0% found this document useful (0 votes)
24 views

Gate Pass-Delivery Form (2)

The document is a Materials/Equipment Gate Pass Form for the delivery of items, specifically a Dirty Ice Cream Cart and a Taho Cart. It includes sections for the bearer, owner/tenant/contractor, security inspection, and approval by property management. The form also states that APMC is not liable for any damage or loss during the transfer of items.

Uploaded by

Anne David
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

Gate Pass-Delivery Form (2)

The document is a Materials/Equipment Gate Pass Form for the delivery of items, specifically a Dirty Ice Cream Cart and a Taho Cart. It includes sections for the bearer, owner/tenant/contractor, security inspection, and approval by property management. The form also states that APMC is not liable for any damage or loss during the transfer of items.

Uploaded by

Anne David
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FMD-F-11-02.13.1.

Control No.:_______________

MATERIALS/EQUIPMENT GATE PASS FORM


(DELIVERY)

SmartBite
Bearer:_________________________________ UPA IBM BLDG. J
Building:_______________
IBM - ISD
Owner/Tenant/Contractor:_____________________ June 5, 2024
Date:__________________

Dirty Ice Cream Cart (Kartilya) w/ Mamang Sorbetero


Reason for transfer:______________________________________________________________________
Taho Cart w/ Mamang mang tataho
______________________________________________________________________________________

To be filled out by security


QUANTITY DESCRIPTION ACTUAL COUNT REMARKS

Prepared by: Cleared/Inspected by:

_________________________________ _____________________
Owner/Tenant/Contractor Representative Security Guard

Verified by: Date & Time Released:

____________________ _____________________
Security Officer

Approved by: Location:

___________________________________ _____________________
Property Manager/Building Engineer
Rev.02
APMC is not liable for any damage and loss of properties caused by the transferring in or out of the items.
Copy 1 – Tenant/Owner/ Contractor representative; Copy 2 – Security; Copy 3 – Property Manager

You might also like