1.I-sp-4829-M-dsh-00001 - r0 主燃油输送泵数据表datasheet for Main Fuel Transfer Pumps
1.I-sp-4829-M-dsh-00001 - r0 主燃油输送泵数据表datasheet for Main Fuel Transfer Pumps
Rev Issue Date Issue Reason Prepared By: Reviewed By: Approved By:
0 13 -Dec-24
th Issued for Use Yu Zhouhang Tang Yitong
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 2 of 9
Prepared by Yu Zhouhang
Date
It's not allowed to disclose to any third party without written consent of CEI JL 02ZC11 000-10
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
Revi si on LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 3 of 9
1 Note APPLICABLE TO: PURCHASE APPLICABLE NTL/INTNTL STANDARD: API 610 12th / ISO 13709
2 FOR UNIT
3 SITE SERVICE MAIN FUEL TRANSFER PUMP
4 NO. REQ 2 PUMP SIZE TYPE Centrifugal No. STAGES
5
6 MANUFACTURER MODEL SERIAL NO.
6 LIQUID CHARACTERISTICS
35 Min
36 UTILITY CONDITIONS : [Note 2] PRESS. bar g Max
37 ELECTRICITY : DRIVERS HEATING CONTROL SHUTDOWN Min
38 VOLTAGE 380 220
39 PHASE 3 1 DRIVER (7.1.5)
40 HERTZ 50 50 Driver
GEAR Type Electric Motor
N/A
41 PERFORMANCE * VARIABLE SPEED REQUIRED Yes
42 PROPOSAL CURVE NO. RPM SOURCE OF VARIABLE SPEED 0~100%
43 As Tested Curve No. OTHER
44 IMPELLER DIA.: RATED MAX. MIN. mm MANUFACTURER
45 RATED POWER kW EFFICIENCY (%) NAMEPLATE POWER (Refer to LV Motor Datasheet) kW
3
46 RATED CURVE BEP FLOW (at rated impeller dia) [Note 2] m /h Nominal RPM
3 3
47 MIN FLOW : THERMAL m /h STABLE m /h RATED LOAD RPM
3
48 PREFERRED OPERATING REGION (6.1.11) to m /h FRAME OR MODEL
3
49 ALLOWABLE OPERATING REGION to m /h ORIENTATION HORIZONTAL
50 MAX HEAD @ RATED IMPELLER m LUBE
51 MAX POWER @ RATED IMPELLER (6.8.9) kW BEARING TYPE:
52 NPSH3 AT RATED FLOW [Note 1] m RADIAL /
53 CL PUMP TO U/S BASEPLATE m THRUST /
54 NPSH MARGIN AT RATED FLOW : m STARTING METHOD Closed-Valve (Unloaded) Start
3
55 SPECIFIC SPEED (6.1.9) m /s, rpm, m SEE DRIVER DATA SHEET
56 SUCTION SPECIFIC SPEED LIMIT
3
m /s, rpm, m NOTES
3
57 SUCTION SPECIFIC SPEED m /s, rpm, m 1] The NPSH margin shall be at least 0.5m or 20% across the complete
58 MAX. ALLOW. SOUND PRESS. LEVEL REQD (6.1.14) 85 (dBA) operating range (from min continuous stable flow to max expected operating flow)
60 MAX. SOUND POWER LEVEL REQ'D (6.1.14) 2] Refer to the Site and Utility Conditions data of this project.
2 API PUMP TYPE: OH2 [API 610 definitions] CASING MOUNTING: CENTERLINE
3 CASING TYPE: (6.3.10)
4 NOZZLE CONNECTIONS: (6.5.5) OH3 BACKPULLOUT LIFTING DEVICE REQD. (9.1.2.6)
5 Size Facing Rating Position CASE PRESSURE RATING:
6 SUCTION RF 300 END MAWP : (6.3.6) bar g @ °C
7 DISCHARGE RF 300 TOP HYDROTEST : 1.5 X MAWP bar g @ °C
8 PRESSURE CASING AUX. CONNECTIONS: (6.4.3.2)
9 No. Size Type Facing Rating Posn. HYDROTEST BB PUMP AS ASSEMBLY
2 SEE ATTACHED API-670 DATA SHEET SEAL SUPPORT SYSTEM MOUNTED ON PUMP BASEPLATE
3 ACCELEROMETER (7.4.2.1) (7.5.1.4) N/A
4 Number of Accelerometers IDENTIFY LOCATION ON BASEPLATE
5 Mounting Location of Accelerometers
6 INTERCONNECTING PIPING BY
7 PROVISION FOR MTG ONLY (6.10.2.10)
8 Number of Accelerometers MECHANICAL SEAL (6.8.1) [Note 1]
9 Mounting Location of Accelerometers SEE ATTACHED ISO 21049/API 682 DATA SHEET
10 ADDITIONAL CENTRAL FLUSH PORT (6.8.9)
11 FLAT SURFACE REQUIRED (6.10.2.11) HEATING JACKET REQ'D. (6.8.11)
12 Number of Accelerometers
13 Mounting Location of Accelerometers HEATING AND COOLING (6.1.17)
14 COOLING REQ'D
15 VIBRATION PROBES (7.4.2.2) COOLING WATER PIPING PLAN
16 PROVISIONS FOR VIB. PROBES COOLING WATER PIPING
17 NUMBER PER RADIAL BEARING FITTINGS
18 NUMBER PER AXIAL BEARING COOLING WATER PIPING MATERIALS
COOLING WATER REQUIREMENTS:
3
19 MONITORS AND CABLES SUPPLIED BY (7.4.2.4) BEARING HOUSING m /h
3
20 HEAT EXCHANGER m /h
3
21 TEMPERATURE (7.4.2.3) TOTAL COOLING WATER m /h
22 PROVISIONS FOR TEMP PROBES HEATING MEDIUM
23 RADIAL BEARING TEMP. OTHER
24 NUMBER PER RADIAL BEARING HEATING PIPING
25 THRUST BEARING TEMP.
26 NUMBER PER THRUST BEARING ACTIVE SIDE PIPING & APPURTENANCES
27 NUMBER PER THRUST BEARING INACTIVE SIDE MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)
28 TEMP. GAUGES (WITH THERMOWELLS) (9.1.3.6) VENT
29 PRESSURE GAUGE TYPE DRAIN
30 Notes: COOLING WATER
31 TAG ALL ORIFICES (7.5.2.4)
32 SOCKET WELD CONN ON SEAL GLAND (7.5.2.8)
33
34 Notes:
35 1] Mechanical Seal: API 682, Plan 11+53B
36 Seal Flush Pipe Type : Tubing 316 SS
37 Seal Flush Piping Joints : Compression fittings
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
Revi si on
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 6 of 9
1 Note SURFACE PREPARATION AND PAINT TEST
33 HYDROSTATIC WIT
34 HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2)
35 OTHER PURCHASER REQUIREMENTS PERFORMANCE TEST WIT
36 COORDINATION MEETING REQUIRED (10.1.3) TEST IN COMPLIANCE WITH (8.3.3.2) API 610
37 MAXIMUM DISCHARGE PRESSURE TO INCLUDE TEST DATA POINTS TO (8.3.3.3) YES
38 MAX RELATIVE DENSITY YES TEST TOLERANCES TO (8.3.3.4)
39 OPERATION TO TRIP SPEED NPSH (8.3.4.3.1) (8.3.4.3.4) WIT
40 MAX DIA. IMPELLERS AND/OR NO OF STAGES NPSH-1ST STG ONLY (8.3.4.3.2)
41 CONNECTION DESIGN APPROVAL (9.2.1.4) NPSH TESTING TO HI 1.6 OR ISO 9906 (8.3.4.3.3)
42 TORSIONAL ANALYSIS / REPORT (6.9.2.10) TEST NPSHA LIMITED TO 110% SITE NPSHA (8.3.3.6)
43 PROGRESS REPORTS YES RETEST ON SEAL LEAKAGE (8.3.3.2.d)
44 OUTLINE OF PROC FOR OPTIONAL TESTS (10.2.5) RETEST REQUIRED AFTER FINAL HEAD ADJ (8.3.3.7.b)
45 ADDITIONNAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1) COMPLETE UNIT TEST (8.3.4.4.1) WIT
46 SOUND LEVEL TEST (8.3.4.5) WIT
47 LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3) CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6)
48 MODAL ANALYSIS REQUIRED (9.3.9.2) LOCATION OF CLEANLINESS INSPECTION @ SUPPLIER'S
49 DYNAMIC BALANCE ROTOR (6.9.4.4) NOZZLE LOAD TEST
50 INSTALLATION LIST IN PROPOSAL (10.2.3.l) CHECK FOR CO-PLANAR MOUNTING PAD SURFACES
51 VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3) MECHANICAL RUN TEST UNTIL OIL TEMP STABLE
52 30 MIN. MECH RUN AFTER OIL TEMP STABLE (8.3.4.2.1)
53 TRANSIENT TORSIONAL RESPONSE (6.9.2.4) 4 HR. MECH RUN TEST (8.3.4.2.2) WIT
54 BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6)
55 IGNITION HAZARD ASSMT TO EN 13463-1 (7.2.13.e) BRG HSG RESONANCE TEST (8.3.4.7)
56 CASING RETIREMENT THICKNESS DRAWING (10.3.2.3) STRUCTURAL RESONANCE TEST (9.3.9.2)
57 FLANGES RQD IN PLACE OF SKT WELD UNIONS (7.5.2.8) REMOVE / INSPECT HYDRODYNAMIC BEARINGS AFTER TEST
58 INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3) (9.2.7.5)
59 CONNECTION BOLTING (7.5.1.7) AUXILIARY EQUIPMENT TEST (8.3.4.6)
60 CADMIUM PLATED BOLTS PROHIBITED EQUIPMENT TO BE INCLUDED IN AUXILLIARY TESTS
61 VENDOR TO KEEP REPAIR AND HT RCDS (8.2.1.1.c)
62 VENDOR SUBMIT TEST PROCEDURES (8.3.1.1) YES LOCATION OF AUXILIARY EQUIPENT TEST
63 SUBMIT INSPECTION CHECK LIST (8.1.5) YES
64 IMPACT TEST (6.12.4.3) PER EN 13445
66
67 REMOVE CASING AFTER TEST
CNPC EASTCHINA
DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 7 of 9
1 Note VERTICAL TYPE (FIG 1.1)
2 REMARKS
3
4
5
6 VERTICAL PUMPS * VERTICAL PUMPS (CONT'D) *
12 MAX THRUST N N
13 SOLEPLATE REQUIRED • SUCTION STRAINER TYPE
29 MATERIALS (additional) *
30 SUCTION CAN / BARREL: LINESHAFT SLEEVES :
31 DISCHARGE HEAD : • BEARING RETAINER :
32 BOWL SHAFT : SHAFT ENCLOSING TUBE :
33 LINESHAFT : DISCHARGE COLUMN :
34 LINESHAFT HARDFACING : PRESSURE RATING: MAWP HYDRO
35 BELLMOUTH : HEAD
36 BOWL BEARING : COLUMN PIPE
37 LINESHAFT BEARING : BOWL
38 SUMP ARRANGEMENT
39 SUMP DIMENSIONS :
44 SUMP DEPTH l1 m
45 PUMP LENGTH l 3+ l 2 m
46 GRADE TO DISCH. l3 m
l4
48 m
l1
49 SUBMERGENCE REQ'D l6 m
l6
50 SUMP DIAMETER Fd m
51 MIN. DISTANCE FROM BOTTOM m
52
53 Fd
54
55
56
57
CNPC EASTCHINA
Revi si on DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 8 of 9
1 Note PRESSURE VESSEL DESIGN CODE REFERENCES
7 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
8 ALTERNATE WELDING CODES AND STANDARDS
9 WELDING REQUIREMENT (APPLICABLE CODE OR STANDARD)
10 WELDER/OPERATOR QUALIFICATION
11 WELDING PROCEDURE QUALIFICATION
12 NON-PRESSURE RETAINING STRUCTURAL WELDING SUCH AS BASEPLATES OR SUPPORTS
13 MAGNETIC PARTICLE OR LIQUID PENETRANT EXAMINATION OF PLATE EDGES
14 POSTWELD HEAT TREATMENT
15 POSTWELD HEAT TREATMENT OF CASING FABRICATION WELDS
16
17 MATERIAL INSPECTION
20 RADIOGRAPHY
21 ULTRASONIC INSPECTION
22 MAGNETIC PARTICLE INSPECTION
23 LIQUID PENETRANT INSPECTION
24 VISUAL INSPECTION (all surfaces)
25
26 REMARKS :
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
CNPC EASTCHINA
Revi si on DESIGN INSTITUTE Co., MAIN FUEL TRANSFER PUMP
LTD.
4829-PMP-0001/0002
Doc I-SP-4829-M-DSH-00001 Rev. 0 Page 9 of 9
1 Note GENERAL NOTES
2 1 Pumps are horizontal centrifugal pump type. Centrifugal pump shut-off head shall not exceed (120%) of specified differential head inclusive
3 of all tolerances.
4
5 2 Pumps shall be hydrostatically tested at 1.5 time MAWP for at least 1 hour. Tested component shall be free from any paint
6 or impregnation product.
7
8 3 Allowable nozzle forces and moments shall be provided in accordance with 3 × Table 5 of API 610
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58