This document contains notes and specifications for electrical containment systems in a construction project, emphasizing the need for coordination among contractors and adherence to regulations. It outlines the dimensions, materials, and installation requirements for various containment systems, including cable trays and trunking. The document also includes a drawing reference for the layout of these systems on the fifth floor of Block F.

Uploaded by

Corneliu Braga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views1 page

L19017-EDC-BF-05-SK-E-6000

This document contains notes and specifications for electrical containment systems in a construction project, emphasizing the need for coordination among contractors and adherence to regulations. It outlines the dimensions, materials, and installation requirements for various containment systems, including cable trays and trunking. The document also includes a drawing reference for the layout of these systems on the fifth floor of Block F.

Uploaded by

Corneliu Braga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES:

1. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL DRAWINGS,


SPECIFICATION, SCHEDULES ETC. PRODUCED BY THE MEP CONSULTANT'S
AND WIDER DESIGN TEAM.
2. ALL DIMENSIONS IN MILLIMETERS UNLESS OTHERWISE STATED.
3. ANY DISCREPANCIES, ERRORS OR OMISSIONS ARE TO BE CLARIFIED WITH
THE RELEVANT ENGINEER AT THE EARLIEST OPPORTUNITY.
4. ALL WORKS ARE TO BE IN ACCORDANCE WITH THE CURRENT RELEVANT
REGULATIONS, BUILDING REGULATIONS, BRITISH STANDARDS, ACCEPTED
CODES OF PRACTICE & TRADE ASSOCIATION REQUIREMENTS.
5. IT IS THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO LIAISE WITH THE
MAIN CONTRACTOR & ALL OTHER TRADES TO ENSURE THE CO-ORDINATION
OF WORKS TO SUIT PROGRAM CONTRACTS & AVOID CLASHES.
6. THE LAYOUT INDICATES THE PROPOSED HIGH LEVEL PRIMARY
CONTAINMENT ROUTES WHICH SHALL BE USED AS THE BASIS FOR TENDER
COSTING PURPOSES
7. ALL PRIMARY CONTAINMENT SYSTEMS INCLUDING CABLE TRUNKING, CABLE
TRAY AND BASKET TRAYS SHALL BE OF STEEL CONSTRUCTION AND
APPROPRIATE FOR THE SURROUNDING ENVIRONMENTAL CONDITIONS
UNLESS OTHERWISE NOTED ON THE DRAWINGS.
EF EJ 8. ALL HIGH LEVEL CONTAINMENT SYSTEMS SHALL BE FULLY SUPPORTED OFF
THE CEILING SOFFIT VIA SECURELY ANCHORED UNINSTRUT CHANNELS
INSTALLED AT MINIMUM 2000mm INTERVALS ALONG THE ENTIRE LENGTH OF
THE ELECTRICAL CONTAINMENT SYSTEMS.
9. THE FINAL SELECTION OF ALL CONTAINMENT SYSTEMS AND SERVICE
ROUTES SHALL BE FULLY DEVELOPED AND COORDINATED WITH ALL OTHER
SERVICES IN THE NEXT STAGE BY THE ELECTRICAL CONTRACTOR IN
1238 10075 1238 150 10075 ACCORDANCE WITH RIBA STAGE 4 REQUIREMENTS.

100 mmx50 mm LTG & PWR 150 mmx50 mm LV TRAY


50 mmx50 mm FA & SEC 100 mmx50 mm LTG & PWR LEGEND:
50 mmx50 mm DATA & ELV 50 mmx50 mm FA & SEC
50 mmx50 mm DATA & ELV ELV CABLE TRAY

DATA & ELV BASKET TRAY

LV CABLE TRAY

FIRE ALARM TRAY

FA & SEC BASKET TRAY

2725

2725
LTG & PWR TRUNKING

SUB MAINS TRAY

LIFE-SAFETY SERVICES TRAY


EF EG EH EK EJ EL
LV CABLE TRUNKING

SH SERVICE HEAD
E10 LLDB LANDLORDS DISTRIBUTION/PANEL BOARD

RY RYEFIELD BOARD
05 05 AOVP AUTOMATIC OPENING VENTILATION PANEL
E11
41150 41150 FAP FIRE ALARM PANEL

GCC GLIDE COMMS CABINET


Block F Containment Fifth Floor Section 1 Block F Containment Fifth Floor Section 2
2 3 BT DP BT OPENREACH DISTRIBUTION PANEL
1 : 25 1 : 25
4 MAIN PANELBOARD

L19017-EDC-BF-05-SK-E-6000 MECHANICAL CONTROL PANEL


E12 MCP
FARP FIRE ALARM REPEATER PANEL

2 DVR DIGITAL VIDEO RECORDER


L19017-EDC-BF-05-SK-E-6000
E4 FOR HATCHED AREA PLEASE REFER TO TYPICAL
ELECTRICAL RISER LAYOUTS

E13

3
L19017-EDC-BF-05-SK-E-6000

E14

E5
5
E6
L19017-EDC-BF-05-SK-E-6000
E15

E16

E17 E5

E18
899 10075 150 10075107

Block F Fifth Floor Containment Services Layout


1
1 : 100

100 mmx50 mm LTG & PWR 50 mmx50 mm DATA & ELV


50 mmx50 mm FA & SEC 50 mmx50 mm FA & SEC
50 mmx50 mm DATA & ELV 100 mmx50 mm LTG & PWR
150 mmx50 mm LV TRAY
30.09.2022 ISSUE FOR INFORMATION AB AT
Rev Date Description Orig App
Client

2725

2725
Name of
Job

THORNTON PARK

Title of Drawing
BLOCK F FIFTH FLOOR CONTAINMENT
SECTIONS SKETCH

05 05 Drawing No:
L19017-EDC-BF-05-SK-E-6000
41150 41150
Scale @ A1 Model Manager Project Manager

4
Block F Containment Fifth Floor Section 3
5
Block F Containment Fifth Floor Section 4 As indicated RT JT
1 : 25 1 : 25

Mechanical & Electrical


Consulting Engineers
Cork Office
Tel: +353 (0)21 4280476, email:[email protected]
Dublin Office
Tel: +353 (0)1 5313693, email: [email protected]
London Office
Tel: +44 (0)203 0040062 email: [email protected]
www.edcengineers.com

THIS DRAWING IS THE PROPERTY OF E.D.C.


AND SHALL NOT BE USED, REPRODUCED OR
DISCLOSED TO ANYONE WITHOUT THE
PRIOR WRITTEN PERMISSION OF E.D.C. AND
SHALL BE RETURNED UPON REQUEST.

You might also like