The TPC Offshore Wind Power Generation Phase II Project's Jacket Performance Report details weld testing and rejection rates for the period from March 23 to March 29, 2024. A total of 2,400 welds were tested, with a cumulative rejection percentage of 0.63%. The report indicates a significant focus on quality control with detailed metrics on weld defects and repair rates.

Uploaded by

Vu Hoang Anh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views12 pages

Weld Repair Rate (23-Mar-2024 To 29-Mar-2024)

The TPC Offshore Wind Power Generation Phase II Project's Jacket Performance Report details weld testing and rejection rates for the period from March 23 to March 29, 2024. A total of 2,400 welds were tested, with a cumulative rejection percentage of 0.63%. The report indicates a significant focus on quality control with detailed metrics on weld defects and repair rates.

Uploaded by

Vu Hoang Anh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

JACKET PERFORMANCE REPORT

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd
Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)
This Period : 23-Mar-24 to 29-Mar-24

TOTAL NUMBER OF WELDS TOTAL LENGTH OF WELDS/DEFECT (mm)

Last period This week Cumulative Last period This week Cumulative
RT/UT 1,116 32 1,148 2,761,123 91,944 2,853,067
WELDS TESTED
MT/PT 1,190 62 1,252 2,813,723 117,142 2,930,865

RT/UT 14 1 15 1,000 150 1,150


WELDS REJECTED
MT/PT - - - - - -

REJECTION RT/UT 1.25% 3.13% 1.31% 0.04% 0.16% 0.04%


PERCENTAGE
(%) MT/PT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TESTED 2,306 94 2,400 5,574,847 209,086 5,783,933

REJECTED 14 1 15 1,000 150 1,150

REJECTION 0.61% 1.06% 0.63% 0.02% 0.07% 0.02%


PERCENTAGE

Per Joint Per Length (mm)


Type of
Last period This week Cumulative Percentage Last period This week Cumulative Percentage
defect
CR - 0% - 0%

P - 0% - 0%

LF - 0% - 0%

LF-SI - 0% - 0%

LP - 0% - 0%

SI - 0% - 0%

SUR - 0% - 0%

SP - 0% - 0%

PL 14 - 14 100% 1,000 - 1,000 100%

CL - 0% - 0%

Total 14 - 14 100% 1,000 - 1,000 100%

PREPARED BY: QC MANAGER EMPLOYER

Name : Nguyen Thi Thuy Duong Name : Name :

Sign : Sign : Sign :

Date : 5-Feb Date : Date :


TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

WELD REPAIR RATE

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd

Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)

This Period : 30-Mar-24 to 05-Apr-24

RT/UT length Defect length RT/UT


Item % Repair RT/UT Remark

PREVIOUS

Jacket - Structure 2,761,123 1,000 0.04%

Topside - Structure

Topside - Piping

THIS PERIOD

Jacket - Structure 91,944 150 0.16%

Topside - Structure

Topside - Piping

TOTAL

Jacket - Structure 2,853,067 1,150 0.04%

Topside - Structure

Topside - Piping

Note : % Repair RT&UT = Defect length RT&UT / RT&UT Length

Prepared by : Reviewed by :
Name : Nguyen Thi Thuy Duong Name :

Sign : Sign :
Date : 5-Feb Date : 5-Feb
TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

JACKET PERFORMANCE REPORT

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd
Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)
This Period : 23-Mar-24 to 29-Mar-24

TOTAL NUMBER OF WELDS TOTAL LENGTH OF WELDS/DEFECT (mm)

Last period This week Cumulative Last period This week Cumulative
RT/UT 1,057 59 1,116 2,702,036 59,087 2,761,123
WELDS TESTED
MT/PT 1,125 65 1,190 2,737,748 75,975 2,813,723

RT/UT 14 - 14 1,000 - 1,000


WELDS REJECTED
MT/PT - - - - - -

REJECTION RT/UT 1.28% 0.00% 1.25% 0.04% 0.00% 0.04%


PERCENTAGE
(%) MT/PT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TESTED 2,244 62 2,306 5,439,785 135,062 5,574,847

REJECTED 14 - 14 1,000 - 1,000

REJECTION 0.62% 0.00% 0.61% 0.02% 0.00% 0.02%


PERCENTAGE

Per Joint Per Length (mm)


Type of
Last period This week Cumulative Percentage Last period This week Cumulative Percentage
defect
CR - 0% - 0%

P - 0% - 0%

LF - 0% - 0%

LF-SI - 0% - 0%

LP - 0% - 0%

SI - 0% - 0%

SUR - 0% - 0%

SP - 0% - 0%

PL 14 - 14 100% 1,000 - 1,000 100%

CL - 0% - 0%

Total 14 - 14 100% 1,000 - 1,000 100%

PREPARED BY: QC MANAGER EMPLOYER

Name : Nguyen Thi Thuy Duong Name : Name :

Sign : Sign : Sign :

Date : 5-Feb Date : Date :


TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

WELD REPAIR RATE

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd

Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)

This Period : 23-Mar-24 to 29-Mar-24

RT/UT length Defect length RT/UT


Item % Repair RT/UT Remark

PREVIOUS

Jacket - Structure 2,699,423 1,000 0.04%

Topside - Structure

Topside - Piping

THIS PERIOD

Jacket - Structure 5,812 - 0.00%

Topside - Structure

Topside - Piping

TOTAL

Jacket - Structure 2,705,235 1,000 0.04%

Topside - Structure

Topside - Piping

Note : % Repair RT&UT = Defect length RT&UT / RT&UT Length

Prepared by : Reviewed by :
Name : Nguyen Thi Thuy Duong Name :

Sign : Sign :
Date : 5-Feb Date : 5-Feb
TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

JACKET PERFORMANCE REPORT

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd
Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)
This Period : 16-Mar-24 to 22-Mar-24

TOTAL NUMBER OF WELDS TOTAL LENGTH OF WELDS/DEFECT (mm)

Last period This week Cumulative Last period This week Cumulative
RT/UT 1,033 24 1,057 2,529,278 54,326 2,583,604
WELDS TESTED
MT/PT 1,093 32 1,125 2,577,452 61,910 2,639,362

RT/UT 12 2 14 840 160 1,000


WELDS REJECTED
MT/PT - - - - - -

REJECTION RT/UT 1.16% 8.33% 1.32% 0.03% 0.29% 0.04%


PERCENTAGE
(%) MT/PT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TESTED 2,126 56 2,182 5,106,731 116,236 5,222,967

REJECTED 12 2 14 840 160 1,000

REJECTION 0.56% 3.57% 0.64% 0.02% 0.14% 0.02%


PERCENTAGE

Per Joint Per Length (mm)


Type of
Last period This week Cumulative Percentage Last period This week Cumulative Percentage
defect
CR - 0% - 0%

P - 0% - 0%

LF - 0% - 0%

LF-SI - 0% - 0%

LP - 0% - 0%

SI - 0% - 0%

SUR - 0% - 0%

SP - 0% - 0%

PL 12 2 14 100% 840 160 1,000 100%

CL - 0% - 0%

Total 12 2 14 100% 840 160 1,000 100%

PREPARED BY: QC MANAGER EMPLOYER

Name : Nguyen Thi Thuy Duong Name : Name :

Sign : Sign : Sign :

Date : 5-Feb Date : Date :


TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

WELD REPAIR RATE

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd

Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)

This Period : 16-Mar-24 to 22-Mar-24

Item RT/UT length Defect length RT/UT % Repair RT/UT Remark

PREVIOUS

Jacket - Structure 2,529,278 840 0.03%

Topside - Structure

Topside - Piping

THIS PERIOD

Jacket - Structure 54,326 160 0.29%

Topside - Structure

Topside - Piping

TOTAL

Jacket - Structure 2,583,604 1,000 0.04%

Topside - Structure

Topside - Piping

Note : % Repair RT&UT = Defect length RT&UT / RT&UT Length

Prepared by : Reviewed by :
Name : Nguyen Thi Thuy Duong Name :

Sign : Sign :
Date : 5-Feb Date : 5-Feb
TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

JACKET PERFORMANCE REPORT

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd
Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)
This Period : 09-Mar-24 to 15-Mar-24

TOTAL NUMBER OF WELDS TOTAL LENGTH OF WELDS/DEFECT (mm)

Last period This week Cumulative Last period This week Cumulative
RT/UT 987 45 1,032 2,375,007 151,658 2,526,665
WELDS TESTED
MT/PT 1,019 74 1,093 2,391,551 185,901 2,577,452

RT/UT 11 1 12 780 60 840


WELDS REJECTED
MT/PT - - - - - -

REJECTION RT/UT 1.11% 2.22% 1.16% 0.03% 0.04% 0.03%


PERCENTAGE
(%) MT/PT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%

TESTED 2,006 119 2,125 4,766,559 337,559 5,104,118

REJECTED 11 1 12 780 60 840

REJECTION 0.55% 0.84% 0.56% 0.02% 0.02% 0.02%


PERCENTAGE

Per Joint Per Length (mm)


Type of
Last period This week Cumulative Percentage Last period This week Cumulative Percentage
defect
CR - 0% - 0%

P - 0% - 0%

LF - 0% - 0%

LF-SI - 0% - 0%

LP - 0% - 0%

SI - 0% - 0%

SUR - 0% - 0%

SP - 0% - 0%

PL 11 1 12 100% 780 60 840 100%

CL - 0% - 0%

Total 11 1 12 100% 780 60 840 100%

PREPARED BY: QC MANAGER EMPLOYER

Name : Nguyen Thi Thuy Duong Name : Name :

Sign : Sign : Sign :

Date : 5-Feb Date : Date :


TPC Offshore Wind Power Generation Phase II Project - Offshore SubStation (OSS)

WELD REPAIR RATE

Owner/Client Name: Taiwan Power Company


Employer: Foxwell Energy Corporation Ltd.
Contractor (SFE): Shinfox Far East Company Pte Ltd

Subcontractor: Petrovietnam Marine Shipyard J/S Company (PVMS)

This Period : 09-Mar-24 to 15-Mar-24

Item RT/UT length Defect length RT/UT % Repair RT/UT Remark

PREVIOUS

Jacket - Structure 2,375,007 780 0.03%

Topside - Structure

Topside - Piping

THIS PERIOD

Jacket - Structure 151,658 60 0.04%

Topside - Structure

Topside - Piping

TOTAL

Jacket - Structure 2,526,665 840 0.03%

Topside - Structure

Topside - Piping

Note : % Repair RT&UT = Defect length RT&UT / RT&UT Length

Prepared by : Reviewed by :
Name : Nguyen Thi Thuy Duong Name :

Sign : Sign :
Date : 5-Feb Date : 5-Feb

You might also like