Road Boq Sample
Road Boq Sample
Name of Work: PRADHAN MANTRI GRAM SADAK YOJANA 2021-2022 MRL03-Alunkal Road - Kunjithai Road PACKAGE NO. KR-01-89 Kanjikuzhy BLOCK, Alappuzha DISTRICT INCLUDING MAINTENANCE FOR
FIVE YEARS AFTER COMPLETION
Bidder Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to
enter the Bidder Name and Values only )
1 2 4.000 5 6 53 55
Clearing Grass and Removal of Rubbish - Clearing grass and removal of INR Fifty Eight Thousand Nine
2.01 rubbish upto a distance of 30m outside the priphery of the area as per 1.5726 Hectare 37481.12 58942.81 Hundred & Forty Two and Paise
technical specification Clause 200.1 Eighty One Only
3 PAVEMENT COMPONENTS
Scarifying Existing Bituminous Surface to a depth of 150mm - by
Mechanical Means - Scarifying the existing granular surafce to a depth of
INR One Lakh Fifteen Thousand
150mm and disposal of scarified material with a lift upto 3m and lead upto
3.01 18062.800 Sqm 6.4100000 115782.55 Seven Hundred & Eighty Two and
1000m as per technical specification Clause 301.4.1
Paise Fifty Five Only
Excavation in soil using Hydraulic Excavator and Tippers with disposal
upto 1000m - Excavation for roadwork in soil with hydraulic excavator of
0.9 cum bucket capacity including cutting and loading in tippers, trimming INR Ten Thousand Four Hundred &
3.02 bottom and side slopes, in accordance with requirements of lines, grades 295.474 Cum 35.5300 10498.19 Ninety Eight and Paise Nineteen
and cross sections and transporting to the embankment location with a lift Only
upto 1.5m and lead upto 1000m as per technical specification Clause
302.3
5 CC PAVEMENT
6 CD WORKS
Dismantling of structures- Dismantling existing structures like culverts,
bridges, retaining walls and other structures comprising of masonry,
cement concrete, woodwork, steelwork, including T&P and scaffolding
INR Four Thousand &Seventy Two
6.01 whereever necessary, sorting the dismantled material, disposal of 3.039 Cum 1340.170 4072.78
and Paise Seventy Eight Only
unserviceable and stacking serviceable material with all lift and lead of
1000m as per technical specification Clause 202.1 - Reinforced Cement
Concrete (RCC) - By Mechanical Means
PCC Grade M 10 - Providing concrete for plain/reinforced concrete in INR One Lakh Fifty Thousand Four
6.06 open foundations complete as per drawings and technical specifications 18.490 Cum 8134.21 150401.54 Hundred & One and Paise Fifty Four
Clause 802, 803, 1202 & 1203- Nominal mix 1:3:6 Only
PCC Grade M 15 - Providing concrete for plain/reinforced concrete in INR Two Lakh Fifty Two Thousand
6.07 substructure complete as per drawings and technical specifications 30.000 Cum 8409.71 252291.30 Two Hundred & Ninety One and
Clause 802, 803, 1202 & 1203- Nominal mix 1:2.5:5 Paise Thirty Only
RCC Grade M 25 - Providing and laying reinforced cement concrete in
superstructure complete as per drawings and technical specifications INR One Lakh Twenty Four
6.08 Clause 800, 1205.4 and 1205.5 -upto 5.00mtr Height 11.444 Cum 10861.48 124298.78 Thousand Two Hundred & Ninety
Eight and Paise Seventy Eight Only
Supplying, fitting and placing TMT bar reinforcement in superstructure - INR One Lakh Sixty Four Thousand
6.09 complete as per drawings and technical specifications Clauses 1002, 1.83858 Tonne 89312.660 164208.47 Two Hundred & Eight and Paise
1010 and 1202 Forty Seven Only
RCC Grade M 20 - Providing and laying reinforced cement concrete in INR Eighty Thousand Two Hundred
6.11 superstructure complete as per drawings and technical specifications Clause 7.755 Cum 10344.40 80220.82 & Twenty and Paise Eighty Two
800, 1205.4 and 1205.5 for Nominal Mix 1:2:4 Only
PVC WHEEP HOLES - Providing weep holes using 75mm dia PVC pipes INR One Thousand Nine Hundred &
6.12 14.000 mtr 138.650 1941.10
4 kg/sq cm including cost of material , labour charges etc. complete Forty One and Paise Ten Only
Painting two coats icluding primer coat after filling the surface with
INR Sixteen Thousand &Sixty Eight
6.14 synthetic enamel paint in all shades on new, plastered / concrete surfaces 87.470 Sqm 183.7000 16068.24
and Paise Twenty Four Only
as per drawing and technical Specification
7 PROTECTION WORKS
Excavation for Structures - Earthwork in excavation for structures as per
drawing and technical specifications Clause 305.1 including setting out,
INR Thirty Four Thousand One
construction of shoring and bracing, removal of stumps and other
7.01 45.600 Cum 749.6200 34182.67 Hundred & Eighty Two and Paise
deleterious material and disposal upto a lead of 50 m, dressing of sides
Sixty Seven Only
and bottom and backfilling in trenches with excavated suitable material :
Ordinary soil : Upto 3 m depth
Guard Stones- Reinforced cement concrete M15 grade guard stones of INR Forty Three Thousand Two
7.04 size 20x20x120cm size embedded in PCC 1:4:8 block of 45x45x45cm size 21.000 Each 2059.740 43254.54 Hundred & Fifty Four and Paise Fifty
with 30cm embedding of stones including painting etc. complete. Four Only
8 DRAIN WORKS
PCC Grade M 10 - Providing concrete for plain/reinforced concrete in INR Forty Eight Thousand Eight
8.02 open foundations complete as per drawings and technical specifications 6.000 Cum 8134.21 48805.26 Hundred & Five and Paise Twenty
Clause 802, 803, 1202 & 1203- Nominal mix 1:3:6 Six Only
PCC Grade M 15 - Providing concrete for plain/reinforced concrete in INR One Lakh Forty Seven
8.03 substructure complete as per drawings and technical specifications 17.550 Cum 8409.71 147590.41 Thousand Five Hundred & Ninety
Clause 802, 803, 1202 & 1203- Nominal mix 1:2.5:5 and Paise Forty One Only
RCC Grade M 20 - Providing concrete for plain/reinforced concrete in INR Forty Six Thousand Nine
8.05 open foundations complete as per drawings and technical specifications 4.950 Cum 9482.36 46937.68 Hundred & Thirty Seven and Paise
Clause 802, 803, 1202 & 1203- Sixty Eight Only
Supplying, fitting and placing TMT bar reinforcement in foundation - INR Thirty Six Thousand Four
8.06 complete as per drawings and technical specifications Clauses 1000 and 0.42075 Tonne 86627.27 36448.42 Hundred & Forty Eight and Paise
1202 Forty Two Only
FOR EXITING CDs AND DRAIN - Engaging Man Mazdoor for clearing INR Twenty Three Thousand Three
8.08 waste , debris, silt etc from the existing culverts and drains including lifting 26.000 Each 897.34000 23330.84 Hundred & Thirty and Paise Eighty
and replacing the covering slabs , foot slabs etc to lines and levels. Four Only
TRAFFIC SIGNS, MARKINGS AND OTHER
9
APPURTENANCES
Traffic Signs- Direction and place identification sign upto 0.90 sqm size
board - Retro - reflective Traffic Signs - Providing and erecting direction
and place identification retro-reflectorised sign as per IRC:67 made of
encapsulated lens type reflective sheeting vide Clause 1701.2.3, fixed INR Sixty One Thousand Nine
9.08 over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm 8.000 Each 7737.6100 61900.88 Hundred and Paise Eighty Eight
supported on 2 inch dia GI Pipe firmly fixed to the ground by means of Only
properly designed foundation with M-15 grade cement concrete 450 x 450
x 600 mm, 600 mm below ground level as per approved drawing and
Tehnical Specification Clause 1701.
Printing new letters and figures of any shade - printing new letter and
per cm
figures of any shade with synthetic enamel paint black or any other INR Two Hundred & Thirty Nine and
9.15 190.000 height of 1.26000 239.40
approved colour to give a even shade as per drawings and technical Paise Forty Only
lette
specifications clause 1701- English and roman
11067.100 Cm 0.74 INR Two Crore Forty Five Lakh Fifty
10 Total Construction cost 24550306.00 Thousand Three Hundred & Six
Only
Maintenance for second Year after completion INR One Lakh Seventy Six
11.02 5242.000 M 1 176762.00 Thousand Seven Hundred & Sixty
Two Only
Maintenance for third Year after completion INR Two Lakh Twenty Thousand
11.03 5242.000 M 1 220953.00
Nine Hundred & Fifty Three Only
Maintenance for fourth Year after completion
INR Six Lakh Sixty Two Thousand
11.04 5242.000 M 1 662858.00
Eight Hundred & Fifty Eight Only
Maintenance for fifth Year after completion INR Nine Lakh Ninety Four
11.05 5242.000 M 1 994287.00 Thousand Two Hundred & Eighty
Seven Only
INR Twenty Two Lakh Nine
12 Total Maintenance cost 5242.000 M 1 2209527.00 Thousand Five Hundred & Twenty
Seven Only
Two Crore Sixty Seven Lakh Fifty
Total in
Figures 26759833.00 Nine Thousand Eight Hundred &
Thirty Three Only
Quoted Rate in Figures Select 0.000 INR Zero Only
Quoted Rate
in Words
INR Zero Only