0% found this document useful (0 votes)
13 views

Weekly and Monthly Physical Progress Report

The document is a template for a Weekly and Monthly Physical Progress Report for a project. It includes sections for reporting the planned versus executed work for each week of the month and requires input on various project details. The report is to be prepared and checked by designated personnel, including a project manager.

Uploaded by

zeyineredwan
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Weekly and Monthly Physical Progress Report

The document is a template for a Weekly and Monthly Physical Progress Report for a project. It includes sections for reporting the planned versus executed work for each week of the month and requires input on various project details. The report is to be prepared and checked by designated personnel, including a project manager.

Uploaded by

zeyineredwan
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

Company Name: Document No.

Title Revision No. Page 1 of 1


WEEKLY AND MONTHLY PHYSICAL PROGRESS REPORT 00

Project :________________________

Reporting month:_____________________
Block _______________________________

Weekly work executed


1st week 2 nd week 3rd week 4th week Monthly Qty.
I/N Activity description Unit Planned Excet'd Planned Excet'd Planned Excet'd Planned Excet'd Planned Excet'd % Exec.

______________________ _______________________ _______________________


Prepared By Checked By Project Manager

You might also like