covers
ENGINEER 774.000-775.000 <10 3 3 1 0.72
BD unpopulated areas
10/15/23 RER Covers
DATE: 775.000-775.600 <10 3 3 1 0.72
PROJECT unpopulated areas
ENGINEER
JMM
Scattered buildings,
10/15/23
775.600-776.620 11-30 16 16 2 0.6 Road crossing at
DATE:
CERTIFIED
STA. 776.120
RER Covers
BKH
776.620-777.000 <10 0 0 1 0.72
10/15/23
unpopulated areas
DATE:
RER Covers
CONSTRUCTION 777.000-778.000 <10 3 3 1 0.72
AGENCY unpopulated areas
RER Covers
778.000-780.000 <10 0 0 1 0.72
DATE: unpopulated areas
OPERATIONS 2ND STS AT KM
780.000-781.000 <10 9 9 1 0.72
780.312
RER Covers
DATE: 781.000-782.000 <10 0 0 1 0.72
unpopulated areas
CONTROL NUMBER
VERIFICATION

RER Covers
782.000-783.000 <10 6 6 1 0.72
EDSD

unpopulated areas
RER Covers
783.000-794.000 <10 0 0 1 0.72
DATE:

unpopulated areas
BY:

RER Covers
794.000-795.000 <10 7 7 1 0.72
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

unpopulated areas
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

RER Covers
BI-49-14044-0001

795.000-797.000 <10 3 3 1 0.72


G

(DCC) NO. _____________________

unpopulated areas

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 65


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
RER Covers
RE-ISSUED FOR 100% PROJECT PROPOSAL

797.000-810.000 <10 0 0 1 0.72


unpopulated areas
ISSUED FOR 100% PROJECT PROPOSAL

RER Covers
810.000-811.000 <10 2 2 1 0.72
unpopulated areas
SV AT STA. 811.864,
DESCRIPTION

811.000-816.815 <10 0 0 1 0.72 RER Covers


unpopulated areas
RER Covers
unpopulated areas,
816.815-817.820 <10 7 7 2 0.6
Road crossing at
ADDENDUM IFB

STA. 817.325
RER Covers
817.820-819.000 <10 1 1 1 0.72
unpopulated areas
RER Covers
819.000-820.000 <10 4 4 1 0.72
unpopulated areas
JO/EWO
10-14044-

49-14044-

49-14044-

RER Covers
820.000-821.000 <10 2 2 1 0.72
0001

0001

0001

unpopulated areas
RER Covers
821.000-822.000 <10 0 0 1 0.72
05/31/23

10/15/23
04/26/23
DATE

unpopulated areas
822.000-823.000 11-30 12 12 2 0.6 Scattered buildings
823.000-824.000 11-30 16 16 2 0.6 Scattered buildings
NO.
REV

G
F
E

DISCIPLINE 824.000-825.000 11-30 20 20 2 0.6 Scattered buildings


ENGINEER
BD 825.000-831.000 <10 0 0 1 0.72 Scattered buildings
10/15/23
DATE: 831.000-832.000 11-30 11 11 2 0.6 Scattered buildings
PROJECT
ENGINEER RER Covers
832.000-833.000 <10 0 0 1 0.72
JMM unpopulated areas
10/15/23
DATE: RER Covers
CERTIFIED 833.000-834.000 <10 3 3 1 0.72
unpopulated areas
BKH
RER Covers
10/15/23 834.000-835.000 <10 9 9 1 0.72
DATE: unpopulated areas
CONSTRUCTION
AGENCY
SV AT STA. 843.793,
835.000-860.000 <10 0 0 1 0.72 RER Covers
DATE:
unpopulated areas
OPERATIONS RER Covers
860.000-861.000 <10 5 5 1 0.72
unpopulated areas
RER Covers
DATE: 861.000-862.000 <10 9 9 1 0.72
unpopulated areas
CONTROL NUMBER
VERIFICATION

RER Covers
862.000-865.000 <10 0 0 1 0.72
unpopulated areas
EDSD

RER Covers
865.000-866.000 <10 8 8 1 0.72
DATE:

unpopulated areas
BY:

RER Covers
866.000-867.000 <10 1 1 1 0.72
unpopulated areas
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

RER Covers
867.000-870.000 <10 0 0 1 0.72
BI-49-14044-0001
G

unpopulated areas
(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 66


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
RER Covers
RE-ISSUED FOR 100% PROJECT PROPOSAL

870.000-871.000 <10 6 6 1 0.72


unpopulated areas
ISSUED FOR 100% PROJECT PROPOSAL

RER Covers
871.000-872.000 <10 8 8 1 0.72
unpopulated areas
SV AT STA. 875.014,
DESCRIPTION

872.000-880.800 <10 0 0 1 0.72 RER Covers


unpopulated areas
RER Covers
unpopulated areas,
Road (HWY 209)
ADDENDUM IFB

880.800-882.000 <10 0 0 1 0.6


crossing at STA.
881.465, Asphalt
Road < 500 m
882.000-883.000 <10 20 20 1 0.6 Scattered Buildings
RER Covers
883.000-884.000 <10 3 3 1 0.72
JO/EWO
10-14044-

49-14044-

49-14044-

unpopulated areas
0001

0001

0001

RER Covers
884.000-885.000 <10 0 0 1 0.72
unpopulated areas
05/31/23

10/15/23
04/26/23
DATE

RER Covers
885.000-886.000 <10 3 3 1 0.72
unpopulated areas
RER Covers
NO.
REV

886.000-887.000 <10 4 4 1 0.72


G
F
E

unpopulated areas
DISCIPLINE
ENGINEER RER Covers
887.000-888.000 <10 5 5 1 0.72
BD unpopulated areas
10/15/23
DATE: RER Covers
PROJECT 888.000-889.000 <10 3 3 1 0.72
ENGINEER unpopulated areas
JMM RER Covers
889.000-903.000 <10 0 0 1 0.72
DATE:
10/15/23 unpopulated areas
CERTIFIED RER Covers
903.000-904.525 <10 6 6 1 0.72
BKH unpopulated areas
DATE:
10/15/23 Scattered Buildings,
CONSTRUCTION Road (Alrisasah Rd)
AGENCY 904.525-905.650 11-30 17 17 2 0.6
crossing at STA.
905.105
DATE:
RER Covers
OPERATIONS 905.650-907.014 <10 0 0 1 0.72
unpopulated areas
SV AT STA. 907.014,
DATE: 907.014-908.000 <10 0 0 1 0.5 RER Covers
CONTROL NUMBER

unpopulated areas
VERIFICATION

Location Class 3
EDSD

Selected during
DBSP
DATE:

908.000-909.000 1 0.5
BY:

<10 5 5 in conjunction with


COMPANY due to
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

future expansion of
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

residential areas
BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 67


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
Location Class 3
RE-ISSUED FOR 100% PROJECT PROPOSAL

Selected during
ISSUED FOR 100% PROJECT PROPOSAL

DBSP
909.000-911.000 <10 0 0 1 0.5 in conjunction with
COMPANY due to
DESCRIPTION

future expansion of
residential areas
Location Class 3
Selected during
DBSP
ADDENDUM IFB

911.000-912.000 <10 4 4 1 0.5 in conjunction with


COMPANY due to
future expansion of
residential areas
Location Class 3
Selected during
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

DBSP
912.000-913.000 <10 5 5 1 0.5 in conjunction with
COMPANY due to
05/31/23

10/15/23
04/26/23
DATE

future expansion of
residential areas
NO.
REV

Location Class 3
G
F
E

DISCIPLINE Selected during


ENGINEER
BD
DBSP
10/15/23
913.000-914.000 <10 0 0 1 0.5 in conjunction with
DATE:
PROJECT
COMPANY due to
ENGINEER future expansion of
JMM residential areas
10/15/23
DATE: Location Class 3
CERTIFIED Selected during
BKH
DBSP
10/15/23
DATE: 914.000-915.000 <10 14 14 1 0.5 in conjunction with
CONSTRUCTION
AGENCY
COMPANY due to
future expansion of
DATE:
residential areas
OPERATIONS Location Class 3
Selected during
DBSP
DATE:
915.000-916.000 <10 5 5 1 0.5 in conjunction with
CONTROL NUMBER

COMPANY due to
VERIFICATION

future expansion of
EDSD

residential areas
Location Class 3
DATE:
BY:

Selected during
916.000-917.000 <10 7 7 1 0.5 DBSP
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

in conjunction with
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001

COMPANY due to
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 68


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
future expansion of
RE-ISSUED FOR 100% PROJECT PROPOSAL

residential areas
ISSUED FOR 100% PROJECT PROPOSAL

Location Class 3
Selected during
DESCRIPTION

DBSP
917.000-918.000 <10 0 0 1 0.5 in conjunction with
COMPANY due to
future expansion of
ADDENDUM IFB

residential areas
Location Class 3
Selected during
DBSP
918.000-919.000 <10 3 3 1 0.5 in conjunction with
COMPANY due to
JO/EWO
10-14044-

49-14044-

49-14044-

future expansion of
0001

0001

0001

residential areas
Location Class 3
05/31/23

10/15/23
04/26/23
DATE

Selected during
DBSP
919.000-920.000 <10 11 11 1 0.5 in conjunction with
NO.
REV

G
F
E

COMPANY due to
DISCIPLINE
ENGINEER
future expansion of
BD residential areas
DATE:
10/15/23 Location Class 3
PROJECT Selected during
ENGINEER
JMM
DBSP
10/15/23
920.000-921.000 <10 6 6 1 0.5 in conjunction with
DATE:
CERTIFIED
COMPANY due to
BKH future expansion of
10/15/23
residential areas
DATE:
CONSTRUCTION
Location Class 3
AGENCY Selected during
DBSP
DATE: 921.000-922.000 <10 0 0 1 0.5 in conjunction with
OPERATIONS COMPANY due to
future expansion of
DATE:
residential areas
SV AT STA. 922.014,
CONTROL NUMBER
VERIFICATION

RER Covers
EDSD

unpopulated areas,
Location Class 3
DATE:

Selected during
BY:

922.000-923.000 <10 1 1 1 0.5


DBSP
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,

in conjunction with
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

COMPANY due to
BI-49-14044-0001
G

future expansion of
(DCC) NO. _____________________

residential areas

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 69


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
Location Class 3
RE-ISSUED FOR 100% PROJECT PROPOSAL

Selected during
ISSUED FOR 100% PROJECT PROPOSAL

DBSP
923.000-924.270 <10 1 1 1 0.5 in conjunction with
COMPANY due to
DESCRIPTION

future expansion of
residential areas
RER Covers
unpopulated areas,
Road (Rd. 55)
ADDENDUM IFB

crossing at STA.
924.765, Location
924.270-925.630 <10 0 0 2 0.5 Class 3 Selected
during DBSP
in conjunction with
COMPANY due to
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

future expansion of
residential areas
Location Class 3
05/31/23

10/15/23
04/26/23
DATE

Selected during
DBSP
NO.
REV

925.630-926.000 <10 0 0 1 0.5 in conjunction with


G
F
E

DISCIPLINE COMPANY due to


ENGINEER
BD
future expansion of
10/15/23
residential areas
DATE:
PROJECT
RER Covers
ENGINEER unpopulated areas,
JMM Road crossing at
10/15/23
DATE: STA. 932.495,
CERTIFIED Location Class 3
BKH
926.000-927.000 <10 1 1 1 0.5 Selected during
10/15/23
DATE: DBSP
CONSTRUCTION
AGENCY
in conjunction with
COMPANY due to
future expansion of
DATE:
OPERATIONS residential areas
Location Class 3
Selected during
DATE: DBSP
CONTROL NUMBER

927.000-927.800 <10 0 0 1 0.5 in conjunction with


VERIFICATION

COMPANY due to
EDSD

future expansion of
residential areas
DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 70


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PDI per
Area
PL RER Each 1 Design
ENGG CERT

No of Location Remark
BKH

BKH

BKH

Sections KM No. of Factor


Equivalent Class
Section Buildings
Buildings
BD

BD

BD

No. of 1, 2, 3, or
From- To (km) (F)
Buildings 4
RER Covers
RE-ISSUED FOR 100% PROJECT PROPOSAL

unpopulated areas,
ISSUED FOR 100% PROJECT PROPOSAL

Road crossing at
STA. 928.310,
Location Class 3
927.800-928.875 2 0.5
DESCRIPTION

<10 0 0 Selected during


DBSP
in conjunction with
COMPANY due to
future expansion of
ADDENDUM IFB

residential areas
Location Class 3
Selected during
DBSP
928.875-933.900 <10 0 0 1 0.5 in conjunction with
COMPANY due to
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001

future expansion of
residential areas
RER Covers
05/31/23

10/15/23
04/26/23
DATE

unpopulated areas,
Road crossing at
NO.
REV

STA. 934.400,
G
F
E

DISCIPLINE Location Class 3


ENGINEER
BD
933.900-934.905 <10 0 0 2 0.5 Selected during
10/15/23
DBSP
DATE:
PROJECT
in conjunction with
ENGINEER COMPANY due to
JMM future expansion of
10/15/23
DATE: residential areas
CERTIFIED Location Class 3
BKH
Selected during
10/15/23
DATE: DBSP
CONSTRUCTION
AGENCY
934.905-936.910 <10 0 0 1 0.5 in conjunction with
COMPANY due to
future expansion of
DATE:
OPERATIONS residential areas
RER Covers
unpopulated areas,
DATE: Asphalt road < 500
CONTROL NUMBER

m, Class 3 Selected
VERIFICATION

during DBSP in
EDSD

936.910-937.472 <10 0 0 2 0.5 conjunction with


COMPANY due to
DATE:
BY:

future expansion of
residential areas.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

Scraper reciver at
OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001

Shoqaiq
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 71


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS

SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Note:
1. According to CONTRACTOR available information there is no temporary camps or future building
ENGG CERT

BKH

BKH

BKH

developments within pipeline RER.


BD

BD

BD

2. Area classification 3 with design factor 0.5 to be considered starting from KM 907.014 up to KM 937.472
at scraper receiver at Shoqaiq due to future population expansion and development in nearby Shoqaiq.
RE-ISSUED FOR 100% PROJECT PROPOSAL
ISSUED FOR 100% PROJECT PROPOSAL
DESCRIPTION

ADDENDUM IFB
JO/EWO
10-14044-

49-14044-

49-14044-
0001

0001

0001
05/31/23

10/15/23
04/26/23
NO. DATE
REV

G
F
E

DISCIPLINE
ENGINEER
BD
10/15/23
DATE:
PROJECT
ENGINEER
JMM
10/15/23
DATE:
CERTIFIED
BKH

10/15/23
DATE:
CONSTRUCTION
AGENCY

DATE:
OPERATIONS

DATE:
CONTROL NUMBER
VERIFICATION
EDSD

DATE:
BY:
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE


BI-49-14044-0001
G

(DCC) NO. _____________________

Pipeline Location Classification DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

Master Gas System Expansion Phase III DOC 72


U48 A PE-041054
Main Pipelines of G
EWJZG-1 SEC II CORRIDOR SAUDI ARABIA JO / EWO: BI-49-14044-0001 74
EDSD/2616-0399.doc
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
Appendix 1.3 RER APPROVAL FROM PREVIOUS PROJECT STAGE

U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX

BI-49-14044-0001
DRAWING NO.

PE-041054
of
73

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
EDSD REV
REVISION
REVISIONCERTIFICATION
CERTIFICATE VERIFICATION NO. DATE JO/EWO DESCRIPTION ENGG CERT PMT OPRNS
G

DATE:
DATE:
DATE:
DATE:
DATE:
THIS INDICATES THAT REV. NO.__________
10-14044-
E 04/26/23 ADDENDUM IFB BD BKH
OF THIS DRAWING IS COVERED, FOR ALL 0001
CONTROL NUMBER

BD
49-14044-

BKH
JMM
APPROVAL/CERTIFICATION REQUIREMENTS, 05/31/23 BD BKH
F ISSUED FOR 100% PROJECT PROPOSAL

AGENCY
BY: 0001

PROJECT
BY DRAWING COMPLETION CERTIFICATE

ENGINEER
ENGINEER
DISCIPLINE

CERTIFIED
49-14044-

10/15/23
10/15/23
10/15/23

OPERATIONS
CONSTRUCTION
BI-49-14044-0001
(DCC) NO. _____________________
G 10/15/23 RE-ISSUED FOR 100% PROJECT PROPOSAL BD BKH
DATE: 0001
Saudi Aramco 2616-ENG (03/99)

Main Pipelines
EWJZG-1 SEC II CORRIDOR
Pipeline Location Classification
Master Gas System Expansion Phase III
DOC
DWG.TYPE

SAUDI ARABIA
U48
PLANT NO.

JO / EWO:
SAUDI ARABIAN OIL COMPANY

A
INDEX

BI-49-14044-0001
DRAWING NO.

PE-041054
of
74

74
SHT.NO.

EDSD/2616-0399.doc
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

You might also like