Design_calculations
Design_calculations
1 – Water supply
Demand Estimation and
hydraulic Calculations
Annexure 7.2 – VIWSCO
Water Allocation Letter
Annexure 7.3 - Pipeline
Crossing SH, NH & SCR line
Drawings Submitted to
Stakeholders
ANNEXURE 7.1
WATER DEMAND CALCULATIONS
&
HYDRAULIC DESIGN SHEETS
WATER DEMAND - NAKKAPALLI CLUSTER START UP AREA
Saleable Area HTDS LTDS process CT sewage Toxic ManPower Process Cooling Garden
I
1.00 Pharmaceutical Industries 59.50 15.00 892.50 223.13 223.13 42.36 34.27 0.00 42.84 595.00 211.82 42.84
2.00 Industrial and Consumer Electronics 63.15 6.00 378.91 0.00 36.38 39.41 48.50 24.25 60.63 75.78 197.03 45.47
3.00 Auto and Auto components 69.83 6.00 418.99 0.00 40.22 43.58 53.63 26.82 67.04 83.80 217.88 50.28
4.00 Aerospace and defence 75.25 6.00 451.50 0.00 43.34 46.96 57.79 28.90 72.24 90.30 234.78 54.18
5.00 Engineering 122.59 6.00 735.53 0.00 70.61 76.50 94.15 47.07 117.68 147.11 382.48 88.26
6.00 Building Materials Industry/Non Metallic minerals 85.25 5.00 426.24 0.00 175.82 5.63 81.84 0.00 102.30 234.43 28.13 61.38
7.00 MSME (includes Leather, Plastics, wood etc.,) 26.20 4.00 104.80 0.00 11.53 4.24 40.24 0.00 50.30 14.41 21.22 18.86
8.00 Food and Agro Processing Industry 14.62 10.00 146.22 0.00 81.88 2.46 16.84 0.00 21.06 102.35 12.28 10.53
9.00 Apparels and Textile Industry 55.31 4.00 221.24 0.00 24.34 8.96 84.96 0.00 106.19 30.42 44.80 39.82
10.00 Logistics 26.00 3.50 91.00 0.00 10.40 8.11 14.98 0.00 18.72 13.00 40.56 18.72
11.00 Supporting Facilities (Saleable) 5.00 3.50 17.50 0.00 2.00 1.56 2.88 0.00 3.60 2.50 7.80 3.60
12.00 Utilities+ Commercial+OWS 76.70 2.00 153.40 0.00 0.00 8.59 44.18 0.00 55.22 0.00 42.95 55.22
Sub Total (I) 679.40 4037.82 223.13 719.65 288.35 574.26 127.04 717.82 1389.10 1441.73 489.17
II Infrastructure (Roads, Substation, WTP, CETP etc.,) 0.80 0.77 0.20
13.00 Residential/Social Infrastructure 4.00 10.65 42.60 0.00 0.00 0.00 30.24 0.00
14.00 Settlements, Burial Ground 28.60 5.00 143.00 105.25
15.00 Green Area 173.90 4.00 695.60
16.00 SST 27.00 Note (Assumptions)
17.00 Roads + Railway Corridor 168.20 1. For Industrial area 4.0-15.0 KL/acre/day
18.00 Revenue Water bodies 38.90 2. For Logistic hub and Supporting Facilities area 3.5 KL/acre/day
3. Residential density in Residential Area - 100 Persons per Acre (Industries formulated guid
Sub Total (III) 440.60 4. Employment density - 15 Employees per Acre (Dholere TP2E SIR & SJ Report)
TOTAL 1120.00 5. Floating pop assumed at 20% of Employees
Fire Fighting Water Demand 460.50 6. Demand for Residential 135 lpcd
Total Water Demand without Losses 5379.51 7. Demand for Employees 45 lpcd
TOTAL WATER DEMAND with 15% LOSSES IN KLD 6328.84 8. Demand for Floating 15 lpcd
GRAND TOTAL 6.50 6.33 9. Firefighting demand - 100 * Sqrt(P); P in thousands
MLD 10. For Green area & Open Spaces 5.0 KL/acre/day
11. Industrial wastewater generation accrding Sector and Activities Proposed
12. Domestic wastewater generation @ 80%
Intake at SST calculations
DATA
SAFE
20.7-19.5 = 1.20 m
==========================================================================================================================
==========================================================================================================================
Hazen-Williams Formula:
v = Velocity in m/s
C = Hazen-Williams coefficient
slope(i)= 1 in 279 m
HGL = 24.96 m
Velocity Calculations:
==========================================================================================================================
==========================================================================================================================
Hazen-Williams Formula:
v = Velocity in m/s
C = Hazen-Williams coefficient
slope(i)= 1 in 279 m
m
Other losses@15%= 0.81 m
HGL = 68.17 m
Velocity Calculations: