0% found this document useful (0 votes)
18 views1 page

Daily MATERIAL report template

The document is a Material Tracking Log used for a construction project, detailing essential information such as project title, contractor agency, weather conditions, and field representative details. It includes sections for recording injection data, equipment status, work progress, inspections, and any issues encountered. The log serves as a comprehensive record for tracking material usage and project developments.

Uploaded by

elizgw84
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views1 page

Daily MATERIAL report template

The document is a Material Tracking Log used for a construction project, detailing essential information such as project title, contractor agency, weather conditions, and field representative details. It includes sections for recording injection data, equipment status, work progress, inspections, and any issues encountered. The log serves as a comprehensive record for tracking material usage and project developments.

Uploaded by

elizgw84
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8684 25TH AVENUE,BROOKLYN,NY 11214 TEL: 718-

236-2280 FAX:516-828-4726
EMAIL:[email protected]

MATERIAL TRACKING LOG

PROJECT TITLE & NO. REPORT NO.

CONTRACTOR/ AGENCY WEATHER:

DATE TELEPHONE # TEMPERATURE:

FIELD REPRESENTATIVE LOCATIONS OF INJECTED MATERIAL

HOLE NUMBER AND LOCATIONS


No. LOCATION NUMBER GALLONS INJECTION PSI MISC.

NUMBER GALLONS INJECTED

EQUIPMENT ON SITE: ACTIVE / IDLE

WORK IN PROGRESS:

PHOTOS TAKEN:

MEETINGS:

SPECIAL INSTRUCTIONS GIVEN OR RECEIVED:

CONTROLLED INSPECTIONS /TESTS PERFORMED: (Include results when available)

DAYS OF NO WORK AND REASONS:

DELAYS, DIFFICULTIES, CONTRACTOR ERRORS, DISPUTES, SAFTEY/ LABOR VIOLATIONS, VISITORS:

IMPACT OF CHANGES, CLAIMS, DEFICIENCIES. HAS ANYTHING DEVELOPED WHICH MIGHT LEAD TO A CHANGE ORDER? CITE RFI NO?

REVIEW OF CONTRACTOR'S QUALITY CONTROL REPORT:

FIELD REPRESENTATIVE SIGNATURE DATE