0% found this document useful (0 votes)
6 views

13..8kv_switch_gear_high_voltage_tests - Copy - Copy - Copy

The document outlines the commissioning standard test formats for high voltage switchgear, detailing the procedures for high voltage tests, insulation resistance tests, and voltage transformer ratio verification tests. It specifies test conditions, voltage levels, and requirements for successful testing, including the need for grounding and recording of results. The document serves as a guideline for ensuring the safety and reliability of high voltage electrical equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

13..8kv_switch_gear_high_voltage_tests - Copy - Copy - Copy

The document outlines the commissioning standard test formats for high voltage switchgear, detailing the procedures for high voltage tests, insulation resistance tests, and voltage transformer ratio verification tests. It specifies test conditions, voltage levels, and requirements for successful testing, including the need for grounding and recording of results. The document serves as a guideline for ensuring the safety and reliability of high voltage electrical equipment.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

POWER SYSTEM MPROTECTION

Department
ETHIOPIAN ELECTRIC POWER Commissioning Standard Test
Formats
Description: SWITCH GEAR HIGH VOLTAGE
Record No. :
TESTS
Testing Section : Drawing ref.: Sheet : 1 of 3
Contractor : Contract no.: Substation No

SWITCH GEAR HIGH VOLTAGE TESTS:


Ref as per TCS – P -105, Rev – 01, Item 3.12.3.
32 –TMMS – 01
IEC – 62271 – 100

Guidelines for High Voltage Tests:


 Test voltage should be applied on each phase to ground with other phases in
earthed position the test should be repeated on other phases similarly.
 The test period should not be more than 1 min at full test level and the test voltage
frequency should be kept at 60 Hz.
 Charging current for each test is noted and recorded.
 In open position the cable contacts are to be grounded . Test is considered
successful if no break down occurs during test period.
 Test shall be performed with the CB in both closed and open conditions .
 After the high voltage test on main circuit is finished Rack the Vt in service position
and apply on primary side a test voltage equal to 1.5U n (Un = phase to neutral rated
voltage ) on each phase consecutively and measure the secondary output voltage
same time during the test.
 Make sure the VT secondary side MCB’s are switched off and any resistor in open
delta winding had been removed.
 CT’s secondary terminals should be short circuited and earthed.
 Before and after High voltage test insulation resistance to be checked

INSULATION RESISTANCE TEST:

Applied Voltage = 5 kV Time Duration = 1 min

Insulation resistance values


Phase Remarks
Before HV test After HV test
R – (Y+B+E)
Y –(R+B+E)
B –(R+Y+E)

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


POWER SYSTEM MPROTECTION
Department
ETHIOPIAN ELECTRIC POWER Commissioning Standard Test
Formats
Description: SWITCH GEAR HIGH VOLTAGE
Record No. :
TESTS
Testing Section : Drawing ref.: Sheet : 2 of 3
Contractor : Contract no.: Substation No

HIGH VOLTAGE TEST:


For Bus Bar & CB’s:

All CBs In Closed Condition & VT In “Out“ Position [ ]

Applied voltage = 30 kV Time duration = 1 min

Neon voltage Leakage Current in mA


Injected Connected
indicators
phase to Earth 15s 30s 45s 60s
OK/Not OK
R y+b
Y b+r
B r+y

All CBs In Opened Condition & VT In “Out“ Position [ ]

Applied voltage = 30 kV Time duration = 1 min

Injected Connected Neon voltage Leakage current in mA


phase to earth indicators ok/not ok 15s 30s 45s 60s
R y+b
Y b+r
B r+y

For voltage transformers:

V.T in on Position and Sec. MCBs Switched Off .

Applied voltage = 12 kV Time duration = 1 min

Injected Connected to Leakage current in mA


phase earth 15S 30S 45S 60S
R y+b
Y b+r
B r+y

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date:


POWER SYSTEM MPROTECTION
Department
ETHIOPIAN ELECTRIC POWER Commissioning Standard Test
Formats
Description: SWITCH GEAR HIGH VOLTAGE
Record No. :
TESTS
Testing Section : Drawing ref.: Sheet : 3 of 3
Contractor : Contract no.: Substation No

VOLTAGE TRANSFORMERS RATIO VERIFICATION TEST:


V.T in on Position and Sec. MCBs switched on .

Injected Secondary Voltage measured (V)


Injected
primary
phase Windg1 Ratio: Windg2 Ratio:
voltage (kV)
R 8
Y 8
B 8

Tested by: ENG. Witnessed by: ENG.

Signature & Date: Signature & Date: