Construction Project Management (CPM) is a specialized discipline focused on planning, coordinating, and overseeing construction projects to ensure they are completed on time, within budget, and meet quality standards. Key principles of CPM include defining project scope and objectives, effective planning and scheduling, budgeting and cost management, risk management, quality management, resource management, stakeholder communication, contract administration, and safety considerations. Successful CPM is essential for reducing costs, improving efficiency, and mitigating risks in construction projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views9 pages

RSW

Construction Project Management (CPM) is a specialized discipline focused on planning, coordinating, and overseeing construction projects to ensure they are completed on time, within budget, and meet quality standards. Key principles of CPM include defining project scope and objectives, effective planning and scheduling, budgeting and cost management, risk management, quality management, resource management, stakeholder communication, contract administration, and safety considerations. Successful CPM is essential for reducing costs, improving efficiency, and mitigating risks in construction projects.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 9

CONSTRUCTION PROJECT MANAGEMENT (CPM) AND ITS PRINCIPLES

INTRODUCTION

CONSTRUCTION PROJECT MANAGEMENT (CPM) IS A SPECIALIZED DISCIPLINE


THAT FOCUSES ON PLANNING, COORDINATING, AND OVERSEEING CONSTRUCTION
PROJECTS FROM INCEPTION TO COMPLETION. THE PROCESS INVOLVES MANAGING
RESOURCES, SCHEDULES, RISKS, AND STAKEHOLDERS TO ENSURE THAT PROJECTS
ARE COMPLETED ON TIME, WITHIN BUDGET, AND ACCORDING TO QUALITY
STANDARDS (GOULD & JOYCE, 2021). EFFECTIVE CONSTRUCTION PROJECT
MANAGEMENT IS ESSENTIAL FOR REDUCING COSTS, IMPROVING EFFICIENCY, AND
MITIGATING RISKS ASSOCIATED WITH LARGE-SCALE CONSTRUCTION PROJECTS.

CONSTRUCTION PROJECTS CAN RANGE FROM SMALL RESIDENTIAL BUILDINGS TO


LARGE-SCALE INFRASTRUCTURE DEVELOPMENTS SUCH AS BRIDGES, HIGHWAYS,
AND SKYSCRAPERS. THE ROLE OF A CONSTRUCTION PROJECT MANAGER IS TO
OVERSEE EVERY ASPECT OF THE PROJECT, FROM INITIAL PLANNING TO FINAL
EXECUTION, WHILE ENSURING COMPLIANCE WITH LEGAL, ENVIRONMENTAL, AND
SAFETY REGULATIONS. THE IMPORTANCE OF EFFECTIVE CPM CANNOT BE
OVERSTATED, AS POOR MANAGEMENT CAN LEAD TO PROJECT DELAYS, COST
OVERRUNS, AND STRUCTURAL FAILURES (TURNER, 2016).

DEFINITION OF CONSTRUCTION PROJECT MANAGEMENT

CPM IS DEFINED AS THE APPLICATION OF PROJECT MANAGEMENT PRINCIPLES TO


THE CONSTRUCTION INDUSTRY, INTEGRATING KNOWLEDGE, SKILLS, AND
TECHNIQUES TO EXECUTE PROJECTS EFFECTIVELY (KERZNER, 2017). IT INVOLVES
THE SYSTEMATIC APPROACH TO PLANNING, SCHEDULING, EXECUTING,
MONITORING, AND CLOSING A CONSTRUCTION PROJECT WHILE ENSURING
COMPLIANCE WITH CONTRACTUAL OBLIGATIONS, REGULATORY REQUIREMENTS,
AND SAFETY PROTOCOLS (WALKER, 2016).

CORE PRINCIPLES OF CONSTRUCTION PROJECT MANAGEMENT

CONSTRUCTION PROJECT MANAGEMENT IS GOVERNED BY SEVERAL CORE


PRINCIPLES THAT ENSURE THE SUCCESSFUL EXECUTION OF PROJECTS. THESE
PRINCIPLES PROVIDE A FRAMEWORK FOR PROJECT MANAGERS TO ACHIEVE THEIR
OBJECTIVES EFFICIENTLY.

1
1. PROJECT SCOPE AND OBJECTIVES

DEFINING THE PROJECT SCOPE AND OBJECTIVES IS THE FOUNDATION OF CPM. THE
SCOPE OUTLINES THE WORK REQUIRED TO COMPLETE THE PROJECT, INCLUDING
DESIGN SPECIFICATIONS, MATERIALS, AND LABOR (PMI, 2021). A WELL-DEFINED
SCOPE ENSURES THAT ALL PROJECT REQUIREMENTS ARE CLEARLY UNDERSTOOD,
PREVENTING UNNECESSARY CHANGES THAT COULD DELAY THE PROJECT OR
INCREASE COSTS.

THE PROJECT OBJECTIVES DEFINE THE DESIRED OUTCOMES, INCLUDING THE


EXPECTED QUALITY, BUDGET, AND TIMELINE. THESE OBJECTIVES SERVE AS A
GUIDELINE FOR PROJECT PLANNING AND EXECUTION, HELPING PROJECT
MANAGERS AND STAKEHOLDERS STAY ALIGNED THROUGHOUT THE
CONSTRUCTION PROCESS (WALKER, 2016). SETTING CLEAR OBJECTIVES ALSO
FACILITATES BETTER RISK MANAGEMENT AND PERFORMANCE EVALUATION,
ENSURING THAT THE PROJECT STAYS ON TRACK AND DELIVERS THE INTENDED
RESULTS.

TO PREVENT SCOPE CREEP—UNAUTHORIZED CHANGES OR ADDITIONS TO THE


PROJECT—PROJECT MANAGERS MUST ESTABLISH A FORMAL CHANGE CONTROL
PROCESS. THIS PROCESS INCLUDES REVIEWING ALL CHANGE REQUESTS,
ASSESSING THEIR IMPACT ON THE PROJECT'S TIMELINE AND BUDGET, AND
OBTAINING APPROVAL FROM KEY STAKEHOLDERS BEFORE IMPLEMENTING THEM
(KERZNER, 2017). ADDITIONALLY, USING A WORK BREAKDOWN STRUCTURE (WBS)
HELPS IN BREAKING DOWN THE PROJECT SCOPE INTO MANAGEABLE TASKS,
ENSURING THAT EACH PHASE OF THE PROJECT IS EXECUTED EFFICIENTLY (GOULD
& JOYCE, 2021).

2. PROJECT PLANNING AND SCHEDULING

EFFECTIVE PLANNING AND SCHEDULING ARE CRUCIAL FOR COORDINATING


TASKS, ALLOCATING RESOURCES, AND MEETING DEADLINES. A DETAILED
PROJECT PLAN INCLUDES TASK BREAKDOWN, TIMELINES, MILESTONES,
DEPENDENCIES, AND CONTINGENCY PLANS. TECHNIQUES SUCH AS THE CRITICAL
PATH METHOD (CPM) AND GANTT CHARTS ARE COMMONLY USED TO VISUALIZE
PROJECT TIMELINES AND DEPENDENCIES (KERZNER, 2017). PROPER SCHEDULING
ENABLES PROJECT MANAGERS TO IDENTIFY POTENTIAL BOTTLENECKS, ADJUST

2
WORKFLOWS PROACTIVELY, AND OPTIMIZE RESOURCE UTILIZATION TO
MAINTAIN PROJECT EFFICIENCY (GOULD & JOYCE, 2021).

CONSTRUCTION PLANNING TYPICALLY INVOLVES MULTIPLE PHASES, INCLUDING


CONCEPTUAL PLANNING, SCHEMATIC DESIGN, DETAILED DESIGN, PROCUREMENT,
CONSTRUCTION, AND POST-CONSTRUCTION. EACH PHASE REQUIRES CAREFUL
COORDINATION AMONG STAKEHOLDERS TO ENSURE SEAMLESS EXECUTION.

EFFECTIVE PLANNING IS THE CORNERSTONE OF SUCCESSFUL CONSTRUCTION


PROJECT MANAGEMENT. IT INVOLVES DEFINING PROJECT SCOPE, SETTING
OBJECTIVES, AND ESTABLISHING A TIMELINE FOR COMPLETION. THE CRITICAL
PATH METHOD (CPM) IS COMMONLY USED TO DETERMINE THE SEQUENCE OF
CRITICAL ACTIVITIES THAT MUST BE COMPLETED ON TIME TO PREVENT PROJECT
DELAYS (MUBARAK, 2015).

SCHEDULING TECHNIQUES:

o CRITICAL PATH METHOD (CPM)


o PROGRAM EVALUATION AND REVIEW TECHNIQUE (PERT)
o GANTT CHARTS
o LAST PLANNER SYSTEM (LPS)

ADVANCED SCHEDULING SOFTWARE SUCH AS PRIMAVERA P6 AND MICROSOFT


PROJECT ALLOWS MANAGERS TO DEVELOP DETAILED SCHEDULES, TRACK
PROGRESS, AND MAKE REAL-TIME ADJUSTMENTS TO AVOID POTENTIAL
BOTTLENECKS.

3. BUDGETING AND COST MANAGEMENT

FINANCIAL CONTROL IS AN ESSENTIAL COMPONENT OF CPM. PROJECT MANAGERS


MUST DEVELOP ACCURATE COST ESTIMATES, MONITOR EXPENDITURES, AND
IMPLEMENT COST CONTROL MEASURES TO PREVENT BUDGET OVERRUNS
(HENDRICKSON, 2020). EFFECTIVE COST MANAGEMENT INCLUDES FINANCIAL
PLANNING, COST-BENEFIT ANALYSIS, AND BUDGET FORECASTING. REGULAR
FINANCIAL AUDITS AND VARIANCE ANALYSIS HELP IN ASSESSING RISKS AND
ADJUSTING FINANCIAL PLANS TO ALIGN WITH PROJECT NEEDS. ENSURING THAT
PROJECT COSTS REMAIN WITHIN THE ALLOCATED BUDGET ENHANCES FINANCIAL
STABILITY AND PROJECT VIABILITY (PMI, 2021).

3
FINANCIAL PLANNING AND COST ESTIMATION ARE CRITICAL IN CPM. A WELL-
STRUCTURED BUDGET ENSURES THAT THE PROJECT REMAINS FINANCIALLY
VIABLE AND PREVENTS COST OVERRUNS. TECHNIQUES SUCH AS EARNED VALUE
MANAGEMENT (EVM) ARE USED TO TRACK FINANCIAL PERFORMANCE AND
FORECAST FUTURE EXPENDITURES (CHEN, 2020).

FURTHER, EMPLOYING EARNED VALUE MANAGEMENT (EVM) ALLOWS FOR


BETTER FINANCIAL TRACKING, HELPING PROJECT MANAGERS MEASURE COST
PERFORMANCE AND FORECAST BUDGETARY NEEDS ACCURATELY. A WELL-
STRUCTURED FINANCIAL MANAGEMENT PLAN SHOULD ALSO INCORPORATE RISK
ASSESSMENTS AND CONTINGENCY RESERVES TO COVER UNEXPECTED EXPENSES.

4. RISK MANAGEMENT

CONSTRUCTION PROJECTS ARE INHERENTLY RISKY DUE TO FACTORS SUCH AS


MATERIAL SHORTAGES, LABOR DISPUTES, DESIGN CHANGES, AND
ENVIRONMENTAL CONDITIONS. RISK MANAGEMENT INVOLVES IDENTIFYING
POTENTIAL RISKS, ANALYZING THEIR IMPACT, AND IMPLEMENTING MITIGATION
STRATEGIES (WALKER, 2016). PROACTIVE RISK ASSESSMENT ALLOWS PROJECT
MANAGERS TO PREPARE CONTINGENCY PLANS AND ALLOCATE RESOURCES
ACCORDINGLY. STRATEGIES SUCH AS CONTRACTUAL RISK ALLOCATION,
INSURANCE POLICIES, AND SAFETY PROTOCOLS HELP MINIMIZE DISRUPTIONS AND
ENSURE PROJECT CONTINUITY (KERZNER, 2017).

A STRUCTURED RISK REGISTER SHOULD BE MAINTAINED TO DOCUMENT ALL


IDENTIFIED RISKS, RESPONSE STRATEGIES, AND MONITORING MECHANISMS.
UTILIZING SIMULATION TOOLS AND PREDICTIVE ANALYTICS ENHANCES THE
ACCURACY OF RISK ASSESSMENTS, ALLOWING FOR MORE INFORMED DECISION-
MAKING.

IDENTIFYING POTENTIAL RISKS AND DEVELOPING MITIGATION STRATEGIES IS A


FUNDAMENTAL ASPECT OF CPM. RISKS MAY INCLUDE SAFETY HAZARDS, LEGAL
ISSUES, WEATHER CONDITIONS, AND SUPPLY CHAIN DISRUPTIONS. RISK
ASSESSMENT MODELS SUCH AS THE SWOT ANALYSIS (STRENGTHS, WEAKNESSES,
OPPORTUNITIES, AND THREATS) ARE WIDELY UTILIZED TO MANAGE
UNCERTAINTIES (HILLSON, 2017).

4
COMMON CONSTRUCTION RISKS:

o DESIGN ERRORS AND OMISSIONS


o ENVIRONMENTAL AND WEATHER-RELATED RISKS
o HEALTH AND SAFETY HAZARDS
o SUPPLY CHAIN DELAYS

RISK MITIGATION STRATEGIES:

o CONDUCTING THOROUGH FEASIBILITY STUDIES


o IMPLEMENTING CONTINGENCY PLANS
o REGULAR SITE INSPECTIONS AND SAFETY AUDITS

5. QUALITY MANAGEMENT MAINTAINING HIGH-QUALITY STANDARDS


THROUGHOUT THE PROJECT LIFECYCLE ENSURES COMPLIANCE WITH
REGULATIONS AND ENHANCES PROJECT DURABILITY. QUALITY ASSURANCE
(QA) AND QUALITY CONTROL (QC) MEASURES ARE IMPLEMENTED TO ENSURE
THAT CONSTRUCTION MATERIALS AND PROCESSES MEET THE REQUIRED
SPECIFICATIONS (OAKLAND, 2014).

EMPLOYING TOTAL QUALITY MANAGEMENT (TQM) PRINCIPLES AND SIX SIGMA


METHODOLOGIES CAN FURTHER IMPROVE PROCESS EFFICIENCY AND REDUCE
DEFECTS IN CONSTRUCTION PROJECTS.

QUALITY CONTROL AND ASSURANCE:

ENSURING HIGH-QUALITY CONSTRUCTION IS VITAL FOR SAFETY, DURABILITY,


AND REGULATORY COMPLIANCE. QUALITY CONTROL MEASURES INVOLVE
SETTING QUALITY BENCHMARKS, CONDUCTING INSPECTIONS, AND ADHERING TO
INDUSTRY STANDARDS (HENDRICKSON, 2020). QUALITY ASSURANCE STRATEGIES
INCLUDE REGULAR TESTING, THIRD-PARTY EVALUATIONS, AND ADHERENCE TO
LEGAL AND SAFETY REGULATIONS. IMPLEMENTING A ROBUST QUALITY
MANAGEMENT PLAN HELPS IN REDUCING REWORK, ENHANCING CLIENT
SATISFACTION, AND ENSURING THAT THE FINAL PRODUCT MEETS THE SPECIFIED
REQUIREMENTS (PMI, 2021).

5
6. RESOURCE MANAGEMENT

EFFICIENT ALLOCATION OF RESOURCES—INCLUDING LABOR, EQUIPMENT, AND


MATERIALS—IS CRUCIAL FOR PROJECT SUCCESS. CONSTRUCTION PROJECT
MANAGERS MUST BALANCE RESOURCE AVAILABILITY WITH PROJECT DEMANDS
TO PREVENT DELAYS AND INEFFICIENCIES (WALKER, 2016). PROPER RESOURCE
MANAGEMENT INCLUDES WORKFORCE PLANNING, PROCUREMENT STRATEGIES,
AND MATERIAL LOGISTICS. EFFECTIVE COORDINATION OF RESOURCES MINIMIZES
DOWNTIME, REDUCES WASTE, AND ENHANCES OVERALL PROJECT PRODUCTIVITY
(GOULD & JOYCE, 2021).

EFFICIENT ALLOCATION AND UTILIZATION OF RESOURCES, INCLUDING LABOR,


MATERIALS, AND EQUIPMENT, ARE ESSENTIAL FOR PROJECT SUCCESS. PROPER
RESOURCE MANAGEMENT HELPS PREVENT WASTAGE, REDUCE COSTS, AND
IMPROVE PRODUCTIVITY (WALKER, 2016).

KEY ASPECTS OF RESOURCE MANAGEMENT:

a. LABOR MANAGEMENT: ENSURING SKILLED LABOR IS AVAILABLE AND PROPERLY


ASSIGNED TO TASKS.
b. MATERIAL MANAGEMENT: TIMELY PROCUREMENT AND EFFICIENT USE OF
CONSTRUCTION MATERIALS.EQUIPMENT MANAGEMENT: PROPER MAINTENANCE
AND UTILIZATION OF HEAVY MACHINERY TO PREVENT DOWNTIME

USING TOOLS SUCH AS ENTERPRISE RESOURCE PLANNING (ERP) SYSTEMS


STREAMLINES RESOURCE ALLOCATION AND HELPS IN OPTIMIZING PROJECT
WORKFLOWS.

7. STAKEHOLDER COMMUNICATION AND COLLABORATION

EFFECTIVE COMMUNICATION AMONG PROJECT STAKEHOLDERS—INCLUDING


CLIENTS, CONTRACTORS, ARCHITECTS, AND REGULATORY BODIES—IS ESSENTIAL
FOR PROJECT SUCCESS. REGULAR MEETINGS, PROGRESS REPORTS, AND
COLLABORATION TOOLS FACILITATE TRANSPARENT COMMUNICATION AND
COORDINATION (KERZNER, 2017). ESTABLISHING CLEAR COMMUNICATION
CHANNELS ENSURES THAT ALL STAKEHOLDERS ARE ALIGNED WITH PROJECT
GOALS, PREVENTING MISUNDERSTANDINGS AND CONFLICTS. COLLABORATIVE

6
DECISION-MAKING FOSTERS TEAMWORK AND IMPROVES PROJECT EFFICIENCY
(PMI, 2021).

BEST PRACTICES FOR COMMUNICATION:

- REGULAR PROJECT MEETINGS


- TRANSPARENT DOCUMENTATION AND REPORTING
- DIGITAL PROJECT MANAGEMENT TOOLS (E.G., PROCORE, BUILDERTREND)

8. CONTRACT ADMINISTRATION AND LEGAL COMPLIANCE

MANAGING CONTRACTS AND ENSURING COMPLIANCE WITH LEGAL AND


REGULATORY REQUIREMENTS ARE CRITICAL IN CPM. CONTRACTS OUTLINE
PROJECT TERMS, RESPONSIBILITIES, AND DELIVERABLES, SERVING AS LEGAL
DOCUMENTS THAT GOVERN PROJECT EXECUTION (HENDRICKSON, 2020).
COMPLIANCE WITH LOCAL BUILDING CODES, OCCUPATIONAL HEALTH AND
SAFETY STANDARDS, AND ENVIRONMENTAL LAWS PREVENTS LEGAL DISPUTES
AND ENSURES SMOOTH PROJECT COMPLETION. PROJECT MANAGERS MUST ALSO
ENSURE THAT CONTRACTS ADDRESS DISPUTE RESOLUTION MECHANISMS AND
LIABILITY PROVISIONS (WALKER, 2016)

ENSURING CLEAR CONTRACT DOCUMENTATION, BACKED BY LEGAL


CONSULTATION, MINIMIZES PROJECT RISKS AND PROTECTS ALL PARTIES
INVOLVED.

9. SAFETY, SUSTAINABILITY AND ENVIRONMENTAL CONSIDERATIONS

CONSTRUCTION SITES POSE SIGNIFICANT SAFETY RISKS, MAKING OCCUPATIONAL


HEALTH AND SAFETY A PRIORITY. PROJECT MANAGERS MUST IMPLEMENT SAFETY
PROTOCOLS, CONDUCT RISK ASSESSMENTS, AND PROVIDE WORKER TRAINING TO
MINIMIZE ACCIDENTS (GOULD & JOYCE, 2021). ADOPTING BEST PRACTICES SUCH
AS PERSONAL PROTECTIVE EQUIPMENT (PPE) USAGE, SITE SAFETY AUDITS, AND
EMERGENCY PREPAREDNESS ENHANCES WORKER SAFETY. ADDITIONALLY,
ENVIRONMENTAL SUSTAINABILITY CONSIDERATIONS, SUCH AS WASTE
MANAGEMENT, ENERGY EFFICIENCY, AND GREEN BUILDING PRACTICES, PLAY AN
INCREASING ROLE IN MODERN CONSTRUCTION PROJECTS (PMI, 2021).

7
SUSTAINABLE CONSTRUCTION PRACTICES, SUCH AS ENERGY EFFICIENCY, WASTE
REDUCTION, AND ENVIRONMENTALLY FRIENDLY MATERIALS, ARE INCREASINGLY
PRIORITIZED IN MODERN CPM. ADOPTING GREEN BUILDING STANDARDS SUCH AS
LEED (LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN) CONTRIBUTES TO
LONG-TERM SUSTAINABILITY (KIBERT, 2016).

10. PROJECT MONITORING AND CONTROL

CONTINUOUS MONITORING AND CONTROL HELP ENSURE THAT THE PROJECT


REMAINS ON TRACK. KEY PERFORMANCE INDICATORS (KPIS) AND PROJECT
MANAGEMENT SOFTWARE ENABLE REAL-TIME TRACKING OF PROGRESS, BUDGET
ADHERENCE, AND QUALITY BENCHMARKS (KERZNER, 2017). MONITORING
INCLUDES SCHEDULE ADHERENCE CHECKS, COST CONTROL ANALYSIS, AND
QUALITY ASSESSMENTS. REGULAR EVALUATIONS AND CORRECTIVE ACTIONS
HELP IN MAINTAINING PROJECT EFFICIENCY AND ENSURING SUCCESSFUL PROJECT
COMPLETION (WALKER, 2016).

CONCLUSION

CONSTRUCTION PROJECT MANAGEMENT IS A MULTIFACETED DISCIPLINE THAT


REQUIRES CAREFUL PLANNING, EFFECTIVE COORDINATION, AND STRATEGIC
DECISION-MAKING. BY ADHERING TO CORE CPM PRINCIPLES—SUCH AS DEFINING
PROJECT SCOPE, EFFICIENT SCHEDULING, COST CONTROL, RISK MANAGEMENT,
QUALITY ASSURANCE, AND STAKEHOLDER COLLABORATION—CONSTRUCTION
MANAGERS CAN SUCCESSFULLY NAVIGATE PROJECT COMPLEXITIES AND DELIVER
PROJECTS THAT MEET CLIENT EXPECTATIONS. AS THE CONSTRUCTION INDUSTRY
CONTINUES TO EVOLVE, INTEGRATING EMERGING TECHNOLOGIES AND
SUSTAINABLE PRACTICES WILL FURTHER ENHANCE THE EFFECTIVENESS OF CPM
IN DELIVERING HIGH-QUALITY, COST-EFFICIENT, AND ENVIRONMENTALLY
RESPONSIBLE CONSTRUCTION PROJECTS.

8
REFERENCES:

Gould, F. E., & Joyce, N. E. (2021). Construction project management. Pearson.


https://www.pearson.com/en-us/subject-catalog/p/construction-project-
management/P200000001131/9780137467310

Hendrickson, C. (2020). Project management for construction: Fundamental concepts for owners,
engineers, architects and builders. Prentice Hall https://trid.trb.org/View/349238

Kerzner, H. (2017). Project management: A systems approach to planning, scheduling, and


controlling. Wiley. https://www.wiley.com/en-
us/Project+Management%3A+A+Systems+Approach+to+Planning%2C+Scheduling%2C+and+Co
ntrolling%2C+13th+Edition-p-9781119805373

Mubarak, S. A. (2015). Construction Project Scheduling and Control (3rd ed.). John Wiley & Sons
https://pmworldlibrary.net/wp-content/uploads/2015/05/150508-pmwl-saleh-construction-project-
scheduling-wiley-publishing-news.pdf

PMI (Project Management Institute). (2021). A guide to the project management body of knowledge
(PMBOK guide) (7th ed.). PMI Publications. PMI. https://www.pmi.org/pmbok-guide-standards

Walker, A. (2016). Project management in construction. Wiley-Blackwell.


https://www.wiley.com/en-us/Project+Management+in+Construction%2C+6th+Edition-p-
9781118500408