JSA FOR PANEL REPLACEMENT

The document is a Job Safety Analysis (JSA) for the Electrical Distribution Panel Replacement at Khursaniyah Gas Plant, detailing necessary personal protective equipment and potential hazards associated with the job. It outlines specific job steps, required hazard controls, and emergency procedures to ensure worker safety. The JSA is prepared, reviewed, and approved by relevant personnel, emphasizing compliance with safety standards and protocols.

Uploaded by

Mohammed Fahad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

JSA FOR PANEL REPLACEMENT

The document is a Job Safety Analysis (JSA) for the Electrical Distribution Panel Replacement at Khursaniyah Gas Plant, detailing necessary personal protective equipment and potential hazards associated with the job. It outlines specific job steps, required hazard controls, and emergency procedures to ensure worker safety. The JSA is prepared, reviewed, and approved by relevant personnel, emphasizing compliance with safety standards and protocols.

Uploaded by

Mohammed Fahad
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

KHURSANIYAH GAS PLANT

JOB SAFETY ANALYSIS

Page no.1 Rev. 0


CONTRACT NO. 6511131700
Electrical Distribution Panel Replacement

BLD6-110 Admin,

JOB TITLE Electrical Distribution Panel Replacement AREA BLD6-113 Dining

BLD6-120 Fire Station

LOCATION 01/08/2024
KGP ( Khursaniyah gas plant ) DATE

WORK DESCRIPTION Electrical Distribution Panel Replacement JSA NO. IPD-JSA-PANEL-001

PREPARED BY: Project in charge


REVIEWED BY: HSE Supervisor APPROVED BY: Construction Manager
Kamran Akram
Ande Srinivas Nadeem Anwar
Signature
Signature Signature
Date
Date Date

REVIEWED BY APPROVED BY :
Name: Name:
Signature: Signature:
Date: Date:

REQUIRED (MARK “X”) OR RECOMMENDED (“R”) PERSONAL PROTECTIVE EQUIPMENT

FR CLOTH GOGGLES / SAFETY GLASS CHEMICAL SUIT 2-WAY RADIO

HELMET FACE SHIELD GLOVES SAFETY SHOES

IPD-JSA-PANEL-001
KHURSANIYAH GAS PLANT

JOB SAFETY ANALYSIS

Page no.2 Rev. 0


CONTRACT NO. 6511131700
Electrical Distribution Panel Replacement

BODY HARNESS HEARING PROTECTION CARTRIDGE RESPIRATOR OTHERS (PLS SPECIFY):

SUPPLIED AIR SPECIAL CLOTHINGS GAS MONITORING EQUIPMENT

REFERENCE: CSM 5TH EDITION & GI’S


2.100- WORK PERMIT SYSTEM
2.709- GAS TESTING
7.031- EQUIPMENT SERVICES
2.705- CERTIFICATION OF HIGH VOLTAGE CABLE SPLICERS
6.012- ISOLATION, LOCKOUT AND USE OF HOLD TAGS
HEAT STRESS PLAN WILL BE IMPLEMENTED AS PER CSSP
WORKERS WILL BE SUSPENTED OR STOPPED IF SITUATION WARRANTS AND EMERGENCY RESPONSE PLAN SHALL BE IMPLEMENTED AS PER CSSP
ALL PPE’S SHALL MEET THE CRITERIA SPECIFIED IN SAUDI ARAMCO CSM, GENERAL INSTRUCTION AND SCHEDULE D

STE SEQUENCE OF POTENTIAL HAZARDS REQUIRED HAZARD CONTROLS ACTION BY


P No BASIC JOB STEPS
 Secure appropriate working permits indicating specific areas and
 Slips, trips, timing of work.
 falls,
 Body pains,  Install warning signs to alert people of the hazard.
Separation of area,  falling materials,
1 equipment’s, and  Struck-by,  All equipment shall be inspected prior to entrance to site.
materials  Pinch-point,
CONTRACTOR/OPERATIONS
 Caught-in-between,  Identify nearest Emergency Assembly area.
 Personal injury, 
 Releases, leakages,  Prior identification of nearest Emergency shower/eyewash locations.
 Fire
 Conduct prior gas testing (if required) before issuance of work permit

IPD-JSA-PANEL-001
KHURSANIYAH GAS PLANT

JOB SAFETY ANALYSIS

Page no.3 Rev. 0


CONTRACT NO. 6511131700
Electrical Distribution Panel Replacement

 Identify and prepare location to be utilized as temporary stacking area


for materials.

 Ensure supervision and safety coverage is available while work is in


progress.

 Barricades shall be erected and equipped with flashing or beacon


lights.

 Check electrical equipment prior to use. Ensure it is properly


inspected, color coded for the month and properly documented.

 Practical jokes, horseplay, running (except for emergencies) shall be


forbidden.
 All mobile equipment machines shall be inspected, and KGH Plants
 Collision, (Khursaniyah gsa plant) six-month sticker shall be conspicuously
 Struck-by, attached before mobilization to job site.
 Slips, trips, falls,  Avoid overexertion.
2 Mobilization of tools  Personal injury,
and equipment to site  Body pains  Sufficient illumination shall be provided.
CONTRACTOR
 Ensure proper grounding is connected to equipment before operation

 Walkways shall be clutter-free and well-lit


Preparation  Electrical shock,  Ensure all power sources are shut off at the main breaker.
3  incorrect disconnection,  Verify power is off using a non-contact voltage tester.
 damage to existing wiring.  Review wiring diagrams of the building.
CONTRACTOR/OPERATIONS

Removal of the Old  Electrical shock,  Wear appropriate PPE including gloves and eye protection.
4 Panel  sharp edges,  Use proper lifting techniques and tools to handle the heavy panel.
 heavy lifting.
CONTRACTOR/OPERATIONS

IPD-JSA-PANEL-001
KHURSANIYAH GAS PLANT

JOB SAFETY ANALYSIS

Page no.4 Rev. 0


CONTRACT NO. 6511131700
Electrical Distribution Panel Replacement

Installation of the New  Incorrect installation,  Follow manufacturer’s installation guidelines.


Panel  electrical shock,  Double-check connections.
5  short circuits.  Ensure grounding and bonding are correctly done according to local
electrical codes. `CONTRACTOR/OPERATIONS

Reconnecting the  Mislabeling of circuits leading  Carefully label all wires during disconnection. CONTRACTOR/OPERATIONS
6 Circuits to incorrect connections,  Verify each connection during the reconnection phase.
 electrical shock.  Test each circuit individually before full activation.

Testing and  Faulty connections,  Use appropriate testing equipment to check voltage and continuity. CONTRACTOR/OPERATIONS
Commissioning  electrical fires.  Have a second qualified electrician review the work.
7  Ensure all circuit breakers are functioning correctly.

 Conduct a toolbox talk each day before commencing work.


 Keep an accessible and fully charged fire extinguisher nearby.
 Maintain a clean and clutter-free work area.
 Ensure all team members are familiar with emergency procedures.

 Define direction of pulling and check if cable stands are correctly CONTRACTOR/OPERATIONS
 Pinch-points, positioned
 Caught-in-between,
 Cuts,  Avoid overexertion
8 Cable Pulling  abrasion,
 Falls,  sufficient manpower shall be provided
 Body pains,
 Personal injury  Frequent breaks/intervals shall be observed.
 Observe proper ergonomics CONTRACTOR/OPERATIONS
 Personnel positioning adapted to illumination source

9  Cuts/abrasions,  Tools/materials shall be kept away from walking areas and removed
Cable Glanding  Muscular/joint pains, when unused
 Eye strain/headaches,

IPD-JSA-PANEL-001
KHURSANIYAH GAS PLANT

JOB SAFETY ANALYSIS

Page no.5 Rev. 0


CONTRACT NO. 6511131700
Electrical Distribution Panel Replacement

 Slips, trips  The technician should be certified by ARAMCO.

 Always use proper PPE and proper tools for the job.
 Electrocution,  Guaranty that power source is defeated before commencing activity CONTRACTOR/OPERATIONS
Cable Termination  Cuts/abrasions, by confirming with concerned personnel.
10  Muscular/joint pains,
 Eye injury,
 Personal injury
 Personnel shall perform housekeeping around his immediate work CONTRACTOR
area prior to leaving and tools to be returned and kept in a safe place
11 House Keeping  Fires, 
 Slips,  Equipment’s to be shut down, keys removed, or otherwise batteries
 trips, disabled
 falls, 
 Falling from heights, Supervisor/person-in-charge shall, inspect work area to ensure that no
 Falling objects equipment’s are left improperly supported or unsupported prior to
close of permit
Rubbish, spoils, combustible materials shall be removed from work area and be
disposed outside of Wasit Plants

IPD-JSA-PANEL-001