Comparison Chedi
Comparison Chedi
5,655,362.84 AED =
Total offer 717510 $ 1539726 $ 601 500 $ 1301023 $ 93.31 $ per sheet 253472 $
No. of drawings Base on # of sheet -for electrical ( 840 ) based on area per system per system not included as total offer per system
Additional items bill of quantities (BOQs) for all bill of quantities (BOQs) for all bill of quantities (BOQs) for all Not included bill of quantities (BOQs) for all bill of quantities (BOQs) for all
disciplines. disciplines. disciplines. disciplines. disciplines.
Exclusions
1- Any kind of planning and calculation of the Project. 1- Any kind of planning and calculation of the 1- Design: Detailed design, including geotechnical and 1- No design changes are expected to happen. Design 1- Kitchen and Laundry package 1- Pinnacle will not be responsible for any Design work, Design validation, Calculations and Code
2- Infrastructure provisions such as Workstation, Internet Project. structural engineering calculations, is excluded. changes shall be executed on an hourly basis, as 2- Specialist lighting package . analysis.
Connection, Software, etc. for Onsite. 2- Infrastructure provisions such as Workstation, 2- Specific information about manufacturers, materials, or additional work. 3- Façade. 2- Other BIM Services like Animation, Digital twin, AR/ VR, rendered images, 6D, Onsite Deputation,
3- Approvals from any Local Authorities. Internet Connection, Software, etc. for Onsite . detailed specifications is not included. 2- Overall responsibility of design and constructability 4- Acoustics. and others that are not included in the price table, are not currently in Pinnacle's scope for this
4- Design of details, Analysis & Engineering Calculations . 3- Approvals from any Local Authorities . 3- Cable Modelling: The modelling of electrical and data shall remain with the respective design Consultants / 5- Vertical transportation. project.
5- Consulting services for any material and technical 4- Design of details, Analysis & Engineering cables. contractor / sub – contractors. 6- Any steel structure (Model from 3- 3D modeling of Shuttering, Embeds, etc. has not been considered in Pinnacle’s scope.
specifications, electrical/mechanical load calculations, any kind Calculations . 4- Any Work Outside Defined Scope: Any additional work or 3- Landscape design is excluded from the scope . fabricator shall be used for 4- Reinforcement 3D modeling, 2D drawings and BBS are not considered in Pinnacle’s scope.
of compliance documents, define any kind of technical 5- Any item not mentioned in the proposal is to be services outside the defined scope, as 4- Elevators and escalators modelling are excluded from coordination) . 5- No Modeling of Cables and Wires, Smaller diameter (smaller than 25mm) Conduits, etc.
specifications, final assumed excluded and non-applicable. Unless, specified in the proposal, will not be included at this stage. the scope. 7- Any Façade (Model from fabricator 6- No Modeling of Steel Framing for walls, Counters, etc.
management report, operational expenditure report otherwise, mutually agreed to in writing by both 5- Conduit Detailing and Modeling. 5- Preparation of fabrication level drawings is excluded shall be used for coordination) . 7- Smaller diameter Pipes (smaller than 25mm) are not included.
6- Any item not mentioned in the proposal is to be assumed parties. 6- Cable Modeling . from scope. 8- LC systems (Model from fabricators 8- Ironmongery, carpentry detail, Wall connection/joint details, Door-window head jamb details,
excluded and non-applicable. Unless, otherwise, mutually agreed 6- Consulting services for any material and 7-Any design calculations. 6- Room Data Sheet drawings is excluded from scope. shall be used for coordination). Floor connection/joint details and construction joints will not be modeled. Only 2D information in
to in writing by both parties. technical specifications, cost estimates, 8- Providing any prints in hard copy. 7- Apex shall raise RFIs (request for information) as and 9- Earthing. the drawing as per detail received from vendors/available input drawing.
electrical/mechanical load calculations, any kind of 9- Major Design changes when required to expedite the modeling process, the 10- Lightning. 9- Ceiling connection detail & hanger/ ceiling support will not be modeled.
compliance reports, contract & tender documents, 10- Modelling of rebar accessories. client should respond to the queries within 3 working 11- BMS and Scada systems. 10- Coordination with other contractors is not in Pinnacle’s scope of work.
define any kind of technical specifications, final 11- Modeling of Conduits and Cables. days . 12- Fire Alarm . 11- No Steel Member connection details, welding information, formwork/shuttering, erection
tenant fit out report, final facility management 12- Code Compliance with local jurisdictional/statutory 8- Client to create Online Collaboration platform and 13- AV, IT and Security . details (nailing, connection of shoring, fastener, structural platform), steel erection drawing,
report, operational expenditure report. building departments/government authorities, accounts for Apex A360 /BIM 360 if required. 14- Conduits and wires (2D only) . excavation/backfill, post-tension (PT) is not under Pinnacle’s scope.
as and when required. Providing any documentation 9 -Software, Hardware and training are excluded from 15- Laser scanning services. 12- Laser Scanning & Site verification for As-Built condition.
required for compliance and adherence to the scope. 13- Pinnacle will not provide any hard copy of the drawings.
local/statutory laws. 10- Client should provide service provider with the 14- Pinnacle will not provide any software license to the client.
material submittal.
11- Printing drawings in Hardcopies are excluded from
the scope.
12- Any Authorities approvals or Fees are excluded .
13- Any types of field surveys or Data collection .
14- Any activity not covered in the scope of services .