This is the first step of an order initiation. After receiving the artwork from buyer, a
merchandiser need to go through the artwork closely and need to analysis the artwork if there any
issues undone or not clear enough to execute for the next step.
Sometimes, buyer may also provide an original sample to follow rather than a complete
artwork, but working procedure is the same.
2. Sample Development:
After the receipt of the Specification, pertaining to the sample order, the merchandiser has to
understand the buyers' requirements. Sometimes there may be amendments related to any of the
specifications in the sample order sheet/Artwork. It is the duty of the merchandiser to execute
sample order and dispatch on time the “Right quality, Right Quantity, and Right time”
• Yarn cost.
• Process cost (Knitting, Bleaching, and Raising etc.) Rates pertaining to various sewing
operations.
• CMT (Cut Make Trim) Rate.
• Ironing charges, packing charges and accessories rate.
• Overheads.
• Shortage (or) wastage 3%.
• Free on Board (FOB) (Transport charges) 2% to 3%.
• Insurance 2%-3%,
• Buyers’ agents commission 5%-6%, Quota rate per garment. Profit 15% - 20%.
It’s a collection of behavior that involves communications, sales, marketing and conflict
resolution.
Why do we negotiate –
- To reach an agreement.
- To beat the opposition.
- To compromise.
- To settle an argument.
- To make a point.
After price (with quality and delivery Date) confirmation buyer issue order sheet.
Which contains Order qty, Delivery Date, Colorwise order qty. Price/Unit, Total order Qty &
Value). Delivery Port, Shipping terms.
Merchandiser has to make arrangements for the timely delivery of the required accessories
to the concerned units. Accessories requisition slip may be used for requirement purpose. The
merchandiser has to cross check the actual requirements after verifying the details furnished in
accessories requisition form. After the receipt of accessories quality check will be done.
*** Allowances:
• Fabric structure
• Dia. fixation (knitting dia., calendaring dia. and compacting dia.)
• Process loss (shrinkage etc.)
• Size wise piece weight
• Extra quantity required
• Size wise requirement (dia., colour (or) combination)
Time and Action (TNA) calendar is one of the most important tools for managing a
project. In garment manufacturing each order is not less than a project to a merchant. Because, from
order receiving to order completion involve number of tasks of various duration and requirement
of resources. Few tasks come one after another and others move at the same time. Like number of
processes, lot of people are involved to accomplish an order. Secondly each order is unique in terms
of process and time demand. So, a detailed plan with well-defined responsibility is must for each
orders to finish it before time or on time.
Normally merchants prepare a plan in a spreadsheet listing down key processes in one
column and planned date of action for each processes is noted in another. This planning sheet
is called time and action calendar. Once TNA calendar is made, merchant can easily list down
her daily 'to do list' for the day and start doing work one by one. According to TNA schedule
processes are executed on daily basis to track whether an order is on track or getting delayed.
Now the question is "How to prepare a TNA calendar in a given format for an order and How
to maintain the same with less effort?"
Process flow of an order with the list of task which need to be performed.
Production capacity of cutting, sewing, washing and finishing.
For sewing - batch wise and product wise capacity (production per day per batch).
Lead time of activities, e.g. raw material lead time, sampling lead time, etc. Shipment date
or planned ex-factory date.
In first TNA calendar format (Format 1) planning is made for single style with detailed
tasks, schedules, job responsibility and remarks. Steps to be followed during making TNA calendar
are listed below. (As in separate file)
For every order Route card (or) Production scheduling is to be done by the merchandisers.
It facilitates the merchandiser to follow up the orders in a planned manner. The following details
(or) aspects should be considered in drafting (or) scheduling.
• Design
• No. of sewing operations
• No.of processes
• Despatch date
• No. of Components
• Type of stitches
• Order quantity
• Production capacity of the in houses (or) sub-contractors unit and processing units.
• Prioritizing the other factors
• Targeted dates for various processes (or) stages of merchandising.
• Actual finishing date (To cross check the deviation between the planning and actual
performance any stage (or) Process). Targeted dates for all the stages of merchandising should
be decided. Actual dates on which a particular process (or) operation is actually done should
also be entered in production scheduling. The merchandisers are accountable for the deviation.
9.Approvals:
Approval is an authentication of all required conformances related to a process (or) an operation.
The merchandisers should know the quality parameters of various processes and sewing operations
before approvals. There should not heron-conformities. Evidences for approval should be cross
checked to confirm that all the approvals having made properly.
• Measurement
• Style and fit
• Allowances
• Accuracy of pattern
If there is any non-conformance in a pattern that should be corrected before it is used in production
Pattern approval samples will be received from the concerned units and approved by the approval
department (or) merchandisers, If there is non-conformance in any size sample revised sample for
that size should be again submitted for approval.
9. Pre-production samples:
These samples should be submitted on time to the concerned person (Buyers, buyer agents
office buying office). All the quality parameters have to be verified. In case of non-conformances,
it will be mentioned in the approval sheet by the concerned persons. Sometimes we may have to
submit the revised samples after the required rectifications.
• Measurements
• Aesthetics
• Process quality
• GSM
• Piece shrinkage
• Washing fastness of the piece
• Sewing operation quality Print (or) embroidery position Labeling instructions.
• Size set approval seat will be prepared in triplicate.
• Washing fastness of garment should be verified. Shrinkage in garment can also be verified.
Initial Cutting:
Bulk Cutting:
13.Production controlling:
Controlling should be right from the operative level also. Efforts should be taken to control the
nonconformities during production. Consistent supervision is essential to control the
nonconformances. Periodical quality check should be done after an hour.
14.Shortage problem:
The merchandiser has to identify the shortages of any material that is yarn, fabric, accessories etc.
right at the initial stages. After identifying the shortages steps are to be taken for the arrangement
of required materials on time. In case of shortages also we have to follow the quality control and
quality assurance procedure without fail. Quality of the material should not be compromised.
• Sample execution
• Amendments
• Comments on the send samples
• Sample order sheet
• Buyer visit
• Production status
• Sending sample, swatches, Accessories regarding the approvals.
• Sample execution
• Approvals
• Testing procedures
• Production status
• Programming
• Shortage details
• Inspection details arid status.
• Production status for meting etc.
• Report from inspection agencies, testing labs
• Sample details
• Sample Inspection Reports
• Testing Reports
• Evidence of approvals
• Proper filing (Buyer wise, order wise)
• Pattern Approval sheet/size set approval sheet (copy)
• Pilot run Inspection Report
• Fabric Inspection report
• Mid Inspection Report
• Inspection report from buying office, buying agents and inspection agencies.
• Test reports from inspection agencies and labs
• Production status reports
• Production status reports related to meetings Pre-final inspection reports Final
inspection reports etc.