0% found this document useful (0 votes)
18 views93 pages

Material Submittal_ For High Density Extruded Polystyrene

This document is a material submittal for high-density extruded polystyrene boards intended for the Turtle Bay Canteens construction project. It includes compliance statements, product specifications, and a checklist of required documents, with the submitting contractor being Al-Masar Al-Hadeeth. The revision date is February 2, 2025, and the document outlines various compliance and approval requirements for the materials proposed.

Uploaded by

Taiwo Oshin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views93 pages

Material Submittal_ For High Density Extruded Polystyrene

This document is a material submittal for high-density extruded polystyrene boards intended for the Turtle Bay Canteens construction project. It includes compliance statements, product specifications, and a checklist of required documents, with the submitting contractor being Al-Masar Al-Hadeeth. The revision date is February 2, 2025, and the document outlines various compliance and approval requirements for the materials proposed.

Uploaded by

Taiwo Oshin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 93

Material Submittal

RSG-CN-TMP-0007

Material Submittal
Program: Turtle Bay Canteens Construction
Project: Permanent Canteens
Project Code: R03-C10C01 & L05-O05C01
Package: P3
Material Submittal for High Density Extruded Polystyrene
Material Boards for the void former area - Forma Industry

Document Number

Revision C0

Revision Date 2-2-2025

Discipline Civil
Submitting Contractor Al-Masar Al-Hadeeth

RSG-CN-TMP-0007

RSG-CN-TMP-0007 FOR INTERNAL USE ONLY


Rev. 02, 23 May 2024 Page | 0
Material Submittal
RSG-CN-TMP-0007

Revision History
Details of
Rev. Date Prepared By Reviewed By Approved By
Revision

CO 2-2-2025 2-2-2025 Richard Corpuz Oshin Taiwo Saber Abdelfatah

RSG-CN-TMP-0007 FOR INTERNAL USE ONLY


Rev. 02, 23 May 2024 Page | 1
Material Submittal
RSG-CN-TMP-0007

TABLE OF CONTENTS
1 Product Information ................................................................................................................................ 5
2 Statement of Compliance ....................................................................................................................... 6
3 Scope of Works ......................................................................................................................................... 8
4 Specification Compliance Check List ................................................................................................... 10
5 Technical Data Sheet ............................................................................................................................. 12
6 Sample (List / Photos) ............................................................................................................................ 14
7 Test Reports............................................................................................................................................ 16
8 LEED Compliance & Certificates ........................................................................................................... 19
9 Country of Origin – Confirmation Letter ............................................................................................. 21
10 Product Authority Approval ................................................................................................................. 23
11 Draft Warranty ....................................................................................................................................... 31
12 Manufacturer Recommended Spare Parts .......................................................................................... 33
13 Previous Project Approvals ................................................................................................................... 34
14 Trade License.......................................................................................................................................... 74
15 Manufacturer Confirmation of the local Agent .................................................................................. 77
16 Project Reference List ........................................................................................................................... 78
17 Company Profile ..................................................................................................................................... 83

RSG-CN-TMP-0007 FOR INTERNAL USE ONLY


Rev. 02, 23 May 2024 Page | 2
Material Submittal
RSG-CN-TMP-0007

Compliance
Sl
Description Not Not Remarks
No Provided
Provided Applicable

1 Statement of Compliance ☒ ☐ ☐
2 Scope of Works ☒ ☐ ☐
Specification Compliance
3
Check List ☐ ☒ ☐
4 Technical Data Sheet ☒ ☐ ☐
5 Test Reports ☒ ☐ ☐
6 LEED Compliance ☐ ☒ ☐
7 Country of Origin ☒ ☐ ☐
8 Authority Approvals ☒ ☐ ☐
9 Draft Warranty ☒ ☐ ☐
10 Recommended Spare Parts ☐ ☐ ☒
11 Trade Licence ☒ ☐ ☐
12 Project References ☒ ☐ ☐
Previous revision comment
13
tracker
☒ ☐ ☐
The above checklist is the minimum requirement, subject to review by the Employer and or Assistants.

Prepared By Reviwed By Approved By

Name Richard Corpuz Oshin Taiwo Saber Abdelfatah


Production
Designation
manager QAQC Manager Project Manager

Sign

Date 30/01/2025 2-2-2025 2-2-2025

Stamp

RSG-CN-TMP-0007 FOR INTERNAL USE ONLY


Rev. 02, 23 May 2024 Page | 3
Material Submittal
RSG-CN-TMP-0007

PREVIOUS REVISION COMMENTS AND CONTRACTOR


RESPONSE

Program: XX
Project: XXXX
Package:
Material
Document Number
Revision
Revision Date
Discipline
Submitting
Contractor
RSG-CN-TMP-0007 FOR INTERNAL USE ONLY
Rev. 02, 23 May 2024 Page | 4
Material Submittal
RSG-CN-TMP-0007

1 Product Information
[ Following table to be populated as minimum}
Sl
Description Value Remarks
No
01 Material Description Extruded Polystyrene

Specification Drawing BOQ


02 Reference

Name: Forma Industry


04 Manufacturer
Address: Scoop Industrial Area, Dammam
Name: Forma Industry
05 Supplier
Address: Scoop Industrial Area, Dammam

06 Country of Origin Saudi Arabia

TRSDC vendor List


07 Yes or No
Compliance
Project location to be
08
used

09 Required Date on Site

Manufacturing duration
10
(Ex- Factory)
Shipment duration
11
(Ex-factory to Site)

12 Expected Arrival on Site

RSG-CN-TMP-0007 FOR INTERNAL USE ONLY


Rev. 02, 23 May 2024 Page | 5
Material Submittal
RSG-CN-TMP-0007

2 Statement of Compliance

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 6 of 92
Material Submittal
RSG-CN-TMP-0007

Statement of Compliance

Date:29/01/2025

Program: Turtle Bay Canteen Busilings

Project: Permanent Canteens

Package: Supply of Extruded Polystyrene

Subject: Statement of Compliance for Material Extruded Polystyrene

I, as the Authorized representative from the Supplier/ Manufacturer, acknowledge and certify the material submission
covered under this document Extruded Polystyrene is produced in accordance with following.

☒ Compliance with Contract Specifications

☒ Compliance with Contract Drawings

☐ Compliance with Contractual Requirements

☐ Compliance with Authority Requirements

☐ Compliance with LEED requirements

Name: Wajih Idriss Title:

Managing Partner

Signature:

Stamp:

Forma Industry
CR# 2050180696
Scoop Industrial City, Block 3, S20-25,
Dammam,SaudiArabia
www.formainsulation.com

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 7 of 92
Material Submittal
RSG-CN-TMP-0007

3 Scope of Works

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 8 of 92
Material Submittal
RSG-CN-TMP-0007

Date: January 30, 2025

Ref.: FI-0002-25

Subject: Scope of work

To whom it may concern

This letter confirms that Forma Industry will supply only Extruded Polystyrene for the Permanent Canteens project.

Name: Wajih Idriss

Title: Managing Partner

Signature:

Stamp:

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 9 of 92
Material Submittal
RSG-CN-TMP-0007

4 Specification Compliance Check List

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 10 of 92
Date: 01/02/2025
Client: Al-Masar Al-Hadeeth
Project Name: Permanen Canteens
Product Name: Extruded Polystyrene

COMPLIANCE STATEMENT

Specification Section/ Sub- Proposed Material Compliant


SN Project Specification Comment
section/ Clause reference Forma Industry Specification (Yes/ No)

Extruded Polystyrene Extruded Polystyrene


Density 35 kg/m3 Density 32-35 kg/m3
Thickness: Refer to drawings Thickness: As per the drawing provided
1 ASTM C578 Yes
Compressive Strength 10% Deformation: 300 kPa Compressive Strength 10% Deformation: 299.89 kPa
Thermal Conductivity:0.030W/m.K Thermal Conductivity:0.0300W/m.K
Flexural Strength: 44 kn/m2; 60 Psi Flexural Strength:517 kPa

Date 01/02/2025 Name: Younes Alnadi Signature

Forma Industry
CR# 2050180696
Scoop Industrial City, Block 3, S20-25,
Dammam, Saudi Arabia
www.formainsulation.com
Material Submittal
RSG-CN-TMP-0007

PART 2 - PRODUCTS

2.1 THERMAL AND ACOUSTIC INSULATION

A. Foam Plastic Board Insulation for Thermal Roofs

1. Extruded-Polystyrene Rigid Foam (XPS): ASTM C 578, Type VI, rigid extruded, closed cell structure
of type and minimum compressive strength indicated below:

a. Thickness: Refer to drawings, conform with ASTM D 1622 - Comply


b. Compressive Strength: 300 KPa (ASTM D 1621); 44 Psi (DIN 5341) - Comply
c. Thermal Conductivity: 0.030 W/m.K (ASTM C 518) - Comply
d. Nominal Density: 35 kg/m³, ASTM D 1622. - Comply
e. Reaction to Fire: Class B1, DIN 4102-1 - Comply
f. Flexural Strength: 44 Kn/m²; 60 Psi (ASTM C 203-05a) - Comply
g. U-Value: 0.301 W/ (m2.k), ASTM C 1199 - Comply

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 11 of 92
Material Submittal
RSG-CN-TMP-0007

5 Technical Data Sheet

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 12 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 13 of 92
Material Submittal
RSG-CN-TMP-0007

6 Sample (List / Photos)

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 14 of 92
Material Submittal
RSG-CN-TMP-0007

EXTRUDED POLYSTYRENE

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 15 of 92
Material Submittal
RSG-CN-TMP-0007

7 Test Reports

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 16 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 17 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 18 of 92
Material Submittal
RSG-CN-TMP-0007

8 LEED Compliance & Certificates

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 19 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 20 of 92
Material Submittal
RSG-CN-TMP-0007

9 Country of Origin – Confirmation Letter

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 21 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 22 of 92
Material Submittal
RSG-CN-TMP-0007

10 Product Authority Approval


[ Following certificates / approval evidence to be provide as applicable

1. GOSI (General Organization for Social Insurance) Certificate

2. Saudization Certificate

3. ZAKAT & Tax Certificate

4. VAT Registration Certificate

5. Saudi Contractors Authority (SCA) Membership

6. SAGIA (Saudi Arabian General Investment Authorities) Certificate

7. Civil Defense Approval, *if required

8. Electricity & Water Authority Approval, *if required

9. Telecom Network provider Approval, *if required

10. Proof of Certification/Listings, as specified (eg. UL, FM , CE etc.)

11. SASO certification}

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 23 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 24 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 25 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 26 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 27 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 28 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 29 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 30 of 92
Material Submittal
RSG-CN-TMP-0007

11 Draft Warranty

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 31 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 32 of 92
Material Submittal
RSG-CN-TMP-0007

12 Manufacturer Recommended Spare Parts

N/A

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 33 of 92
Material Submittal
RSG-CN-TMP-0007

13 Previous Project Approvals


a) Red Sea Projects

b) Other Projects

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 34 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 35 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 36 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 37 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 38 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 39 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 40 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 41 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 42 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 43 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 44 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 45 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 46 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 47 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 48 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 49 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 50 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 51 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 52 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 53 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 54 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 55 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 56 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 57 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 58 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 59 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 60 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 61 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 62 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 63 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 64 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 65 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 66 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 67 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 68 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 69 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 70 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 71 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 72 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 73 of 92
Material Submittal
RSG-CN-TMP-0007

14 Trade License

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 74 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 75 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 76 of 92
Material Submittal
RSG-CN-TMP-0007

15 Manufacturer Confirmation of The Local Agent


N/A

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 77 of 92
Material Submittal
RSG-CN-TMP-0007

16 Project Reference List

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 78 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 79 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 80 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 81 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 82 of 92
Material Submittal
RSG-CN-TMP-0007

17 Company Profile

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 83 of 92
Material Submittal
RSG-CN-TMP-0007

COMPANY DATA

Company Name: Forma Industry

Product Line Extruded/Expanded Polystyrene

Wajih Idriss
Company Owner
Athony Tarazi

Company Type Limited Liability

Year Established 2014

Commercial Registration NO. 2050180696

Company Industrial License 45229226

Factory Location Scoop Industrial Area, Block 3, S21-25

Email [email protected]

Webiste www.formainsulation.com

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 84 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 85 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 86 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 87 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 88 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 89 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 90 of 92
Material Submittal
RSG-CN-TMP-0007

RSG-CN-TMP-0007
Rev. 02, 23 May 2024 Page 91 of 92

You might also like