Land dev. and Amenities form
Land dev. and Amenities form
Sewer line
Doors and
Structural
Electrical
windows
Re-inspection 1 Re-inspection 2 Re-inspection 3
Roofing
Others
√- Passed;
x- Failed;
Remarks
na- not Insp. Insp. Insp.
Status Status Status
applicable Result Result Result
Target date of Completion: Contractor representative: Date Re- Date Re- Date Re-Inspected
Rectification
Inspected Inspected Reinspected by:
required?
Reinspected by: Reinspected by:
Yes No
Name and signature
Punch Listed by: Approved by: Accepted by:
name, signature and date name, signature and date name, signature and date