SAP S4HANA SD_Rebate-Processing
SAP S4HANA SD_Rebate-Processing
"
Rebate Processing "
***********************************
Due to size constraint not able provide complete information here.
RebateProcessing
Rebates: Rebate agreement is a special agreement granted to the customer on a specific volume of
sales over a specific period of time.
Configuration Path:
Enter your Copied Condition Type group which you created and Maintain “Blank” for Category of the
condition type group
Step 2.2: Assign Condition Types /tables to Condition Type groups
Assign Condition Type “Bo02” and Condition Table “1”to your Condition Type Group”Z002”
Rebate condition types (BO01, BO02, BO03, BO04, BO05, BO06)are available in Standard SAP
Make sure that Rebate condition types must available in (copied) pricing procedure
With Requirement-24 (only in Billing Document)
Accruals – ERU
(If you are good at Account determination Procedure configuration no need to fallow this)
T-Code: OVB0
Enter billing Document Type and put check mark for Relevant for Rebates
Go back
T-code: OVX5
Go to sales are data tab then choose Billing tab put check mark for “Rebates”
VBo1-Create
Vbo2-Change
Vbo3-Display
Maintain (Accruals amount) condition record for material rebate how much rebate we want to give it to
the customer
T-code: VA01
Save it
T-code: VL01n
Check ITEM conditions BO02 will display in conditions tab because we maintained requirement ‘24’ in
our pricing procedure
save it
Ex: 34
Will get details of payer customer master total rebate accruals amount
We can settle the rebate amount by manual or automatic
It will create automatically Rebate Request for Manual Accruals for entire eligible pending amount.
Background automatically created we can check these details by using T-code: VA03
Save it