Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
8 views
PDF view of the file GDAS2022_34
Monitoring of a Peanut-shaped TBM Launching Shaft Excavation
Uploaded by
Wing Sheung Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save PDF view of the file GDAS2022_34 For Later
Download
Save
Save PDF view of the file GDAS2022_34 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
8 views
PDF view of the file GDAS2022_34
Monitoring of a Peanut-shaped TBM Launching Shaft Excavation
Uploaded by
Wing Sheung Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save PDF view of the file GDAS2022_34 For Later
Carousel Previous
Carousel Next
Save
Save PDF view of the file GDAS2022_34 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 11
Search
Fullscreen
Monitoring of a Peanut-shaped TBM Launching Shaft Excavation using Fibre Optics and Remote Sensing Techniques ILi", EHY Sze! FL CLo!, SQ Li DY Tan®, A Y F Leung EY MChan? A WY Chan’, TC W Wong’, ‘Geotechnical Engineering Office, Civil Engineering and Development Department, Hong Kong SAR, China *The Hong Kong Polytechnic University, Hong Kong SAR, China ast Development Office, Civil Engineering and Development Department, Hong Kong SAR, China *Comesponding author doi peo or 10 71467 proceedings 139.34 ABSTRACT The tral application of fibre optics and remote sensing techniques for monitoring a peannt-shaped tunnel boring machine (TBM) launching shaft in the Trunk Road T2 and Cha Kwo Ling Tunnel project has recently been completed, This isthe first time in Hong Kong that these techniques are deployed to systematically monitor the entire excavation process of the peamut-shaped shaft. In particular, distributed fibre optic seusing (DFOS) technique based on optical frequency domain reflectometry (OFDR) was used to capture the continuous profiling of the strain measurement by fibre optics installed in the diaphragm wall panels, thus enabling the development of hoop strain to be revealed, To facilitate data interpretation, the excavation process was regularly recorded by the hhandheld light detection and ranging (LIDAR) scanning technique, This paper reports the background and key findings of the monitoring work as wel asthe results of the data analysis. The ‘monitoring work provides valuable field data, which could not be easly obtained on sie inthe past. The data may be of use for numerical back-analysis to better understand the behaviour of shaft excavation. Insights gained in this study could also be useful to future design and construction of similar excavation works. ‘Keywords: Peanut-Shaped Excavation, Fibre Optics Monitoring, LIDAR scanning 1 Introduction The use of circular excavation has become increasingly common for resisting the earth and groundwater pressures by mobilizing hoop compression. Pappin (2011) reported a series of case histories of circular excavations using diaphragm walls as earth retaining structure, including a case in Singapore using dual circular excavation, also known as “peanut-shaped” excavation, Similar peanut-shaped configuration as excavation support has been adopted in the Trunk Road T2 and Cha Kwo Ling Tunnel (collectively “the T2”) project in Hong Kong for the launching of the TBMs in order to enhance construction flexibility by eliminating steel struts, facilitate faster shaft excavation, assembly of the TBMs and construction of the permanent tunnel box structure, and significantly reduce impacts on adjacent structures and environment. However, the performance of such an innovative scheme, in particular the mobilisation of hoop action, has not been systematically monitored and reviewed in Hong Kong. Therefore, a comprehensive monitoring scheme was deployed to understand the performance of the peanut-shaped shaft excavation of the T2 project. Fibre optic sensing was proposed as the primary sensing technique for the monitoring scheme to monitor the structural performance of the shaft, supplemented by remote sensing technique using handheld LIDAR scanner to monitor the progression of excavation. Various literature has reported a wide range of application of fibre optics on geotechnical engineering over the last decade such as the detection of slope and ground surface movements (e.g., Zhu et al, 2012, Kechavarzi et al. 2016 and Schenato et al. 2017), earth pressures measurements (e.2., ‘Xuet al. 2017) and determination of soil nail forces (e.g., Zu et al, 2012 and Kechavarzi et al. 2016). © 2022 Cope held by the author(), Published by AIIR Publisher in the “Proceedings of The HKTE Geotechnical Division +428 Annual Seminar. A New Era of Metropolis and Inastrcture Developments m Hong Kong. Challenges and Oppottunti to Geotectneal Engmeenng"(GDAS2022) May 13,2022. Organized by the Geoteimical Dison. The Hong Kong Instution of Enainces, Proceedings DOI: 1021467 proceedings 133; Series 1 Proceedings; ISSN’ 2582-3922; ISBN: 978-81.957605.1.0,Monitoring ofa Peanut shaped TBM Launching Shah Excavation using Fibre Optics and Remote Sensing Tecnigues ‘Hoop action in circular excavation was studied by Schwamb et al. (2014) and Torisu et al. (2019) using distributed fibre optic sensing (DFOS) technique based on Brillouin optical time domain reflectometry (BOTDR) with a spatial resolution of 1.0 m. However, the behaviour of non-conventional circular shafts such as peanut-shaped excavation has not been studied in detail using such technology. In this study, the peanut-shaped shaft of the T2 project was instrumented with DFOS system based on optical frequency domain reflectometry (OFDR), which enables an improved spatial resolution of $ cm. Application of remote sensing techniques has also gained its popularity in geotechnical engineering over the last decade, In Hong Kong, the Geotechnical Engineering Office (GEO) of the Civil Engineering and Development Department (CEDD) has been applying various remote sensing techniques such as light detection and ranging (LIDAR), Interferometric Synthetic Aperture Radar (InSAR) and photogrammetry for acquisition of geospatial data to support geotechnical studies on landslide hazard. Amongst different techniques, LIDAR was considered the most effective for the ‘unique terrain setting of Hong Kong (So et al. 2021). Comprehensive reviews on the application of different LiDAR equipment including terrestrial, airborne, mobile and handheld devices were given by Leung & Ho (2020). The use of handheld LiDAR scanner was found the most suitable for the remote, cramped and complicated site setting in Hong Kong due to its compactness, simple operation, and short mobilisation time while maintaining high accuracy. To date, most applications of handheld LiDAR devices were on slope stability and emergency landslide inspection. In this study, their application is extended to the monitoring of the excavation and lateral support works at the peanut-shaped shaft of the 2 project with an aim to assist the interpretation of fibre optics monitoring. 2 Project Background The T2 project comprises 3.4 km of dual-two lane trunk road connecting the Central Kowloon Route on the West and the Tseung Kwan O-Lam Tin Tunnel on the East. Together they constitute Route 6, In this project, two 2.4 km sub-sea tunnels will be constructed mainly using two 14 m diameter TBMs drilling concurrently from Kai Tak through Kwun Tong Typhoon Shelter to Lam Tin, The TBM launching area comprised a conventional rectangular cut-and-cover tunnel and a peanut-shaped shaft as shown in Plate 1 and Figure 1. Both tunnel and shaft were constructed by diaphragm walls as vertical support elements. In this study, fibre optic cables were installed in three selected diaphragm wall panels as shown in Plate 1. Two panels, C1-01 and C2S-03 were located at the peanut-shaped shaft, The third panel, DN-03, was located at the cut-and-cover tunnel, As shown in Figure 1(b), the site is generally underlain by 14 m of fill and 5 m of marine deposits which overlaid 18 m of alluvium followed by 24 m of Completely Decomposed Granite (CDG) above the bedrock at around 60 m below ground. In general, the diaphragm wall panels in the cut-and-cover tunnel and the Y-shaped wall panels in the peanut-shaped shaft were founded on Grade III or better rock while the other panels in the peanut- shaped shaft were founded in CDG. avandover turn Peanut Shape shat (panel wth Re opti cable) (2 pani with bre opti cables) Plate 1: General view of the TBM launching area showing diaphragm wall panels with fibre optics cables instrumented Proceedings DOE 1021467 pocetigs 133 se Sree AUR Procentings ISBN. 978 51.957605.10See eal Alla Proceedings. pp.396-406, 2022 @ ‘Figure 1: (a) General layout of the TBM launching area and (b) Cross section of the TBM launching area 2 m long and 30 m wide on plan with a maximum excavation depth of about 32 m, The lateral support system included four layers of concrete slab and two layers of steel struts as shown in Figure 1(b). The peanut-shaped shaft was mainly constructed from two circular shafts, namely, “Cell 1” and “Cell 2”, with diameters of approximately 44 m and 41 m respectively. The maximum excavation depth was approximately 38 m. Cell 1 and Cell, 2 were connected by four ¥-shaped wall panels and two crosswalls, namely, the eastern crosswall and ‘westem crosswall as shown in Figure (a). The peanut-shaped shaft was further supported laterally by ‘The rectangular cut-and-cover tunnel was approximatel two reinforced concrete beams installed at +2.5 mPD and -13.S mPD spanning across the northern and southern side of the cofferdam as shown in Figure 1(b). The peanut-shaped cofferdam resisted the lateral earth and water pressure by developing compressive hoop forces which were then transferred to the Y- shaped wall panels, the reinforced beams and the two crosswalls. The fibre optics and handheld LIDAR monitoring period was approximately 6 months, covering the pumping test, bulk excavation, lateral support and base slab installation works. It also captured the effect of the concurrent demolition of the crosswalls as the excavation proceeded. The construction sequence is mainly divided into six stages and they are plotted with the change in general excavation levels in the peanut-shaped shaft as shown in Figure 2. r a Ev = Dermoisting cosswal £ -20] ie i 3 230 ae : salam ae Saas Viz 2912 26M 252 29/3 204 IBIS 1516 1377 Date Figure 2: Construction sequence and general excavation levels in the peanut-shaped shaft 3. Distributed Fibre Optic Sensing (DFOS) 3.1 Working Principle The basic working principle of using optical fibres for vibration, strain or temperature measurement is based on light scattering. Light, being a transverse electromagnetic wave, when being transmitted through the core of the optical fibre, interacts with the constituent atoms and molecules of the core. Proceedings of The HKIE Geotechnical Divison 42° Anal Seminar (GDAS2022) 98Monitoring ofa Pearat-shaped TAM Launching Shaft Ervatin using Fibre Optics and Remate Sensing Techn Local impurities within the cable will cause back-scattering of the light (Soga & Luo 2018). Ifthe fibre is subjected to temperature or strain changes, the characteristics of the back-scattered beam and thus the scattered signal in the fibre will be modulated by these physical changes. By measuring the changes of the modulated signal, the corresponding changes in strain and temperature can be correlated (Bao & Chen 2012). There are three different mechanisms of back-scattering — Rayleigh, Brillouin and Raman scattering as shown in the typical back-scattered light spectrum in Figure 3. A detailed account of different DFOS systems was given by Soga & Luo (2018), which are mainly catergorised based on the technique used for detection of various forms of back-scattering and hence the measurement of vibration, strain or temperature, scatering nena Feary Figure 3: Typical spectrum showing three modes of back-scattering. In this study, the DFOS system adopted is based on optical frequency domain reflectometry (OFDR) for Rayleigh scattering detection. The typical set-up is shown in Figure 4, Similar set-up was also reported by Wu et al. (2020). The incident light from a tunable laser source is divided into the reference light and measurement light by an optical coupler. Once the measurement light is back-scattered, the back-scattered light will be mixed with the reference light by the optical coupler and subsequently demodulated by the photoelectric detector to obtain the strain and temperature measurement, The changes in strain and temperature can be correlated with the spectral shift by Equation (1): Av = C.Ae + CrAT @ where Av = Rayleigh spectrum shift, Ae = strain changes in the fibre optic cable, AT = temperature change for the fibre optic cable, C, = strain change constant and Cy = temperature change constant Optical Roferegce tight OPA! coupler coupler Photoolxie ‘Tunable laser Taptop source r detector £ |{scauered tigi \ Structure Measurement ight Figure 4: Typical set-up of OFDR for Rayleigh scattering detection 3.2. Field Installation and Monitoring Two types of fibre optic cables, namely, strain sensing cable and temperature sensing cable, were installed in the three selected diaphragm wall panels for monitoring, The strain sensing cable is fabricated using tight-buffered, steel strand-reinforced and medium-
| ‘Air Annulus Steel strand reinforcements 4 Spiral armour MDPE jacket GI Kevlar ye Metal mesh LSZH sleeve (@) (b) Figure 5: (a) Strain sensing cable and (b) temperature sensing cable Strain and temperature sensing cables were installed on both the retained side and excavated side of the diaphragm wall panels. The typical arrangement of the cables is shown schematically in Figure 6(a), The strain sensing cables were arranged in two different configurations. One was aligned vertically along the wall panel for bending strain measurement for all three panels. The other was a zig-zag layout for hoop strain measurement at 6 different elevations (H1 to H6) for panels C1-01 and C2: ‘Meanwhile, temperature sensing cables were aligned vertically along all three wall panels to measure temperature induced strain at different elevations. The fixing details of the cables are shown in Figure 6(b). During the fabrication of the reinforcement cage, the cables were fixed to the steel bars of the reinforcement cage by hose clips and rubber sheets. Pre-tensioning was applied to both bending and hoop strain sensing cables using a tensioning device to achieve a pre-tensile strain of about 1000 jie Pre-tensioning enables easy identification of the measuring sections interested due to the exhibition of peak strain at the pre-tensioned sections of the cables (Schwamb et al, 2014), No pre-tensioning was applied to the temperature sensing cables. Due consideration and attention should also be given to the future construction activities near the instrumented panels. In panel C1-01, for instance, breaking of conerete cover was necessary as part of the construction to expose the couplers for connecting the lateral support beams. Based on experience gained, since the cables were placed very close to the concrete cover, extreme care must be exercised in installing cables and breaking concrete cover in panels of this type to avoid accidental exposure and physical damages to the cables. © Find it i te iia te @ (o) Figure 6: (a) Typical arrangement of fibre optic cables and (b) fixing details of fibre optic cables on reinforcement cages Proceedings of The HKIE Geotechnical Divison 42° Anal Seminar (GDAS2022) 400Monitoring ofa Peara-shaped TBM Launching Shaft Excavation using Fibre Optics and Rema Sensing Tech DFOS data was collected using an OFDR-based interrogator (OSI-S). The device can produce a spatial resolution of 1 em in a sensing range of 100 m with a measuring accuracy of + 1 je. In this study, given the signal to noise ratio and the length of the fibre optic cables, a spatial resolution of $ em ‘was achieved. 3.3. Data Analysis 33.41 Curvature and Lateral Wall Movement Wall curvature can be computed from the strain measurement obtained from the retained side and excavated side using Equation (2) kg) = fae @ aa where k(z) = curvature at depth z, ¢,(2) = strain at the retained side at depth z, ¢,(2) excavated side at depth z and Ad = horizontal distance between the cables on the retained side and the excavated side Lateral wall deflection is then computed by double integration of the curvature obtained from Equation (2) above. Inclinometers were installed at or near the three instrumented wall panels for establishing the two boundary conditions for integration. The top deflection could therefore be derived directly from the measured top movement from inclinometer. The bottom deflection is taken as zero, which is the same assumption used for inclinometers. The reliability of using fibre optic sensing to obtain wall curvature and deflection profile is best investigated using data obtained from wall panel no. DN-03 in the conventional multi-propped rectangular excavation, in which the results can be easily interpreted. Figure 7(a) and Figure 7(b) shows a comparison between the results obtained from inclinometers and fibre optic sensors on accumulative curvature and wall deflection of DN-03. The data shows the change from Stage 3 to Stage 5 where concurrent excavation and support installation took place in the rectangular tunnel. It can be seen that While the general trend of curvature was comparable between the two instruments, the fibre optic sensors registered a more reasonable curvature characteristic below the excavation depth with less fluctuation. Regarding wall deflection, a more consistent and comparable trend was observed. In particular, both optic fibre sensor and the inclinometer recorded a maximum deflection of about 28.4 mm and 37.2 mm respectively near the excavation depth at -25 mPD. a £25 eae “ss - 0 00 35, 30 a ee dive etrvature (10 Him) Bptacctenin (@) ) Figure 7: Comparison between fibre opties sensing and inclinometer on (a) accumulative curvature and (b) wall deflection on DN-03 Proceedings DOE 1021467 pocetigs 133See eal AUlh Pcenange p9.396-406 33.2 Hoop Foree and Circumferential Bending Moment In this paper, the results from C2S-03 will be presented as an example to demonstrate the use of fibre optics sensing technology for studying hoop force and circumferential bending moment development in the peanut-shaped shaft. As mentioned in Section 3.2, hoop strains were measured at six different elevations from -26.7 mPD to -35 mPD across the wall panel indicated as H1 to H6. For better ‘visualization, hoop strains from the top (HL), middle (F3) and bottom (F6) sections are presented as shown in Figure 8(a) and Figure 8(b) (tensile strain as positive and compressive strain as negative). The hoop strains indicated here were averaged out per 1 m cable length at each elevation and plotted against the construction stages Stage 1 (S1) to Stage 6 ($6). In general, both retained side and excavated side of the peanut-shaped shaft developed compressive hoop strain as the excavation works proceeded, with a larger hoop strain increase at the retained side, which is reasonable. 100 100 = so so et ° ° eat Pe = 50 + #10 3 100 1 E150 g150 : 2 Heat a0. 2F seri | tt 250 asofmesimmt | tt 300 300 Set 350 350 st er) eta} as fee. (b) Figure 8: (a) Hoop strains development on retained side and (b) hoop strains development on excavated side of 28.03 To better understand the behaviour of the peanut-shaped excavation, the hoop force and circumferential bending moment of C2S-03 are presented in Figure 9(a) and Figure 9(b) respectively During Stage 1, before excavation in Cell 1 and Cell 2, the positive hoop force and negative bending moment induced in C2S-03 were likely attributed by the partial lateral pressure release due to the excavation of the adjacent cut-and-cover tunnel. During Stage 2 to Stage 4, the combined effect of the dewatering and excavation works at the peanut-shaped shaft induced a progressive increase in compressive hoop force and hence an increase in circumferential bending moment. When the excavation level reached about -27 mPD at Stage 5, the western crosswall was concurrently demolished from -15.0 mPD to -25 mPD as shown in Figure 1(b). The release of the compressive hoop force and circumferential bending moment due to this crosswall demolition was successfully captured by the fibre optics sensors as highlighted in grey in Figure 9a) and Figure 9b). Once the excavation works proceeded beyond -25 mPD, both the compressive hoop force and circumferential bending moment increased again until they were generally stabilised when the final excavation level at about -32.6 mPD ‘was reached during Stage 6. 100 += 315 ; | Po) 3a soglielo is Bes ear cig iuisl s @) b) Figure 9: (a) Hoop force development and (b) circumferential bending moment development of C2S-03 Proceedings of The HKIE Geotechnical Divison 42° Anal Seminar (GDAS2022) 42Monitoring ofa Pearat-shaped TAM Launching Shaft Ervatin using Fibre Optics and Remate Sensing Techn From the data analysis, it can be seen that DFOS technology offers an innovative and reliable solution in investigating the performance of the peanut-shaped excavation with partial crosswall demolition, In particular, the capability of producing continuous profiling of hoop forces and circumferential bending moment development is a clear advantage over other traditional instrumentations such as inclinometers and vibrating wire strain gauges, which only provide discrete measurement points. 4 Remote Sensing Using Handheld LiDAR Scanner 4.1 Methodology Remote sensing using LiDAR technique was carried out as part of the monitoring scheme of the peanut- shaped excavation in the T2 project to obtain 3D geospatial information (point clouds) of the site. Given the cramped setting of the construction site with much plant and machinery that operated around the clock, handheld scanning devices were considered the most suitable where portability and efficiency were the main considerations such that impact to the construction progress could be minimised. In order to compare the 3D information with the actual site conditions and measurements, the point clouds obtained were transformed to the Hong Kong coordinate system HK80 by geo-referencing. A combination of fixed control points using existing structures coordinates and mobile control points using survey spheres was established on site 10 ensure sufficient control points could always be ‘maintained within the line of sight throughout the monitoring period. Tn order to minimise cumulative ettor due to diff, a “closed loop” survey path was maintained in every scan to ensure the compounded error could be distributed within the loop. The scanning covered the entire TBM launching area at the 2 including both the cut-and-cover tunnel and peanut-shaped shaft. 4.2 Equipment and Data Acquisition The portable scanning device adopted in this study was the ZEB Horizon. It mainly consists of a 2D laser range scanner head and a built-in inertial measurement unit (IMU) mounted on a rotary motor drive (Figure 10). The rotary action of the scanner provides the third dimension required to generate 3D information. The scanner head emits laser pulse and subsequently detects reflected pulses to determine the distance between the scanner and the objects being measured (Leung & Ho, 2020). Data received from the scanner head is then combined with the IMU data using the simultaneous localisation and mapping (SLAM) algorithm for acquisition of 3D point clouds (GeoSLAM Limited, 2020). The total Weight including the battery and data-logger is only about 3 kg. The maximum scanning range is 100 m with a scanning rate of 300,000 points per second. A complete scan including set-up time required about 1.5 hour, which is considerably quicker than conventional land surveying, which normally takes at least half a day to cover a site of comparable size. ase scanner head with Ina on rotary motor dive Figure 10: Main components of the handheld laser scanning device Proceedings DOE 1021467 pocetigs 133 osSee eal AUlh Pcenange p9.396-406 43° Data Processing The common data processing included noise removal, sub-sampling, geo-referencing and merging datasets, etc. Noise was mainly contributed from moving objects, which generated redundant signal and should be removed. In order to enhance the level of detail obtained from the cut-and-cover tunnel where multiple lateral supports were constructed, separate scanning was performed at close range at different support levels Within the cut-and-cover tunnel. After geo-referencing, these individual sub-sample datasets could be easily merged to supplement the geospatial information of the main model. In this study, data processing was carried out using an open-source freeware CloudCompareV2 (CloudCompare 2015). Figure U1 shows the typical work flow outlining the processing tasks to produce a 3D model of the TBM launching area. Processed data NNolse removal + sub-sampling Geo-referencing + data merging Figure 11: Typical workflow of data processing 44° Data Analysis The processed data, being geo-referenced, enable useful analysis like cutting cross-sections, dimension ‘measurement and estimation of excavation extent, ete. By way of an example, Figure 12(a) shows the measurement of excavation depth of a typical cross-section extracted from the cofferdam using CloudCompareV2. Throughout the construction, a trial location was selected and a comparison was made between LIDAR measurement and site records on excavation level as plotted in Figure 12(b). It demonstrates that LiDAR measurement can provide reasonably comparable results. The use of LiDAR technique offers an added advantage of capturing the entire profile in the space as compared with integrating single measurement points manually based on the conventional survey method. 1 (a (b) Figure 12: (2) Typical cross section extracted from 3D LIDAR mode! and (b) comparison between LIDAR measurement and site measurement Proceedings of The HKIE Geotscnial Division 42% Annual Seminar (DAS: 408Monitoring ofa Pearat-shaped TAM Launching Shaft Ervatin using Fibre Optics and Remate Sensing Techn Previous LiDAR studies undertaken on natural hillsides or landslide sites seldom involved frequent and periodic scanning. Their data analysis was largely based on a single model. Change detection application reported by So et al. (2021) was based on 3 different LIDAR datasets that were few to ten years apart for assessing change of ground profile due to landslide. However, a higher monitoring frequency is more suitable for excavation and lateral support works. In this study, frequent scanning on a weekly basis was carried out throughout the entire monitoring period. Over 30 complete datasets were acquired, The geo-referenced 3D information can be integrated against time for a complete 3D visualisation of the construction sequence. Figure 13 shows some extracted dataset which are correlated With the construction sequence Stage | to Stage 6 mentioned in Figure 2 ‘1 - Excavation of C&C shaft + S2-Commencement of excavationof 53 Stage 2 pumping test + Stage 1 pumping Test peanut shaped shaft installation of RC beam 36 Final excavation evel reached at §5- concurrent demaltionof western __‘S4~Further excavation to -25 mPD ppeanut-shapee shaft crosswallat-25 mPD Figure 13: 3D visualisation of construction sequence from LIDAR dataset showing key construction stages $1 to $6 Given the complex site setting and construction sequence of the T2 project, the 3D construction sequence visualisation served as a useful tool for prompt cross-checking of the actual construction progress against the design scheme. The LiDAR data successfully captured the critical activities such as excavation, installation of lateral supports and crosswall demolition. Clearly, the information obtained further reinforced the interpretation of the fibre optics results presented in Section 3 above. S Conclusions This paper presented the state-of-the-art monitoring techniques employing fibre optics sensing and handheld remote sensing devices using LiDAR to study the behaviour of a peanut-shaped excavation, which is first of its kind being implemented in Hong Kong. Fibre optics sensing offers superior capability over traditional monitoring instruments in terms of producing continuous profiling of hoop strains, hoop forces and circumferential bending moment, which are essential in assessing the soil- structure interaction of non-conventional circular excavation, Wall deflection profiles obtained are comparable with those obtained from inclinometers. Potential further work including using the fibre Proceedings DOE 1021467 pocetigs 133See eal AUlh Pcenange p9.396-406 optics data for numerical back-analysis can be explored to facilitate the furure design and construction of excavation and lateral support works of a similar nature. The simple operation of handheld LiDAR scanner also greatly reduces the surveying time and minimises disturbance to the site works. Digitisation of actual site conditions allows quick data analysis to assist the verification of design and monitoring of construction progress. Further application is envisaged to incorporate the 3D dataset into the Building Information Modelling (BIM) system to facilitate design optimisation and assets management. 6 Declarations 6.1 Acknowledgements This paper is published with the permission of the Director of Civil Engineering and Development, the Head of the Geotechnical Engineering Office, the Project Manager of the East Development Office and the Hong Kong Polytechnic University of the Hong Kong Special Administrative Region, China, 6.2 Publisher’s Note ADR remains neutral with regard to jurisdictional claims in published maps and institutional affiliations, References ‘Bao, X.& Chon, 2012. Racent progress in distbuted fiber opi sensor. Sensors 2012, 12(7): 8601-8639, ClovdCompare 2015. CloudCompare Version 261: User Manual. CloudComspre GeoSLAM Limited: 2020. ZEB. Horizan User's Mansl v1 3. Ga0SLAM Limited ‘Kachavam, C. Sopa, K, de Batista, N, Pescanos,L., Eshaie, MZEB & Mair, RI 2016 Distributed Fibre Optic Stain Sensing for ‘Monitoring Cuil Infastwctre-A practical guid. ICE Publishing ‘Leung, WK. & Ho. YX. 2020 A New Ganarstion of landheld Larer Scanning for Quality Enhancement so Gactachnicel Smeg Processing of HIE Geotechnical Diniion Antl Seine 2020" 50-61 Poppin, J 2011. Ccuar excavations wsing diaphragm walls. APEC Seminar on the Statv-of the Practice of Desp Excavation Works in ‘Malaysia, Tanvan and Bong Rong 2011: 111-120. Schenats, L. Palmer, L. Camporese, M, Bers. S, Cola,S. Paruto, A, Galtcssa, A, Sandia, P. & Simonin, P2017. Disbuted opticel ses saning for eay detection of sallow landslides tngpenng. Scintiis Reports 7- 4686 DOI 10 1036841598. 017- 2610-1 Schwamb, T, Soga, K. Maie R J. Elhasie MZE., Sueno R. Bogut CS Gresaiood J 2014 Fibs ote monitaring ofa deep ‘srelar excavation. Procesdngs ofthe Inston of Canl Enpinsers ~Gactacicel Engineering, 167(2) 144-184 ICE Pablsbing So, ACT, Ho, TYK, Wong, ICF. Lai, ACS, Leung, WK. & Kwan, ISH 2021, Advanomg the use of LIDAR in geotechnical applications ia Hoag Kong — A 10-year overview: The ‘Dad Asian Conference on Remote Sensing (ACRS2021), Viet, 22-24 ‘November 202% Soga, K. & Lun, L. 2018. Distributed fiber opies sensors for civil engineering infrastructure sensing. Jour of Structural Integnty and Maistenasce, 3(2) pp 21 Torsu, SS. Fastin NE. Eshafie MZ. Black M, Soga.K, {&Matt RJ.2019 Montonng of Shaft Excavations in Clay. Intemational (Contessa Sonar Iniestmeture end Constmstion 2019 (CSIC) 655-664 ICE Publ Wo, H, Zhu, HH. Zhang, CC, Zhou, GY. Zhu, B. Zhang. W. & Azarafa, M2020. Strain inepration tase soil shear displacement measurement using high seolution sin sensing tchnoloyy, Measuteneat, 166: pp 12. Xa, DS. Dang, Li. Borana, L& Len, HIE 2017. Ear-waming systema with quascdistisuted ber optic sensor astworss and cloud Computing for sol slopes, IEEE Acost, vol: 25437 ~ 25444 DOL: 10.1109, ACCESS 2017 2771494, 2h, HHL, Ho, AN. Via, Su, H.W. Ba HF, & Hong, CY. 2012. An optical fibre monitoring ysten for aaluating the performace fof si aaa slope. Smart Stractres and Systeme 6(5)- 363-410, Proceedings of The HKIE Geotechnical Divison 42° Anal Seminar (GDAS2022) 406
You might also like
Remote Sensing: Tunnel Monitoring and Measuring System Using Mobile Laser Scanning: Design and Deployment
PDF
No ratings yet
Remote Sensing: Tunnel Monitoring and Measuring System Using Mobile Laser Scanning: Design and Deployment
19 pages
Monitoring: A. Morino A. Balestrieri G. Carrieri M. Martino G. Pezzetti
PDF
No ratings yet
Monitoring: A. Morino A. Balestrieri G. Carrieri M. Martino G. Pezzetti
44 pages
Distributed Fiber Optic Sensing For Real-Time Monitoring
PDF
No ratings yet
Distributed Fiber Optic Sensing For Real-Time Monitoring
61 pages
Distributed Fiber Optic Sensing System For Well-Based Monitoring Water
PDF
No ratings yet
Distributed Fiber Optic Sensing System For Well-Based Monitoring Water
49 pages
Journal of Rock Mechanics and Geotechnical Engineering
PDF
No ratings yet
Journal of Rock Mechanics and Geotechnical Engineering
5 pages
Distributed Optical Fibre Strain Sensing of Geotechnical Structures
PDF
No ratings yet
Distributed Optical Fibre Strain Sensing of Geotechnical Structures
6 pages
1-s2.0-S2095268617306122-main
PDF
No ratings yet
1-s2.0-S2095268617306122-main
10 pages
ts06h-ts06h Lam 3995
PDF
No ratings yet
ts06h-ts06h Lam 3995
10 pages
12.2193588
PDF
No ratings yet
12.2193588
4 pages
Applications of Terrestrial Laser Scanning For Tunnels - A Review PDF
PDF
No ratings yet
Applications of Terrestrial Laser Scanning For Tunnels - A Review PDF
13 pages
Seminar
PDF
No ratings yet
Seminar
28 pages
2010 FDL Tust
PDF
No ratings yet
2010 FDL Tust
15 pages
Cive420 Advanced Geomechanics: DECEMBER 9, 2020
PDF
No ratings yet
Cive420 Advanced Geomechanics: DECEMBER 9, 2020
25 pages
JTE20180645
PDF
No ratings yet
JTE20180645
13 pages
8846955
PDF
No ratings yet
8846955
10 pages
Crack Width Design Approach for Fibre Reinforced Concrete Tunnel Segments
PDF
No ratings yet
Crack Width Design Approach for Fibre Reinforced Concrete Tunnel Segments
17 pages
Optical_Fiber_Sensor_Experimental_Research_Based_o
PDF
No ratings yet
Optical_Fiber_Sensor_Experimental_Research_Based_o
13 pages
E-APN_FO-MINING-SAFETY-_19_10_15-ROCTEST
PDF
No ratings yet
E-APN_FO-MINING-SAFETY-_19_10_15-ROCTEST
4 pages
Tolerances for TBM Thrust Load Based on Crack Opening Performance of Fibre Reinforced Precast Tunnel Segments
PDF
No ratings yet
Tolerances for TBM Thrust Load Based on Crack Opening Performance of Fibre Reinforced Precast Tunnel Segments
15 pages
Keynote Papers: Ference, Particularly Margaret Sherry, Sara Arm
PDF
No ratings yet
Keynote Papers: Ference, Particularly Margaret Sherry, Sara Arm
38 pages
Automated Systems As A Part of Geotechnical Monitoring in
PDF
No ratings yet
Automated Systems As A Part of Geotechnical Monitoring in
7 pages
Fibre Optic Sensors BOTDR and Its Applications
PDF
No ratings yet
Fibre Optic Sensors BOTDR and Its Applications
43 pages
Loess Tunnel Lining Cracking Analysis and Monitoring System Research
PDF
No ratings yet
Loess Tunnel Lining Cracking Analysis and Monitoring System Research
7 pages
Point Cloudwróblewski - 2023 - IOP - Conf. - Ser. - Earth - Environ. - Sci. - 1189 - 012005
PDF
No ratings yet
Point Cloudwróblewski - 2023 - IOP - Conf. - Ser. - Earth - Environ. - Sci. - 1189 - 012005
13 pages
Advanced Underground Space Technology
PDF
No ratings yet
Advanced Underground Space Technology
4 pages
Landslide Monitoring Using A Road-Embedded Optical
PDF
No ratings yet
Landslide Monitoring Using A Road-Embedded Optical
10 pages
10 1 1 491 750 PDF
PDF
No ratings yet
10 1 1 491 750 PDF
6 pages
Sensors 21 06338 v2
PDF
No ratings yet
Sensors 21 06338 v2
20 pages
FDOT BC353 19 RPT
PDF
No ratings yet
FDOT BC353 19 RPT
293 pages
cp.2015.0160
PDF
No ratings yet
cp.2015.0160
4 pages
Effect of TBM Advance in The Structural Response of Segmental Tunnel Lining
PDF
No ratings yet
Effect of TBM Advance in The Structural Response of Segmental Tunnel Lining
21 pages
Distributed Fiber Optics Strain Measurements For Monitoring Geote
PDF
No ratings yet
Distributed Fiber Optics Strain Measurements For Monitoring Geote
10 pages
Vibrations induced by TBM in urban areas
PDF
No ratings yet
Vibrations induced by TBM in urban areas
16 pages
Ai thesis 9
PDF
No ratings yet
Ai thesis 9
19 pages
1 Monitoring Vibrations
PDF
No ratings yet
1 Monitoring Vibrations
9 pages
3D laser scanning in underground station
PDF
No ratings yet
3D laser scanning in underground station
12 pages
Crack Monitoring in Reinforced Concrete Beams by Distributed Optical Fiber Sensors
PDF
No ratings yet
Crack Monitoring in Reinforced Concrete Beams by Distributed Optical Fiber Sensors
17 pages
Numerical Modeling of LiDAR Based Geolog
PDF
No ratings yet
Numerical Modeling of LiDAR Based Geolog
10 pages
Railway Slope Monitoring Based On Dual-Parameter F
PDF
No ratings yet
Railway Slope Monitoring Based On Dual-Parameter F
14 pages
Geophysical Research Letters - 2018 - Zhang - Vertically Distributed Sensing of Deformation Using Fiber Optic Sensing
PDF
No ratings yet
Geophysical Research Letters - 2018 - Zhang - Vertically Distributed Sensing of Deformation Using Fiber Optic Sensing
10 pages
CaseStudy1-Acikgozetal2022
PDF
No ratings yet
CaseStudy1-Acikgozetal2022
16 pages
1997 US Army Corps of Engineers Tunnels and Shafts in Rock 236p
PDF
No ratings yet
1997 US Army Corps of Engineers Tunnels and Shafts in Rock 236p
236 pages
Prof-Potnis
PDF
No ratings yet
Prof-Potnis
35 pages
White Paper Optical Infrastructure monitoring-HBM
PDF
No ratings yet
White Paper Optical Infrastructure monitoring-HBM
6 pages
White Paper Optical Infrastructure monitoring-HBM PDF
PDF
No ratings yet
White Paper Optical Infrastructure monitoring-HBM PDF
6 pages
3D numerical simulation of TBM excavation for predicting surface settlements - state of the art_24_09_09_10_48_02
PDF
No ratings yet
3D numerical simulation of TBM excavation for predicting surface settlements - state of the art_24_09_09_10_48_02
9 pages
Inaudi - Salt Cavern Monitoring System For Early Detection of Sinkhole Formation
PDF
No ratings yet
Inaudi - Salt Cavern Monitoring System For Early Detection of Sinkhole Formation
4 pages
1 Hindawi
PDF
No ratings yet
1 Hindawi
16 pages
Analysis of downhole temperature-strain response in hydraulic fracturing – A coupled geomechanics-thermal-flow simulation approach
PDF
No ratings yet
Analysis of downhole temperature-strain response in hydraulic fracturing – A coupled geomechanics-thermal-flow simulation approach
20 pages
Tunnel Surveying Robot PDF
PDF
No ratings yet
Tunnel Surveying Robot PDF
1 page
S088677982100314X
PDF
No ratings yet
S088677982100314X
18 pages
1 s2.0 S2352012421007037 Main
PDF
No ratings yet
1 s2.0 S2352012421007037 Main
19 pages
Distributed Optical Fibre Sensing For Early Detect
PDF
No ratings yet
Distributed Optical Fibre Sensing For Early Detect
8 pages
Silva Et Al - Twin Tunnels Excavated in Mixed Face Conditions WTC2019 Reviewed
PDF
No ratings yet
Silva Et Al - Twin Tunnels Excavated in Mixed Face Conditions WTC2019 Reviewed
10 pages
Structure From Motion Photogrammetry
PDF
No ratings yet
Structure From Motion Photogrammetry
12 pages
1-s2.0-S0886779815300560-main
PDF
No ratings yet
1-s2.0-S0886779815300560-main
18 pages
1-s2.0-S2096249524000796-main
PDF
No ratings yet
1-s2.0-S2096249524000796-main
12 pages
Method of Statement Instrumented MLT (Fibre)
PDF
No ratings yet
Method of Statement Instrumented MLT (Fibre)
17 pages
A Procedure For Determining The Optimal Cross-Section of Sub-Rectangular Tunnel
PDF
No ratings yet
A Procedure For Determining The Optimal Cross-Section of Sub-Rectangular Tunnel
5 pages