0% found this document useful (0 votes)
12 views1 page

Le Hydra Ksig.

The document provides a certification report for the lifting machine used by M/S. Malik Engineering Corporation, detailing its specifications, examination dates, and safety compliance. The lifting machine, identified by its serial and chassis numbers, was last examined on April 5, 2019, and was found to be in safe working condition. The report emphasizes the importance of daily checks for safety before operation.

Uploaded by

Lavin Malik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views1 page

Le Hydra Ksig.

The document provides a certification report for the lifting machine used by M/S. Malik Engineering Corporation, detailing its specifications, examination dates, and safety compliance. The lifting machine, identified by its serial and chassis numbers, was last examined on April 5, 2019, and was found to be in safe working condition. The report emphasizes the importance of daily checks for safety before operation.

Uploaded by

Lavin Malik
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Head Office:

KR 2nd Floor, 9 Office Space, Omaxe Avenue


Raebareilly Road, Lucknow-226025(U.P.)
Branch Office:
TECHNOSAFE ENGINEERS T-16,904 Nirala Estate, Techzone IV,
COMPETENT PERSONS, SURVEYORS & VALUERS Greater Noida West, GB Nagar (UP)201308
Mobile :8573034092, 9839135093, Email: [email protected], [email protected] , Website: www.krtechnosafe.in

(Refer Section 28/29 of Factories Act.1948)

1. Name of occupier (or Factory) : M/S. MALIK ENGINEERING CORPORATION


2. Address of Factory : C/o. DSCL SUGAR MILL
(A Division of DCM Shriram Ltd)
Vill.: Ajbapur, P.O. Mullapur
Distt.: Lakhimpur Kheri (U.P.)
3. Distinguishing number of marks if any and description : Hydra
sufficient to identify the lifting machine, chains, rope or Sr. No.: UP21BN-7316,
lifting tackle Chassis No.: GO733928,
Engine No.: S433A91321,
Cap/SWL.: 14.0Ton , Make: ACE
Loc .: Site
4. Date when the lifting machine, chain, rope or lifting : 2017
tackle was first taken into use in the factory

5. Date and number of the certificate relating to any test : Nil


and examination made under sub-rules (1) and (7)
together with the name and address of the person who
issued the certificate

6. Date of each periodically through examination made : Previously Tested by Mfg.


under clause (a) (iii) of sub-section (i) of section 28 &
29 of the act and sub-rule (6), and name & designation
of the person by whom it carried out

7. Date of annealing or other heat treatment of chain, other : Nil


lifting tackle made under sub-rule (5) and by whom it
was carried out.

8. Particulars of any defects affecting safe working load : Tested on Load & Found OK
found at any such thorough examination or after
annealing and steps taken to remedy such defect.

It is to certify that I thoroughly examined above mentioned Lifting Machine/ Tackle, Chain , Rope
on 05/04/2019 and found that above is correct report of my examination.
Certificate No. -KRTE/LKO/LE/64/2019-20
Competency Cft. No.- 187 F/C.P.-UP/Org.026/2019, dt. 23.01.2019,Sec.-21(2),28,29,31/Valid up to 31.12.2020
Next Due Date :- 05/04/2020

A.K.Tiwari

[B.Tech, DIS, EMBA, Level-II (ASNT)]


Director/ Competent Person

Note: The above report is issued subject to daily checking of above equipment and all its safety devices for its proper
functioning and safe operations before using.

You might also like