2ijk
2ijk
AMRAVATI, PHASE-
PHASE-1 (5 X 270MW)
FOREWORD MESSAGE FROM SR VP(O&M)
Thermal Power plant is highly capital intensive and in order to derive sustained capacity utilization, with high availability &
Plant Load Factors, sound O&M principles & practices should be adopted to run the stations in most cost effective manner.
Availability of technical information pertaining to equipments (locations and layouts) is of paramount importance for
effective, efficient and reliable operation and maintenance of the plant. For dissemination of Knowledge on Technical Data
and Schemes pertaining to various systems to all O&M Engineers and related functionaries, Scheme Tracing Book is being
published.
A need has been felt for preparing Scheme Tracing Book for providing detailed information to the O&M Engineers, Graduate
Engineer Trainee for improvement of their knowledge level for day to day working and also for executives of other related
functions.
I appreciate the efforts made by the Operation Team in preparing Scheme Tracing Book and publishing the same in a very
short period of time which will be very helpful for the use of new entrants and executives of all functions.
(MUKESH SINGHAL)
FOREWORD MESSAGE FROM VP(O&M)
Power is the most vital necessity for industrial and economical growth of any nation. Electricity can bring sea
changes in quality of life of its society members. INDIABULLS in its endeavour for becoming most significant entity
in Indian Power Sector as one of the Giant IPPs in our country by untiring and relentless efforts and reaffirm its
commitment towards making India a self-reliant nation in the field of power generation. Having proven excellence
in the field of Project Execution for the first time we are going ahead with the commissioning of its First Unit of
270MW at Amravati.
In the present time, efficient and economical power generation is the only answer to realise our ambitious plan. It
is the need of the hour that available human resources who are the at the whelm of the affairs managing the large
thermal power plants having sophisticated technology and complex controls, is to be properly channelised and
trained. INDIABULLS firmly believes that skill and expertise up-gradation is a continuous process. Therefore,
training gets utmost priority in our company. The Scheme Tracing Book provide the adequate reference information
to augment systematic learning process. Systematic Learning Process always boosts up confidence level to an
optimum point in a risk-free, cost and time effective way. Emergency handling, day-to-day operation and
maintenance is only possible if the concerned engineer is well aware of the system, process and identification of
equipment. Scheme Tracing Book will be of immense help in this matter.
The book comprehensively covers all the schemes of Power Plant which can be useful for fresh as well as
experienced engineers. It provides a direct appreciation of knowledge and enables them to take on responsibility
far more sincerely and effectively.
I am pleased to dedicate this book prepared in a lucid way by young engineers under the guidance of their
respective reporting officers.
I sincerely hope that readers will find this book very useful and the best learning aid to them. I believe that in spite
of all sincere efforts and care of senior members & staff, some area of improvement might have remained
unnoticed. Hence, your valuable suggestions and comments will always be well received and acted upon.
(JAYDEV CHAKRABARTI)
CONTENT
MAIN DRAINAGE & BLOW DOWN LDO AND AIR OPERATING HYDRAZINE
2 12 22
CONNECTION OPERATING FLOOR CONTROL STATION
DM PLANT MCC
61
62 UNIT PMCC
63 CHP MCC
SV - 01
SV - 03 SV - 02 VENT
w
Gauge VENT
Glass
Hydra
Step
DRUM
Drain
Drain
Phosphate
DOWN COMMER
DOWN COMMER
Dozing line Right Left
CBD 21
IBD M
TANK M
DRAIN HEADER
A.ARUN A.PATRA
SLIDE NO – 03
APRDS LHS
SV 4
VENT MS-1
W
MS STRAINER
M
M
c Z MS SV
M
MS-3 MS-5 M
MS-105
HPBP
F
S MS 101 MS CV
To TO UNIT
H IBD Tank FLASH
O/L TANK
H
HPT
E
A
D
MS 102 MS CV
E To
R IBD Tank
MS-4 MS-6
M
c CRH
M
MS MS SV
STRAINER
M
SV 5 TO FLASH MS-106
REV.NO PREPARED BY CHECKED BY
TANK
A.ARUN A.PATRA
SLIDE NO - 04
REHEATER HEADER
W
VENT VENT
SV - 8
DSH DSH
DRAIN
DRAIN
TO DEA. PEGGING
TO AUX. PRDS
TO HPH 6
M
CRH 101
NRV
LPBP LPBP
LHS RHS
M
M
HRH HRH
STRAINER STRAINER
HRH 101 HRH 102
SV 11
W SV 9 SV 10 SV 12
W
REHEATER COIL HEADER (OUTLET)
SV - 8
W
VENT
VENT
DSH DSH
DRAIN
TO DEA. PEGGING
DRAIN
TO AUX. PRDS
TO HPH 6
M
CRH 101 CRH POT DRAIN
HPBP WARM UP LINE
HPBP WARM UP LINE
TITLE HRH LINE DIAGRAM NRV
REV.NO PREPARED BY TAPPING FOR WET STEAM WASHING LINE
CHECKED BY
SH-13
SH-13
SH-11
SH-11
SH-10
SH-10
SH-09
PG PG
S S S S
SD 05 SD 09 SD 08 SD 04 SD 02 SD 06 SD 07 SD 03 WATER
FROM
SD 01 FEED
CONTROL
S STATION
RH-02
SLIDE NO - 07
RH-01
REHEATER OUTLET REHEATER
(LEFT) OUTLET(RIGHT)
E E
REV.NO PREPARED BY CHECKED BY
S S
A.ARUN A.PATRA
H H
S S S S
MILL CONNECTIONS
REV. No. PREPARED BY CHECKED BY
ASHISH VYAWHARE A. PATRA
SLIDE NO - 09
AIR
A20A-D
STEAM
OS60A-D
OS59A-D
OIL GUN
HFO
HO60A-D
LDO
LO40A-D
HO39C
HO33
(HOFCV) EF2 EF3
HO34A HO34B
T
F CD2
O
CD3
HO32A M HO32B HO40
(HOTV) HO38 HO38
B
U
E F R
AB2
N AB3
E
HO32C R
S
#2 #3
HO35
HO38G
HO31 HO49
= WHILE FIRING
EF
T
O
ATM H
AIR CD
A01 E
A
I
AB LO29A-D
G
N AB
OS35A I TO BURNERS
T
O
F R
LDO FROM M S
PUMPS LO21 LO31A LO31B LO30 LO24A LO23 LO24B
(LOTV) (LOFCV) F
O #2 #3
R
#1 #4
LO25 P
LO31C
U
R
LO28C G A08
I
N
G
EF
OS41A-D
CD
AB
FROM AUX.
STEAM HEADER
OS31 OS34A OS33 OS34B
#2 #3
TO HFO LINE #1 #4
TRACING
T OS35
T TRAP
CONDENSATE TO
IBD TANK
TITLE
ATM. STEAM OPERATING FLOOR
REV. No. PREPARED BY CHECKED BY
ASHISH VYAWHARE A. PATRA
PA-A
PAD-9
TO COLD PA HDR PAD-
APH BYPASS 1
AIR AUX
TO HOT MAIN
PA HDR
PAD-7
GD-3 GD-7 SAD-1 FD-A
AEROFOIL
PAD-5
APH-A
SAD-5 C ID-A
EP-A
O
F GD-1 GD- M
U 1A M GD-11 GD-13
R P F H MAIN GD-5 GD-9
R E O
N S S S
H C AIR AUX N GD-4 GD-8 S
A H H H ID-B T
O
C A
H
E C
E
A EP-B GD-12 GD-14 K
SAD-4
D
GD-2 APH-B GD-2A E
R GD-6 GD-10 SAD-2
AEROFOI FD-B
L
PAD-4
PAD-6
TO HOT
PA HDR APH BYPASS PA-B
PAD-8
TO COLD PA HDR PAD-2
B-67
CBD
TANK
VENT
WWSB DRAIN
LRSB DRAIN
AUX PRDS
LCV
APH S/B
DRAINS
VALVES
DRAIN
DRAIN
STOP
EBD
IBD
DRAIN
SCAPH
DRAIN
IBD TANK
OPEN DRAIN
COOLER P
TS S
TG
TG
P COOLER
G PG
P P
G G DPS PG
DPG
PS
RELIE
REC. F V/V
V/V FS
FILTER
FILTER
LS
PG
FLOW
TG DPS ID FAN LUBE OIL SYSTEM
REG.
PR.OIL MAIN
NRV
NRV
W 204
116
BRG
FILTER
218
COOLER
216
215
NRV
PR.REGULATING V/V
W
PRESSURE OIL
OIL TANK
HEATER
A.ARUN A.PATRA
PA FAN S
SLIDE-18
PR.OIL MAIN
NRV
NRV
W 204
116
BRG
FILTER
218
COOLER
216
215
NRV
PR.REGULATING V/V
W
PRESSURE OIL
OIL TANK
HEATER
A.ARUN A.PATRA
SLIDE NO - 19
To Mill Bearings & Gearbox
PREPARED BY
REV.NO CHECKED BY
A.ARUN A.PATRA
FILTER
Relief valve
M
Breather
Screw pump 1 filter & filler
Electric Heater
Oil tank IC
Level indicator
DRAIN
TO BOILER DRUM
M
AGITATOR
VENT PDP A
STRAINER
L STRAINER
G PDP B
PHOSPHATE
MIXING TANK AGITATOR
VENT
.
SLIDE NO - 20
FROM MAIN
SLIDE NO - 21
CONDENSATE TO BOILER COLD FILLING LINE
VENT NaOH
LINE TO DEAREATOR OUTLET
SOLUTION
MANUAL FILLING BY TO CEP DISCHARGE
BOTTLE
BREATHER
TANK
O
VE DRAIN DRAIN
RF
L
L
DRAIN
O G M 1 M 2
W
AMMONIA
MEASURING
TANK 125 LIT METERING PUMPS : 2 NOS
2 X 100%
CAPACITY : 50 LPH
MAX. DISCH. PR. 45 Kg/cm²
AGITATOR
VENT
WATER SEAL
.
FROM MAIN
CONDENSATE TO BOILER COLD FILLING LINE SLIDE NO - 22
VENT HYDRAZINE
LINE TO DEAREATOR OUTLET
SOLUTION
TO CEP DISCHARGE
O
VE BREATHER
RF TANK
L
O DRAIN DRAIN
W
L DRAIN
G M 1 2
HYDRAZINE
MEASURING
TANK 25 LIT METERING PUMPS : 2 NOS
2 X 100%
HANDP
UMP
CAPACITY : 50 LPH
MAX. DISCH. PR. 45 Kg/cm²
AGITATOR
VENT
HYDRAZINE
TITLE HYDRAZINE DOSING SYSTEM
OVERFL BREATHER TANK
OW L
REV.NO PREPARED BY CHECKED BY
G
VENT HYDRAZINE DRAIN A.ARUN A.PATRA
MIXING CUM
STORAGE TANK
2300 LIT
WATER SEAL
.
DRAIN WATER / HYDRAZINE
FD–17
SLIDE NO -23
FD–16 FD–18 NORMAL LOAD BYPASS
SH/RH SPRAY
STATION
FD–16A FD–18A
FEED CONTROL STATION
FD–14
FD–13 FD–15
NORMAL LOAD
FD–21A
FROM HP E–003 E-002
FD–19A
HEATERS
ECO. REC.
ECO. TO RING
DRN./FILL HEADER
TITLE FEED CONTROL STATION
REV NO. PREPARED BY CHECKED BY
KIRAN BHOSALE A. PATRA .
SLIDE NO - 24
AS-9 AS-10
MS - L
AS-11 UNIT APRDS CD-65 CD-64
CD-66
MS - R
SPRAY FROM CEP
DESH-1
AS-35 CD-67 CD-70
AS-34 CD-69
CD-71
AS-15 AS-16
AS-17
CD-72
CRH LT AUX STEAM HEADER
DESH-2
AS-23
AS-27 AS-28 AS-29
AS-48
HFO ATOMISING
MILL INERTING
AS-21
U#4
U#5
U#5
E
CEP DISH
DRIP LINES
FROM DC VENT
W
W
FROM LPH-2
DRIP FROM HPH-5
D/A
FROM LPH-3 LPFT OVERFLOW HPFT DRIP FROM HPH-6
A LPH-3 EXTRACTION
B LPBP STEAM INLET
C LPH-2 EXTRACTION
D LPH-1 EXTRACTION
E CONDENSATE MINIMUM
RECIRCULATION
DMCW IN
SUCTION STRAINER
DMCW OUT
CD - 4
TO DEAERATOR
CD-37 CD-34
LPH-1 EMERGENCY
MAKE UP
CD-31 CONDENSER
CD-33
CD-35 CD-32
MIN. RECIRCULATION
KIRAN BHOSALE A PATRA
CD-29
CEP-B CEP-A
CD-21
TO CST
CD-19 CD-14
CD-23
CD-25
CD-28 FT
CD-27 CD-9
TT
PT
TO APRDS SPRAY
GSC
TO LPBP SPRAY, CD-8 CD-7
EXHAUST HOOD &
PROVISION FOR TURBINE F/B SPRAY
WET STEAM WASHING AMMONIA HYDRAZINE
TO ATM
TO DMCW TANK TO CEP STUFFING BOX SEALING
SLIDE NO - 28
VENT TO CONDENSER
TO DEAERATOR
EX-10
EX-9
LPH - 3 LPHLPH
LPH --
1 2- 2 LPH - 1
CD-37
CD-32
CD-35
DRAIN
DRAIN
COOLER
COOLER
CD-29
CD-34
FD-12 VENT TO
CONDENSER
FD-11 HPH-6
HPH-6
FD-10
DRAIN TO HPH-5/DEA./HP FT.
FD-9 VENT TO
CONDENSER
FD-8
HPH-5
FD-7
DRAIN TO DEA./HP FT
FROM BFP
SLIDE NO - 29
CRH HPH – 5 DRIP CD - 39 CD - 38 SLIDE NO - 30
CRH – 1 HPH – 6 DRIP
DR-12 FROM CEP DISCHARGE
CRH - 4 DR-5
CRH – 2
CRH - 5 VENT FROM CBD TANK VENT
DR-13
CRH – 3 DR-6
DR-11
CRH - 6 DR-4
W
W
DR-14
DR-7 FC-2
FC-3
BFP – A R/C
EX 4 FROM IPT EX-11
DEAERATOR FC-5
FC-6
HYDRAZINE DOSING BFP – B R/C
AMMONIA DOSING
FC-9 FC-8
BFP – C R/C
INITIAL FILLING
AS-7
AS-2
AS-5 DR - 38
DR - 36
BFP SUCTIONS
AS-1
DR - 39
TO UNIT FLASH TANK
S SEPARATION
SOL VLV TANK
S FROM
DMCW
SOL VLV
MOTOR
W
W
CONDENSOR VACUUM PUMP-A
ACW IN
ACW OUT
MOTOR
VACUUM PUMP-B
TITLE CONDENSATE VACUUM SYSTEM
REV NO. PREPARED BY CHECKED BY RECIRCULATION
PUMP
WATER COOLER
ACW IN
KIRAN BHOSALE A PATRA . . .
ACW OUT
DMCW IN SLIDE NO - 32
WORKING OIL LUB OIL
COOLER
M
COOLER DEAREATOR
Recirc to DEA
SUC-VLV
SEAL COOLER
DMCW OUT
TO BRGS
DMCW
FC1
BOOSTER
S MOTOR PUMP
HYDRAULIC
BOILER COUPLING
FEED
PUMP
SCOOP
M
TITLE BOILER FEED PUMP
FD4 REV NO. PREPARED BY CHECKED BY
To BFP DSH HDR A PATRA
KIRAN BHOSALE .
SLIDE NO - 33
BOOSTER HYDRAULIC
PUMP MOTOR COUPLING BFP
TI
TI TI
TI TI
TI
MECHANICAL
SEAL COOLER
DMCW INLET
DMCW OUTLET
TI TI
TI
TI
TI
AOP
W
O
LUB OIL C
COOLERS O
O
L
E
R TS
S
TI
PI PS TI TS
FROM
EXC. BRG.
INJECTOR
3 NO.S 6 NO.S SOST
II
TI OIL COOLER TI TT PS PT
OVEF-2
DMCW
PI PI PI PI PI
PI
AC AC DC AC DC
INJECTOR
I
AOP - 1 AOP - 2 EOP - 1 JOP - 1 JOP - 2
HEATER
BV1 BV2
DIRTY OIL INLET
BV3 BV4
FEED PUMP
SD1
SD2
SLIDE NO - 36
Ex fan
GSC
IPT EXHAUST
HPT LPT
PT
TT
PT
TT TT
MAL-81 MAW-50
MAW-10
TT
TO CONDENSER
EX-106
EX-104
EX-131
EX-130
Condenser
Alt. DRN frm
HPH-6
HPH-6 Vent
HPH-5 Vent
DRN to
HOTWELL
HRH-101
HRH-102
HRH-103
HRH-104
CRH-101
LHS RHS LHS RHS
CRH NRV & HRH Strainer LP Bypass
line DRN DRN Warm-up DRN
TITLE HP FLASH TANK
REV NO. PREPARED BY CHECKED BY
KIRAN BHOSALE A PATRA
SLIDE NO - 38
SLIDE NO - 39
Deaerator NRV EX-119 EX-120 EX-121
DRN from CRH Ex.
Drain line
CRH-118 CRH-117 CRH-116
EX-113 EX-114 EX-115
DRN from line for
EX-126 DEA. Pegging
DRN Manifold
EX-109 EX-107
EX-108
EX-125
Extraction line DRN
EX-128
EX-127
Vent To Condenser Deaerator
EX-129 Overflow DRN
From GSC
DR-34 DR-31
DR-33
Alt. DRN from LP FLASH TANK CEP A Discharge
LPH no.3 elbow vent
CEP B Discharge
elbow vent
Alt. DRN from DRN to
LPH no.2 HOTWELL
DRAIN SOST
LUB OIL
RETURN
HEADER
W FILTERS
SOVP-A IOT O
T
VACCUM
TANK
SOVP-B COOLERS
DC SOP
SOP-1 SOP-2
GENERATOR
SEAL OIL
SYSTEM
SLIDE NO - 40 .
SLIDE NO - 41
OIL TRAP
OIL
FILL
WW
GWFT
W
VAPOURISER
LLD
WWWWWW
VENT
To WOT GAS
ANALYSER FROM CO
CABINET 2
BOTTLE RACK
VENT
SAMPLE
AIR WATER &
SUPPLY OIL TRAP
VENT
VENT VENT
VENT VENT
VENT
DMCW O/L
DMCW I/L
GENERATOR COOLING SYSTEM
TITLE
DRAIN DRAIN REV. No . PREPARED BY CHEKD BY
ASHISH VHYWHARE A PATRA
VENT SLIDE NO - 43
GEN SIDE
DRAIN
RECTIFIER
WHEEL MAIN EXCITER PILOT EXCITER
VENT DRAIN
DRIER - A DRIER - B
H
DEW POINT E
METER A
T
E AIR SUCTION
R
EXHAUST
W
W
2 CONDENSOR
BALL
Water
Forebay CLEANING
SYSTEM
3
Vacuum pump H.E.
Debri discharge pipe 3*50 ACW pumps TITLE CW AND ACW SYSTEM
to drain Capacity= 1000
m3/hr CHECKED
REV. NO. PREPARED BY
BY
Recirculation
Neoprine rubber Hose
Line
(wagon + truck)
Atomising Steam
HFO Unloading B y Wagon
strainer
Heaters
2x150m3/ HFO TANK
hr Cap-
2000m3 strainer
2x150m3 Boiler 1
/hr HFO TANK
Cap-
2000m3 Boiler 2
2*50
m3/hr
HFO Forwording Pumps
HFO Unloading Pumps
HFO Unloading By Tanker
Atomising Steam
strainer
Boiler 3
TITLE HFO FUEL OIL SYSTEM Heaters
HFO Forwording Pumps Boiler 4
CHECKED
REV. NO. PREPARED BY
BY
Boiler 5
BALL VALVE
HFO PUMP-2 NRV
STRAINER
HFO UNLOADING BY WAGON
BALL VALVE
STRAINER NRV
HFO PUMP-4
HFO UNLOADING BY TANKER
BALL VALVE
STRAINER NRV
HFO PUMP-5
Capacity:-
TITLE HFO UNLOADING PUMPS
Pump 1,2,3&4-150 M3/HR
Pump 5& 6 -50 M3/HR PREPARED BY
CHECKED
BY
RETURN LINE
FROM BOILER & PUMP
(TERMINAL POINT 1M
FLAME ARRESTOR OUTSIDE LDO
VENT FORWARDING PUMP
HOUSE)
LEVEL
TRANSMITTER
RETURN LINE
FROM BOILER & PUMP
LEVEL
TRANSMITTER LEVEL
TRANSMITTER
LDO TANK
r
Cap- Boiler 1
1000m3
(1 nos.)
Boiler 2
10m3/hr
Recirculation Line
Boiler 3
Boiler 4
Boiler 5
CHECKED
PREPARED BY
BY
TO LDO TANKS
BALL VALVE
STRAINER NRV
LDO PUMP-2
BALL VALVE
STRAINER NRV
LDO PUP-3
CHECKED
PREPARED BY
BY
FORE BAY
PUMPS PARAMETERS
Discharge :- 3800 CubMPH
Duty Point Head:- 120 MWC
Pump Speed:- 980 RPM
Motor Rating:- 1700 KW
S S S
CHECKED
REV. NO. PREPARED BY BY
RESERVOIR
PRATIK HINGE A.PATRA
TO FW MAIN RING 2 Pump A&B- DIESEL DRIVEN PUMP
TO FW MAIN RING 1
PUMP C & D- MOTOR DRIVEN PUMP
DELIVERY HEADER PUMP E & F – JOCKEY PUMP
TESTING HEADER
TO APH/ESP
PUMP C
WASH PLANT
RAW WATER SUMP
PUM D
PUMP E
PUMP F
TO DM
PLANT TITLE RAW WATER PUMP
PUMP G HOUSE
CHECKED
PREPARED BY
BY
PUMP H
PRATIK
.
HINGE A.PATRA
.
SLIDE NO - 54
AIR COPRESR-1 AC 3
AC 2 AC 4 AC 5 AC 6 AC 7
AIR DRIYER 1 AIR DRIYER 2 AIR DRIYER 3 AIR DRIYER 4 AIR DRIYER 5 AIR DRIYER 6
A B C
A B
GENERATOR
AIR TIGHTNES
CO2 PURGING
CHECKED
PREPARED BY
BY
A B C
FIRE FIGHTING
PUMP HOUSE
TITLE SERVICE AIR LINE
SLIDE NO - 56
SLIDE NO - 57
RAW WATER TANK
ACTIVE FLOW
ULTRA FILTER
RO FEED TANK
REVERSE OSMOSIS
DM FEED TANK
TITLE WATER TREATMENT
PLANT
MIX BED PREPARED BY
CHECKED
BY
SLIDE NO - 58
SCRAPER CHAIN CONV. ( 1W+1S
BELT BELT
)
FROM UNITS
CONV 2A CONV 3
#2,3,4&5 BYPASS
CLINKER JNT 1A JNT 3
CHUTE
GRINDER
JNT 2
(1W+1S)
DOSING BELT
BELT
CONV
4 CONV
4
JNT 6 JNT 5 JNT 4
BELT CONV
SLUDGE PIT 5A BELT CONV
5B
SLUDGE JNT 7
PUMPS(1W+1S)
RF 08 RF 07 RF 06 RF 05 RF O4 RF 03 RF 02 RF 01
RE 08 RE 07 RE 06 RE 05 RE 04 RE 03 RE 02 RE 01
RD 08 RD 07 RD 06 RD 05 RD 04 RD 03 RD 02 RD O1
RC 08 RC 07 RC 06 RC 05 RC 04 RC 03 RC 02 RC 01
RB 08 RB 07 RB 06 RB 05 RB 04 RB 03 RB 02 RB 01
RA 08 RA 07 RA 06 RA 05 RA 04 RA 03 RA 02 RA 01
Pass B Pass A
Gas Flow
TITLE ESP
Gas Flow
CHECKED
#Same arrangement is REV. NO. PREPARED BY
BY
applicable for other Four Units
PRATIK HINGE A.PATRA
CHP SCHEMATIC ARRANGEMENT WT-1 WT-2 WT-3
2A 2A 1A 1A
PENT
JNT-4 TH – 3 TH – 1 TH-2
HOUSE
2B 1B 1B
SP4 2B SP-3 SP-2 SP-1
(1W+1S) 3 3B (1W+1S) (1W+1S) (1W+1S)
A
4A 6A 7A
CRUSHER
HOUSE JNT-3 JNT-2
4B 6B 7B
5A 5B
SLIDE NO - 63
SLIDE NO - 64
INTERLOCKING BETWEEN EMRG DG & UNIT PMCC
SLIDE NO - 65
FWSW MCC & RWIPH MCC
SLIDE NO - 66
WATER MONITOR
BUTTERFLY
FDPS SCHEME AT CHP
HYDRANT
VALVE
COAL STOCKPILE-4
250 NB
COAL STOCKPILE-3
250 NB
COAL STOCKPILE-2
150 NB
COAL STOCKPILE-1
150 NB