Gate Pass-Delivery Form (2)
Gate Pass-Delivery Form (2)
Control No.:_______________
SmartBite
Bearer:_________________________________ UPA IBM BLDG. J
Building:_______________
IBM - ISD
Owner/Tenant/Contractor:_____________________ June 5, 2024
Date:__________________
_________________________________ _____________________
Owner/Tenant/Contractor Representative Security Guard
____________________ _____________________
Security Officer
___________________________________ _____________________
Property Manager/Building Engineer
Rev.02
APMC is not liable for any damage and loss of properties caused by the transferring in or out of the items.
Copy 1 – Tenant/Owner/ Contractor representative; Copy 2 – Security; Copy 3 – Property Manager