INTRODUCTION
1
1. PROJECT SCOPE AND OBJECTIVES
DEFINING THE PROJECT SCOPE AND OBJECTIVES IS THE FOUNDATION OF CPM. THE
SCOPE OUTLINES THE WORK REQUIRED TO COMPLETE THE PROJECT, INCLUDING
DESIGN SPECIFICATIONS, MATERIALS, AND LABOR (PMI, 2021). A WELL-DEFINED
SCOPE ENSURES THAT ALL PROJECT REQUIREMENTS ARE CLEARLY UNDERSTOOD,
PREVENTING UNNECESSARY CHANGES THAT COULD DELAY THE PROJECT OR
INCREASE COSTS.
2
WORKFLOWS PROACTIVELY, AND OPTIMIZE RESOURCE UTILIZATION TO
MAINTAIN PROJECT EFFICIENCY (GOULD & JOYCE, 2021).
SCHEDULING TECHNIQUES:
3
FINANCIAL PLANNING AND COST ESTIMATION ARE CRITICAL IN CPM. A WELL-
STRUCTURED BUDGET ENSURES THAT THE PROJECT REMAINS FINANCIALLY
VIABLE AND PREVENTS COST OVERRUNS. TECHNIQUES SUCH AS EARNED VALUE
MANAGEMENT (EVM) ARE USED TO TRACK FINANCIAL PERFORMANCE AND
FORECAST FUTURE EXPENDITURES (CHEN, 2020).
4. RISK MANAGEMENT
4
COMMON CONSTRUCTION RISKS:
5
6. RESOURCE MANAGEMENT
6
DECISION-MAKING FOSTERS TEAMWORK AND IMPROVES PROJECT EFFICIENCY
(PMI, 2021).
7
SUSTAINABLE CONSTRUCTION PRACTICES, SUCH AS ENERGY EFFICIENCY, WASTE
REDUCTION, AND ENVIRONMENTALLY FRIENDLY MATERIALS, ARE INCREASINGLY
PRIORITIZED IN MODERN CPM. ADOPTING GREEN BUILDING STANDARDS SUCH AS
LEED (LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN) CONTRIBUTES TO
LONG-TERM SUSTAINABILITY (KIBERT, 2016).
CONCLUSION
8
REFERENCES:
Hendrickson, C. (2020). Project management for construction: Fundamental concepts for owners,
engineers, architects and builders. Prentice Hall https://trid.trb.org/View/349238
Mubarak, S. A. (2015). Construction Project Scheduling and Control (3rd ed.). John Wiley & Sons
https://pmworldlibrary.net/wp-content/uploads/2015/05/150508-pmwl-saleh-construction-project-
scheduling-wiley-publishing-news.pdf
PMI (Project Management Institute). (2021). A guide to the project management body of knowledge
(PMBOK guide) (7th ed.). PMI Publications. PMI. https://www.pmi.org/pmbok-guide-standards