4 250 mm thick sand packed boulder soling m3 16.56 21.32 25.92 34.65 38.57 42.05
5 150 mm thick P.C.C 1:1.5:3 for floor m3 9.213 11.970 14.647 19.058 21.312 23.316
7 PCC 1:1.5:3 with 2% WPC, for m3 6.184 7.240 8.152 11.040 11.820 12.480
8 20 mm thick plaster 1:3 with m2 75.39 100.89 125.14 154.50 174.20 191.65
10 Cement pointing work in 1:3 m2 17.83 23.56 28.71 33.37 37.55 41.29
11 Wood Work For Chaukhat m3 0.108 0.108 0.108 0.108 0.108 0.108
12 Wood Work For Lintel m3 0.432 0.432 0.432 0.468 0.468 0.468
13 Wood Work For Wall Plate m3 0.121 0.142 0.160 0.167 0.179 0.190
14 Wood Work For Purlin m3 0.426 0.581 0.744 0.648 0.697 0.739
15 Wood Work For Soffit Bearer 1.5 m c/c m3 0.095 0.110 0.126 0.126 0.126 0.126
16 Wood Work For Eaves board m2 2.84 3.32 3.72 4.20 4.48 4.72
17 Wood Work For Truss m3 0.314 0.372 0.424 0.461 0.495 0.524
18 38mm thick salwood panelled shutter m2 1.35 1.35 1.35 1.35 1.35 1.35
19 Chicken mesh wire for vantilator m2 1.44 1.44 1.44 1.44 1.44 1.44
20 CGI Sheet For Roofing m2 51.40 71.55 89.65 115.29 131.26 145.61
21 Ridge Cover For Roofing m 7.10 8.30 9.30 10.50 11.20 11.80
22 Welded pipe ladder 2.25 m long No. 1.00 1.00 1.00 1.00 1.00 1.00
23 Barbed wire fencing (Type - A ) m 48.20 55.00 56.40 59.20 61.80 64.00
24 Entrence gate in barbed wire fencing (Type-A ) No. 1.00 1.00 1.00 1.00 1.00 1.00
225m3 250m3 275m3 300m3 350m3 400m3
0.126
2 Earthwork in excavation
Hard Soil 1 8.6 7.7 0.7 46.354 m3
G & B Mixed Soil 1 8.6 7.7 1 66.22 m3
Rock 1 8.6 7.7 0.5 33.11 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 8.6 0.63 1.95 21.13
Along short walls 2 7.7 0.63 1.95 18.92
40.05 m3
Deduction
PCC for core wall 1 23.08 0.12 2 -5.539
(L=2(5.5+2*.3+2*.06+4.6+2*.3+2*.06)
PCC for pipe inlet 1 0.6 0.4 0.4 -0.096
PCC for pipe outlet 1 1.25 0.4 0.4 -0.200
PCC for washout 1 1.25 0.45 0.45 -0.253
PCC for over flow 1 0.6 0.4 0.4 -0.096
Door - opening 1 0.9 0.6 1.5 -0.810
Ventilator - opening 4 0.6 0.6 0.6 -0.864
Wooden Lintel
Door 1 1.2 0.6 0.15 -0.108
Ventilator 4 0.9 0.6 0.15 -0.324
43.986 m3
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT50m3 (CHRDU)
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
50 M3
Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
C:\Rijal2\Desing-Estimate\851548124.xls\RT50m3 (CHRDU)
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
50 M3
Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
15 Wood Work For Soffit Bearer 1.5 m c/c 12 1.05 0.075 0.1 0.095 m3
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
C:\Rijal2\Desing-Estimate\851548124.xls\RT50m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
75 M3
0 Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *9.8*8.7*0.86) 0.5 9.8 8.7 0.86 37 m3
2 Earthwork in excavation
Hard Soil 1 9.8 8.7 0.7 59.682 m3
G & B Mixed Soil 1 9.8 8.7 1 85.26 m3
Rock 1 9.8 8.7 0.5 42.63 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 9.8 0.63 1.95 24.08
Along short walls 2 8.7 0.63 1.95 21.38
45.45 m3
Deduction
PCC for core wall 1 27.48 0.12 2 -6.595
(L=2(5.5+2*.3+2*.06+4.6+2*.3+2*.06)
PCC for pipe inlet 1 0.6 0.4 0.4 -0.096
PCC for pipe outlet 1 1.25 0.4 0.4 -0.200
PCC for washout 1 1.25 0.45 0.45 -0.253
PCC for over flow 1 0.6 0.4 0.4 -0.096
Door - opening 1 0.9 0.6 1.5 -0.810
Ventilator - opening 4 0.6 0.6 0.6 -0.864
Wooden Lintel
Door 1 1.2 0.6 0.15 -0.108
Ventilator 4 0.9 0.6 0.15 -0.324
53.698 m3
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT75m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
75 M3
0 Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
C:\Rijal2\Desing-Estimate\851548124.xls\RT75m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
75 M3
0 Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
15 Wood Work For Soffit Bearer 1.5 m c/c 14 1.05 0.075 0.1 0.110 m3
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
C:\Rijal2\Desing-Estimate\851548124.xls\RT75m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
100 M3
0 Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *10.8*9.6*0.94) 0.5 10.8 9.6 0.94 49 m3
2 Earthwork in excavation
Hard Soil 1 10.8 9.6 0.7 72.576 m3
G & B Mixed Soil 1 10.8 9.6 1 103.68 m3
Rock 1 10.8 9.6 0.5 51.84 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 10.8 0.63 1.95 26.54
Along short walls 2 9.6 0.63 1.95 23.59
50.12 m3
Deduction
PCC for core wall 1 31.28 0.12 2 -7.507
(L=2(5.5+2*.3+2*.06+4.6+2*.3+2*.06)
PCC for pipe inlet 1 0.6 0.4 0.4 -0.096
PCC for pipe outlet 1 1.25 0.4 0.4 -0.200
PCC for washout 1 1.25 0.45 0.45 -0.253
PCC for over flow 1 0.6 0.4 0.4 -0.096
Door - opening 1 0.9 0.6 1.5 -0.810
Ventilator - opening 4 0.6 0.6 0.6 -0.864
Wooden Lintel
Door 1 1.2 0.6 0.15 -0.108
Ventilator 4 0.9 0.6 0.15 -0.324
62.198 m3
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT100m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
100 M3
0 Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
C:\Rijal2\Desing-Estimate\851548124.xls\RT100m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
100 M3
0 Drawing No : G-13
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
15 Wood Work For Soffit Bearer 1.5 m c/c 16 1.05 0.075 0.1 0.126 m3
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
C:\Rijal2\Desing-Estimate\851548124.xls\RT100m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
150 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *12.6*11*1.1) 0.5 12.6 11 1.1 76.23 m3
2 Earthwork in excavation
Hard Soil 1 12.6 11 1.2 166.32 m3
G & B Mixed Soil 1 12.6 11 1 138.60 m3
Rock 1 12.6 11 0.5 69.3 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 12.6 0.85 2.3 49.27
Along short walls 2 11 0.85 2.3 43.01
92.28 m3
Triangular Portion :
Long walls 1 10.75 0.85 2.3 21.02
( L = (8+6.7)/2)
Short walls 1 9.20 0.85 2.3 17.99
( L = (7.1+5.8)/2)
Gable wall 1 8.3 0.65 2.3 12.41
Deduction
PCC for core wall 1 34.08 0.12 2.5 -10.224
(L=2(8.6+2*.3+2*.06+7+2*.3+2*.06)
PCC for pipe inlet 1 0.65 0.4 0.4 -0.104
PCC for pipe outlet 1 1.5 0.45 0.45 -0.304
PCC for washout 1 1.5 0.45 0.45 -0.304
PCC for over flow 1 0.65 0.4 0.4 -0.104
Door - opening 1 0.9 0.65 1.5 -0.878
Ventilator - opening 4 0.6 0.65 0.6 -0.936
Wooden Lintel For
Door 1 1.2 0.65 0.15 -0.117
Ventilator 4 0.9 0.65 0.15 -0.351
98.507 m3
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT150m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
150 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT150m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
150 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
15 Wood Work For Soffit Bearer 1.5 m c/c 16 1.05 0.075 0.1 0.126 m3
Note:
Quantity estimate of drain and valve chambers are not included.
C:\Rijal2\Desing-Estimate\851548124.xls\RT150m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
150 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT150m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
175 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *13.3*11.6*1.16) 0.5 13.3 11.6 1.16 89.48 m3
2 Earthwork in excavation
Hard Soil 1 13.30 11.60 1.20 185.14 m3
G & B Mixed Soil 1 13.30 11.60 1.00 154.28 m3
Rock 1 13.30 11.60 0.50 77.14 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 13.30 0.85 2.3 52.00
Along short walls 2 11.60 0.85 2.3 45.36
97.36 m3
Triangular Portion :
Long walls 1 11.45 0.85 2.3 22.39
( L = (8+6.7)/2)
Short walls 1 9.80 0.85 2.3 19.16
( L = (7.1+5.8)/2)
Gable wall 1 8.9 0.65 2.45 14.17
Deduction
PCC for core wall 1 36.68 0.12 2.5 -11.004
(L=2(8.6+2*.3+2*.06+7+2*.3+2*.06)
PCC for pipe inlet 1 0.65 0.4 0.4 -0.104
PCC for pipe outlet 1 1.5 0.45 0.45 -0.304
PCC for washout 1 1.5 0.45 0.45 -0.304
PCC for over flow 1 0.65 0.4 0.4 -0.104
Door - opening 1 0.9 0.65 1.5 -0.878
Ventilator - opening 4 0.6 0.65 0.6 -0.936
Wooden Lintel For
Door 1 1.2 0.65 0.15 -0.117
Ventilator 4 0.9 0.65 0.15 -0.351
106.680 m3
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT175m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
175 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT175m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
175 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
15 Wood Work For Soffit Bearer 1.5 m c/c 16 1.05 0.075 0.1 0.126 m3
Note:
Quantity estimate of drain and valve chambers are not included.
C:\Rijal2\Desing-Estimate\851548124.xls\RT175m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
175 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT175m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
200 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *13.9*12.1*1.22) 0.5 13.9 12.1 1.22 102.6 m3
2 Earthwork in excavation
Hard Soil 1 13.9 12.1 1.2 201.83 m3
G & B Mixed Soil 1 13.9 12.1 1 168.19 m3
Rock 1 13.9 12.1 0.5 84.1 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 13.90 0.85 2.30 54.35
Along short walls 2 12.10 0.85 2.30 47.31
101.66 m3
Triangular Portion :
Long walls 1 12.05 0.85 2.3 23.56
( L = (8+6.7)/2)
Short walls 1 10.30 0.85 2.3 20.14
( L = (7.1+5.8)/2)
Gable wall 1 9.4 0.65 2.58 15.76
Deduction
PCC for core wall 1 38.88 0.12 2.5 -11.664
(L=2(8.6+2*.3+2*.06+7+2*.3+2*.06)
PCC for pipe inlet 1 0.65 0.4 0.4 -0.104
PCC for pipe outlet 1 1.5 0.45 0.45 -0.304
PCC for washout 1 1.5 0.45 0.45 -0.304
PCC for over flow 1 0.65 0.4 0.4 -0.104
Door - opening 1 0.9 0.65 1.5 -0.878
Ventilator - opening 4 0.6 0.65 0.6 -0.936
Wooden Lintel For
Door 1 1.2 0.65 0.15 -0.117
Ventilator 4 0.9 0.65 0.15 -0.351
113.695 m3
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT200m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
200 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
C:\Rijal2\Desing-Estimate\851548124.xls\RT200m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
200 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
15 Wood Work For Soffit Bearer 1.5 m c/c 16 1.05 0.075 0.1 0.126 m3
Note:
Quantity estimate of drain and valve chambers are not included.
C:\Rijal2\Desing-Estimate\851548124.xls\RT200m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
200 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT200m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
225 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *14.5*12.6*1.27) 0.5 14.5 12.6 1.27 116.01 m3
2 Earthwork in excavation
Hard Soil 1 14.5 12.6 1.2 219.24 m3
G & B Mixed Soil 1 14.5 12.6 1 182.7 m3
Rock 1 14.5 12.6 0.5 91.35 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 14.50 0.85 2.30 56.70
Along short walls 2 12.60 0.85 2.30 49.27
105.97 m3
Triangular Portion :
Long walls 1 12.65 0.85 2.3 24.73
( L = (8+6.7)/2)
Short walls 1 10.80 0.85 2.3 21.11
( L = (7.1+5.8)/2)
Gable wall 1 9.9 0.65 2.7 17.38
Deduction
PCC for core wall 1 41.08 0.12 2.5 -12.324
(L=2(8.6+2*.3+2*.06+7+2*.3+2*.06)
PCC for pipe inlet 1 0.65 0.4 0.4 -0.104
PCC for pipe outlet 1 1.5 0.45 0.45 -0.304
PCC for washout 1 1.5 0.45 0.45 -0.304
PCC for over flow 1 0.65 0.4 0.4 -0.104
Door - opening 1 0.9 0.65 1.5 -0.878
Ventilator - opening 4 0.6 0.65 0.6 -0.936
Wooden Lintel For
Door 1 1.2 0.65 0.15 -0.117
Ventilator 4 0.9 0.65 0.15 -0.351
120.728 m3
C:\Rijal2\Desing-Estimate\851548124.xls\RT225m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
225 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT225m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
225 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
15 Wood Work For Soffit Bearer 1.5 m c/c 16 1.05 0.075 0.1 0.126 m3
Note:
Quantity estimate of drain and valve chambers are not included.
C:\Rijal2\Desing-Estimate\851548124.xls\RT225m3 (CHRDU)
0
0
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
225 M3
0 Drawing No : G-14
S. Description No. Length Breath Height Quantity Unit Remarks
No.
Prepared By Checked By
C:\Rijal2\Desing-Estimate\851548124.xls\RT225m3 (CHRDU)
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
250 M3
Drawing No : G-15
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *16.7*13*1.46) 0.5 16.7 13 1.46 158.48 m3
2 Earthwork in excavation
Hard Soil 1 16.7 13 1.4 303.94 m3
G & B Mixed Soil 1 16.7 13 1 217.1 m3
Rock 1 16.7 13 0.5 108.55 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 16.70 0.85 2.50 70.98
Along short walls 2 13.00 0.85 2.50 55.25
126.23 m3
Prepared By Checked By
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
Prepared By Checked By
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
275 M3
Drawing No : G-15
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *17.1*13.5*1.5) 0.5 17.1 13.5 1.5 173.14 m3
2 Earthwork in excavation
Hard Soil 1 17.1 13.5 1.4 323.19 m3
G & B Mixed Soil 1 17.1 13.5 1 230.85 m3
Rock 1 17.1 13.5 0.5 115.43 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 17.10 0.85 2.50 72.68
Along short walls 2 13.50 0.85 2.50 57.38
130.06 m3
Prepared By Checked By
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
Prepared By Checked By
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
300 M3
Drawing No : G-15
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *17.5*14*1.53) 0.5 17.5 14 1.53 187.43 m3
2 Earthwork in excavation
Hard Soil 1 17.5 14 1.4 343 m3
G & B Mixed Soil 1 17.5 14 1 245 m3
Rock 1 17.5 14 0.5 122.5 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 17.50 0.85 2.50 74.38
Along short walls 2 14.00 0.85 2.50 59.50
133.88 m3
Prepared By Checked By
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
Prepared By Checked By
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
350 M3
Drawing No : G-15
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *18.5*14.8*1.62) 0.5 18.5 14.8 1.62 221.78 m3
2 Earthwork in excavation
Hard Soil 1 18.5 14.8 1.4 383.32 m3
G & B Mixed Soil 1 18.5 14.8 1 273.8 m3
Rock 1 18.5 14.8 0.5 136.9 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 18.50 0.85 2.50 78.63
Along short walls 2 14.80 0.85 2.50 62.90
141.53 m3
Prepared By Checked By
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
Prepared By Checked By
QUANTITY ESTIMATE
RUBBLE MASNORY STORAGE TANK
400 M3
Drawing No : G-15
S. Description No. Length Breath Height Quantity Unit Remarks
No.
1 Site clearence (Assuming Slop = 50)
Excavation (Q=1/2 *19.5*15.4*1.71) 0.5 19.5 15.4 1.71 256.76 m3
2 Earthwork in excavation
Hard Soil 1 19.5 15.4 1.4 420.42 m3
G & B Mixed Soil 1 19.5 15.4 1 300.3 m3
Rock 1 19.5 15.4 0.5 150.15 m3
Tank ( L =l+3.1 ), ( B = b+3.1 )
3 Earthwork in filling
Along long walls (B= (0.3+0.95)/2) 2 19.50 0.85 2.50 82.88
Along short walls 2 15.40 0.85 2.50 65.45
148.33 m3
Prepared By Checked By
Prepared By Checked By
Note:
Quantity estimate of drain and valve chambers are not included.
Prepared By Checked By