1.I-sp-4829-M-dsh-00001 - r0 主燃油输送泵数据表datasheet for Main Fuel Transfer Pumps

This document is a datasheet for the Main Fuel Transfer Pump associated with the Simandou Project - Port EPC 2 by China Harbour Engineering Company. It includes specifications such as pump size, operating conditions, performance requirements, and construction details. The document is intended for internal use and outlines technical standards and requirements for the pump's design and operation.

Uploaded by

lionqq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views9 pages

1.I-sp-4829-M-dsh-00001 - r0 主燃油输送泵数据表datasheet for Main Fuel Transfer Pumps

This document is a datasheet for the Main Fuel Transfer Pump associated with the Simandou Project - Port EPC 2 by China Harbour Engineering Company. It includes specifications such as pump size, operating conditions, performance requirements, and construction details. The document is intended for internal use and outlines technical standards and requirements for the pump's design and operation.

Uploaded by

lionqq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

DOCUMENT COVER SHEET

China Harbour Engineering Company limited


Fixed on the 11th floor, Residence Dolphine II, Commune de
Matam, Conakry, Republic of Guinea

Simandou Project - Port EPC 2:


DATASHEET FOR MAIN FUEL TRANSFER PUMP
4829-PMP-0001/0002
Project Code: Project Title:
I0016 Simandou

Contract Number: Contract Title:


I0016-4000-CC-CON-166 PORT EPC 2 – UTILITIES AND BUILDINGS

Rio Tinto Document Number I-SP-4829-M-DSH-00001


Contractor Document Number I0016-4829-CHEC-DSH-0039
Vendor Document Number N/A
Volume

Rev Issue Date Issue Reason Prepared By: Reviewed By: Approved By:
0 13 -Dec-24
th Issued for Use Yu Zhouhang Tang Yitong
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 2 of 9

Prepared by Yu Zhouhang

Checked by Tang Yitong

Reviewed by Wang Bin

Date

REV DESC PRED CHKD REVD DATE

It's not allowed to disclose to any third party without written consent of CEI JL 02ZC11 000-10
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
Revi si on LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 3 of 9
1 Note APPLICABLE TO: PURCHASE APPLICABLE NTL/INTNTL STANDARD: API 610 12th / ISO 13709
2 FOR UNIT
3 SITE SERVICE MAIN FUEL TRANSFER PUMP
4 NO. REQ 2 PUMP SIZE TYPE Centrifugal No. STAGES
5
6 MANUFACTURER MODEL SERIAL NO.

6 LIQUID CHARACTERISTICS

7 Units Maximum Minimum SERVICE : INTERMITTENT


8 LIQUID TYPE OR NAME : Diesel • IF INTERMITTENT NO. OF STARTS :

9 VAPOR PRESSURE : bar abs PUMPS OPERATE IN: 1 operating+ 1 standby


10 SPECIFIC GRAVITY : 0.890 CORROSION DUE TO : (6.12.1.9)
11 SPECIFIC HEAT : EROSION DUE TO : (6.12.1.9)
12 VISCOSITY : cP 5.340 1.78 H2S CONCENTRATION (ppm) : (6.12.1.12) 2

13 OPERATING CONDITIONS (6.1.2) CHLORIDE CONCENTRATION (ppm) :


14 Units Maximum Rated Normal Minimum PARTICULATE SIZE (DIA IN MICRONS)
15 NPSHa Datum: C.L. Impeller PARTICULATE CONCENTRATION (PPM)
16 PUMPING TEMPERATURE : °C ATM
3
17 FLOW : m /hr 200
18 DISCHARGE PRESSURE : (6.3.2) MpaG
19 SUCTION PRESSURE : MpaG 0.15 0.01
20 DIFFERENTIAL PRESSURE : Mpa
21 DIFFERENTIAL HEAD : m 40
22 NPSH A : m 4.00
23 HYDRAULIC POWER (est) : kW

24 SITE AND UTILITY DATA [Note 7]

25 LOCATION: COOLING WATER : [Note 2]


26 OUTDOOR UNHEATED INLET RETURN DESIGN

27 MOUNTED AT : GRADE l TROPICALISATION REQD TEMP °C MAX


28 ELECTRIC AREA CLASSIFICATION: 6.1.22 2 PRESS. bar g MIN
29 GROUP II B TEMP CLASS SOURCE No cooling water
30 SITE DATA : [Note 2] COOLING WATER CHLORIDE CONCENTRATION: ppm
31 ELEVATION (MSL) : BAROMETER : mmHgINSTRUMENT AIR : MAX bar g MIN bar g
32 RANGE OF AMBIENT TEMPS:MIN / MAX °C STEAM
33 RELATIVE HUMIDITY: MIN / MAX % DRIVERS HEATING
34 UNUSUAL CONDITIONS: TEMP °C Max

35 Min
36 UTILITY CONDITIONS : [Note 2] PRESS. bar g Max
37 ELECTRICITY : DRIVERS HEATING CONTROL SHUTDOWN Min
38 VOLTAGE 380 220
39 PHASE 3 1 DRIVER (7.1.5)

40 HERTZ 50 50 Driver
GEAR Type Electric Motor
N/A
41 PERFORMANCE * VARIABLE SPEED REQUIRED Yes
42 PROPOSAL CURVE NO. RPM SOURCE OF VARIABLE SPEED 0~100%
43 As Tested Curve No. OTHER
44 IMPELLER DIA.: RATED MAX. MIN. mm MANUFACTURER
45 RATED POWER kW EFFICIENCY (%) NAMEPLATE POWER (Refer to LV Motor Datasheet) kW
3
46 RATED CURVE BEP FLOW (at rated impeller dia) [Note 2] m /h Nominal RPM
3 3
47 MIN FLOW : THERMAL m /h STABLE m /h RATED LOAD RPM
3
48 PREFERRED OPERATING REGION (6.1.11) to m /h FRAME OR MODEL
3
49 ALLOWABLE OPERATING REGION to m /h ORIENTATION HORIZONTAL
50 MAX HEAD @ RATED IMPELLER m LUBE
51 MAX POWER @ RATED IMPELLER (6.8.9) kW BEARING TYPE:
52 NPSH3 AT RATED FLOW [Note 1] m RADIAL /
53 CL PUMP TO U/S BASEPLATE m THRUST /
54 NPSH MARGIN AT RATED FLOW : m STARTING METHOD Closed-Valve (Unloaded) Start
3
55 SPECIFIC SPEED (6.1.9) m /s, rpm, m SEE DRIVER DATA SHEET
56 SUCTION SPECIFIC SPEED LIMIT
3
m /s, rpm, m NOTES
3
57 SUCTION SPECIFIC SPEED m /s, rpm, m 1] The NPSH margin shall be at least 0.5m or 20% across the complete

58 MAX. ALLOW. SOUND PRESS. LEVEL REQD (6.1.14) 85 (dBA) operating range (from min continuous stable flow to max expected operating flow)

59 EST MAX SOUND PRESS. LEVEL (dBA)

60 MAX. SOUND POWER LEVEL REQ'D (6.1.14) 2] Refer to the Site and Utility Conditions data of this project.

61 EST MAX SOUND POWER LEVEL


CNPC EASTCHINA
Revi si on DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 4 of 9
1 Note CONSTRUCTION *

2 API PUMP TYPE: OH2 [API 610 definitions] CASING MOUNTING: CENTERLINE
3 CASING TYPE: (6.3.10)
4 NOZZLE CONNECTIONS: (6.5.5) OH3 BACKPULLOUT LIFTING DEVICE REQD. (9.1.2.6)
5 Size Facing Rating Position CASE PRESSURE RATING:
6 SUCTION RF 300 END MAWP : (6.3.6) bar g @ °C
7 DISCHARGE RF 300 TOP HYDROTEST : 1.5 X MAWP bar g @ °C
8 PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)
9 No. Size Type Facing Rating Posn. HYDROTEST BB PUMP AS ASSEMBLY

10 BALANCE/LEAK OFF SUCT'N PRESS. REGIONS DESIGNED FOR MAWP YES


11 DRAIN ROTATION: (VIEWED FROM COUPLING END)
12 VENT • IMPELLERS INDIVIDUALLY SECURED :

13 PRESSURE GAGE • BOLT OH 3/4/5 PUMP TO PAD / FOUNDATION :

14 TEMP GAGE • PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS

15 WARM-UP LINE ROTOR:


16 SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3)
17 Drain Valve Supplied By SUPPLIER First Critical Speed Wet (Multi stage pumps only)
18 DRAINS MANIFOLDED COMPONENT BALANCE TO ISO 1940 G1.0
19 VENT Valve Supplied By SUPPLIER SHRINK FIT -LIMITED MOVEMENT IMPELLERS (9.2.2.3)
20 VENTS MANIFOLDED
21 THREADED CONS FOR PIPELINE SERVICE & < 50°C (6.4.3.2) COUPLING:(7.2.3) (7.2.13.f) [Note 1]
22 SPECIAL FITTINGS FOR TRANSITIONING (6.4.3.3) MANUFACTURER
23 CYLINDRICAL THREADS REQUIRED (6.4.3.8) MODEL
24 GUSSET SUPPORT REQUIRED RATING (POWER/100 RPM)
25 MACHINED AND STUDDED CONNECTIONS (6.4.3.12) SPACER LENGTH mm
26 VS 6 DRAIN SERVICE FACTOR [Note 2]
27 DRAIN TO SKID EDGE YES RIGID
28 COUPLING WITH HYDRAULIC FIT (7.2.10)
29 MATERIAL (6.12.1.1) * COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3) YES
30 APPENDIX H CLASS S-6 COUPLING WITH PROPRIETARY CLAMPING DEVICE (7.2.11)
31 MIN DESIGN METAL TEMP (6.12.4.1) °C #RE
32 REDUCED-HARDNESS MATERIALS REQ'D (6.12.1.12.1) COUPLING IN COMPLIANCE WITH (7.2.4)
33 Applicable Hardness Standard (6.12.1.12.3) COUPLING GUARD STANDARD PER (7.2.13.a) YES
34 BARREL : Window on Coupling Guard
35 CASE :
36 DIFFUSERS BASEPLATE *

37 IMPELLER : API BASEPLATE NUMBER :


38 IMPELLER WEAR RING : BASEPLATE CONSTRUCTION (7.3.14) PARTIAL TOP DECKING
39 CASE WEAR RING : BASEPLATE DRAINAGE (7.3.1) Entire Baseplate Drain Pan
40 SHAFT: MOUNTING :
41 Bowl (if VS-type) NON-GROUT CONSTRUCTION : (7.3.13)
42 Inspection Class VERTICAL LEVELING SCREWS :

43 BEARINGS AND LUBRICATION (6.10.1.1) * LONGITUDINAL DRIVER POSITIONING SCREWS :


44 BEARING (TYPE / NUMBER): (6.11.4) SUPPLIED WITH : l GROUT AND VENT HOLES YES
45 RADIAL BALL / l DRAIN CONNECTION YES
46 THRUST BALL / MOUNTING PADS SIZED FOR BASEPLATE LEVELING (7.3.5) YES
47 REVIEW AND APPROVE THRUST BEARING SIZE : (9.2.5.2.4) MOUNTING PADS TO BE MACHINED (7.3.6)
48 PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET
49 LUBRICATION : (6.10.2.2) (6.11.3) (9.6.1) Oil OTHER
50 PRESSURE LUBE SYSTEM TO ISO 10438- (9.2.6.5)
51 ISO 10438 DATA SHEETS ATTACHED
52 Pressurized Lube Oil System mtd on pump baseplate NOTES:
53 Location of Pressurized Lube Oil System mounted on baseplate : 1] The coupling shall be metallic disk flexible type and with spacer;
54 guard shall be manufactured with non-sparking material
55 INTERCONNECTING PIPING PROVIDED BY 2] Coupling service factor shall be at least 1.5
56
57 OIL VISC. ISO GRADE VG
58 CONSTANT LEVEL OILER : REQUIRED
CNPC EASTCHINA
Revi si on DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 5 of 9
1 Note INSTRUMENTATION SEAL SUPPORT SYSTEM MOUNTING

2 SEE ATTACHED API-670 DATA SHEET SEAL SUPPORT SYSTEM MOUNTED ON PUMP BASEPLATE
3 ACCELEROMETER (7.4.2.1) (7.5.1.4) N/A
4 Number of Accelerometers IDENTIFY LOCATION ON BASEPLATE
5 Mounting Location of Accelerometers
6 INTERCONNECTING PIPING BY
7 PROVISION FOR MTG ONLY (6.10.2.10)
8 Number of Accelerometers MECHANICAL SEAL (6.8.1) [Note 1]

9 Mounting Location of Accelerometers SEE ATTACHED ISO 21049/API 682 DATA SHEET
10 ADDITIONAL CENTRAL FLUSH PORT (6.8.9)
11 FLAT SURFACE REQUIRED (6.10.2.11) HEATING JACKET REQ'D. (6.8.11)
12 Number of Accelerometers
13 Mounting Location of Accelerometers HEATING AND COOLING (6.1.17)

14 COOLING REQ'D
15 VIBRATION PROBES (7.4.2.2) COOLING WATER PIPING PLAN
16 PROVISIONS FOR VIB. PROBES COOLING WATER PIPING
17 NUMBER PER RADIAL BEARING FITTINGS
18 NUMBER PER AXIAL BEARING COOLING WATER PIPING MATERIALS
COOLING WATER REQUIREMENTS:
3
19 MONITORS AND CABLES SUPPLIED BY (7.4.2.4) BEARING HOUSING m /h
3
20 HEAT EXCHANGER m /h
3
21 TEMPERATURE (7.4.2.3) TOTAL COOLING WATER m /h
22 PROVISIONS FOR TEMP PROBES HEATING MEDIUM
23 RADIAL BEARING TEMP. OTHER
24 NUMBER PER RADIAL BEARING HEATING PIPING
25 THRUST BEARING TEMP.
26 NUMBER PER THRUST BEARING ACTIVE SIDE PIPING & APPURTENANCES

27 NUMBER PER THRUST BEARING INACTIVE SIDE MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)
28 TEMP. GAUGES (WITH THERMOWELLS) (9.1.3.6) VENT
29 PRESSURE GAUGE TYPE DRAIN
30 Notes: COOLING WATER
31 TAG ALL ORIFICES (7.5.2.4)
32 SOCKET WELD CONN ON SEAL GLAND (7.5.2.8)
33
34 Notes:
35 1] Mechanical Seal: API 682, Plan 11+53B
36 Seal Flush Pipe Type : Tubing 316 SS
37 Seal Flush Piping Joints : Compression fittings
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP

Revi si on
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 6 of 9
1 Note SURFACE PREPARATION AND PAINT TEST

2 MANUFACTURER'S STANDARD NO SHOP INSPECTION (8.1.1) Yes


3 OTHER (SEE BELOW) YES PERFORMANCE CURVE
4 SPECIFICATION NO. I-SP-4829-M-SPE-00005 & DATA APPROVAL PRIOR TO SHIPMENT. YES
5 TEST WITH SUBSTITUTE SEAL (8.3.3.2.b)
6 PUMP: MATERIAL CERTIFICATION REQUIRED CASING YES
7 PUMP SURFACE PREPARATION (6.12.1.8) IMPELLER YES
8 PRIMER SHAFT YES
9 FINISH COAT OTHER YES
10 CASTING REPAIR WELD PROCEDURE APPR REQD
11 BASEPLATE: (6.12.2.5) (6.12.3.1)
12 BASEPLATE SURFACE PREPARATION INSPECTION REQUIRED FOR CONNECTION WELDS (6.12.3.4.d)
13 PRIMER: (6.12.3.4.e) MAG PARTICLE
14 FINISH COAT RADIOGRAPHY
15 DETAILS OF LIFTING DEVICES LIQUID PENETRANT
16 ULTRASONIC
17 SHIPMENT: (8.4.1) EXPORT INSPECTION REQUIRED FOR CASTINGS
18 EXPORT BOXING REQUIRED YES MAG PARTICLE
19 OUTDOOR STORAGE MORE THAN 6 MONTHS YES RADIOGRAPHY
20 LIQUID PENETRANT
21 SPARE ROTOR ASSEMBLY PACKAGED FOR: ULTRASONIC
22 ROTOR STORAGE ORIENTATION (9.2.8.2) HARDNESS TEST REQUIRED (8.2.2.7)
23 SHIPPING & STORAGE CONTAINER FOR VERT STORAGE (9.2.8.3) ADDNL SUBSURFACE EXAMINATION (6.12.1.5) (8.2.1.3)
24 FOR
25 N2 PURGE (9.2.8.4) METHOD
26 SPARE PARTS [Note 9] PMI TESTING REQUIRED (8.2.2.8) YES
27 START-UP YES COMPONENTS TO BE TESTED
28 NORMAL MAINTENANCE IMPELLER AND SHAFT
29 WEIGHTS, kg RESIDUAL UNBALANCE TEST (J.4.1.2)

30 ITEM No PUMP DRIVER GEAR BASE TOTAL NOTIFICATION OF SUCCESSFUL SHOP


31 PERFORMANCE TEST (8.1.1.c) (8.3.3.5) YES
32 BASEPLATE TEST (7.3.21)

33 HYDROSTATIC WIT
34 HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2)
35 OTHER PURCHASER REQUIREMENTS PERFORMANCE TEST WIT
36 COORDINATION MEETING REQUIRED (10.1.3) TEST IN COMPLIANCE WITH (8.3.3.2) API 610
37 MAXIMUM DISCHARGE PRESSURE TO INCLUDE TEST DATA POINTS TO (8.3.3.3) YES
38 MAX RELATIVE DENSITY YES TEST TOLERANCES TO (8.3.3.4)
39 OPERATION TO TRIP SPEED NPSH (8.3.4.3.1) (8.3.4.3.4) WIT
40 MAX DIA. IMPELLERS AND/OR NO OF STAGES NPSH-1ST STG ONLY (8.3.4.3.2)
41 CONNECTION DESIGN APPROVAL (9.2.1.4) NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3)
42 TORSIONAL ANALYSIS / REPORT (6.9.2.10) TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)
43 PROGRESS REPORTS YES RETEST ON SEAL LEAKAGE (8.3.3.2.d)
44 OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5) RETEST REQUIRED AFTER FINAL HEAD ADJ (8.3.3.7.b)
45 ADDITIONNAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1) COMPLETE UNIT TEST (8.3.4.4.1) WIT
46 SOUND LEVEL TEST (8.3.4.5) WIT
47 LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3) CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)
48 MODAL ANALYSIS REQUIRED (9.3.9.2) LOCATION OF CLEANLINESS INSPECTION @ SUPPLIER'S
49 DYNAMIC BALANCE ROTOR (6.9.4.4) NOZZLE LOAD TEST
50 INSTALLATION LIST IN PROPOSAL (10.2.3.l) CHECK FOR CO-PLANAR MOUNTING PAD SURFACES
51 VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3) MECHANICAL RUN TEST UNTIL OIL TEMP STABLE
52 30 MIN. MECH RUN AFTER OIL TEMP STABLE (8.3.4.2.1)
53 TRANSIENT TORSIONAL RESPONSE (6.9.2.4) 4 HR. MECH RUN TEST (8.3.4.2.2) WIT
54 BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)
55 IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e) BRG HSG RESONANCE TEST (8.3.4.7)
56 CASING RETIREMENT THICKNESS DRAWING (10.3.2.3) STRUCTURAL RESONANCE TEST (9.3.9.2)
57 FLANGES RQD IN PLACE OF SKT WELD UNIONS (7.5.2.8) REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST
58 INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3) (9.2.7.5)
59 CONNECTION BOLTING (7.5.1.7) AUXILIARY EQUIPMENT TEST (8.3.4.6)
60 CADMIUM PLATED BOLTS PROHIBITED EQUIPMENT TO BE INCLUDED IN AUXILLIARY TESTS
61 VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.c)
62 VENDOR SUBMIT TEST PROCEDURES (8.3.1.1) YES LOCATION OF AUXILIARY EQUIPENT TEST
63 SUBMIT INSPECTION CHECK LIST (8.1.5) YES
64 IMPACT TEST (6.12.4.3) PER EN 13445

65 PER ASME SECTION VIII

66
67 REMOVE CASING AFTER TEST
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 7 of 9
1 Note VERTICAL TYPE (FIG 1.1)
2 REMARKS
3
4
5
6 VERTICAL PUMPS * VERTICAL PUMPS (CONT'D) *

7 PUMP THRUST: (+) UP (-) DOWN LINE SHAFT:


8 STATIC THRUST N N LINE SHAFT DIAMETER mm
9 AT MIN FLOW N N TUBE DIAMETER mm
10 AT RATED FLOW N N LINE SHAFT COUPLING:
11 AT MAX FLOW N N LINESHAFT CONNECTION

12 MAX THRUST N N
13 SOLEPLATE REQUIRED • SUCTION STRAINER TYPE

14 SOLEPLATE Length x Width m X m • LEVEL CONTROL

15 SOLEPLATE THICKNESS mm IMPELLER COLLETS ACCEPTABLE


16 MOUNTING FLANGE REQUIRED HARDENED SLEEVES UNDER BEARINGS (9.3.10.5)
17 COLUMN PIPE: RESONANCE TEST
18 DIAMETER mm STRUCTURAL ANALYSIS (9.3.5)
19 LENGTH m
20 NUMBER DRIVER ALIGNMENT SCREWS
21 SPACING m SUCTION CAN
22 GUIDE BUSHINGS: SUCTION CAN THICKNESS mm
23 NUMBER LENGTH m
24 LINE SHAFT BEARING SPACING mm DIAMETER mm
25 GUIDE BUSHING LUBE: SEPARTATE MOUNTING PLATE (9.3.8.3.1)
A
26 PROVIDE SEPARATE SOLEPLATE (9.3.8.3.3)
27 DRAIN PIPED TO SURFACE (9.3.13.5)
28 BOWL HEAD CALCULATION REQUIRED
N/

29 MATERIALS (additional) *
30 SUCTION CAN / BARREL: LINESHAFT SLEEVES :
31 DISCHARGE HEAD : • BEARING RETAINER :
32 BOWL SHAFT : SHAFT ENCLOSING TUBE :
33 LINESHAFT : DISCHARGE COLUMN :
34 LINESHAFT HARDFACING : PRESSURE RATING: MAWP HYDRO
35 BELLMOUTH : HEAD
36 BOWL BEARING : COLUMN PIPE
37 LINESHAFT BEARING : BOWL

38 SUMP ARRANGEMENT
39 SUMP DIMENSIONS :

40 MOUNTING PLATE ELEVATION 1 m


41 MINIMUM WATER LEVEL (LAL) 2 m 1 2
3 2 4
3
42 MINIMUM WATER LEVEL (LALL) 3 m
43 C.L. OF DISCHARGE 4 m
l3

44 SUMP DEPTH l1 m
45 PUMP LENGTH l 3+ l 2 m
46 GRADE TO DISCH. l3 m
l4

47 GRADE TO LOW LIQUID LVL l4 m


l5

GRADE TO 1ST STG IMPL'R. l5


l2

48 m
l1

49 SUBMERGENCE REQ'D l6 m
l6

50 SUMP DIAMETER Fd m
51 MIN. DISTANCE FROM BOTTOM m
52
53 Fd
54
55
56
57
CNPC EASTCHINA
Revi si on DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 8 of 9
1 Note PRESSURE VESSEL DESIGN CODE REFERENCES

2 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER


3 CASTING FACTORS USED IN DESIGN ( TABLE 3)
4 SOURCE OF MATERIAL PROPERTIES
5
6 WELDING AND REPAIRS

7 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
8 ALTERNATE WELDING CODES AND STANDARDS
9 WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD)
10 WELDER/OPERATOR QUALIFICATION
11 WELDING PROCEDURE QUALIFICATION
12 NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS
13 MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES
14 POSTWELD HEAT TREATMENT
15 POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS
16
17 MATERIAL INSPECTION

18 THESE REFERENCES MUST BE LISTED BY THE PURCHASER DEFAULT TO TABLE 14


ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 14) (8.2.2.5)
19 TYPE OF INSPECTION METHOD FOR FABRICATIONS FOR CASTINGS

20 RADIOGRAPHY
21 ULTRASONIC INSPECTION
22 MAGNETIC PARTICLE INSPECTION
23 LIQUID PENETRANT INSPECTION
24 VISUAL INSPECTION (all surfaces)
25
26 REMARKS :
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
CNPC EASTCHINA
Revi si on DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 9 of 9
1 Note GENERAL NOTES
2 1 Pumps are horizontal centrifugal pump type. Centrifugal pump shut-off head shall not exceed (120%) of specified differential head inclusive
3 of all tolerances.
4
5 2 Pumps shall be hydrostatically tested at 1.5 time MAWP for at least 1 hour. Tested component shall be free from any paint
6 or impregnation product.
7
8 3 Allowable nozzle forces and moments shall be provided in accordance with 3 × Table 5 of API 610
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58

You might also like