MFM Meter
MFM Meter
Reactive Power :
Phase Voltage applied Current applied Measured Power Calculated Power % Error
In(V.AC) In(A.AC) In(Mvar) In(Mvar)
R 63.51∟90° 1∟0° 5.70 5.71 0.175
Y 63.51∟-30° 1∟240° 5.70 5.71 0.175
B 63.51∟210° 1∟120° 5.70 5.71 0.175
B) Voltage Measurement :
Voltage applied In (V.AC) Voltage Measured In (Kv.AC)
Phase
50 % 100 % 50 % 100 %
R 31.75 63.51 9.524 19.05
Y 31.75 63.51 9.525 19.03
B 31.75 63.51 9.529 19.03
C) Current Measurement.
Current Applied In (%) Current Measured In (A.AC)
Phase
25% 50% 75% 100% 25% 50% 75% 100%
R 25 50 75 100 24.99 49.99 75.13 99.97
Y 25 50 75 100 25.04 50.05 74.99 100.09
B 25 50 75 100 24.89 50.00 74.98 100.05
D) Power Factor Measurement :
Applied Power Factor Measured Power Factor
0.80 Lag 0.802 Lag
0.80 Lead 0.803 Lead
1.00 Unity 1.02 Unity
E) Frequency Measurement :
Phase Applied Frequency Measured Frequency Calculated Frequency % Error
In(Hz) In(Hz) In(Hz)
R 50 50 50 0.0
Y 50 50 50 0.0
B 50 50 50 0.0
Certificate No Page No
Calibration date Calibration due date
Customer details M/s. Diamond 30MW Solar Power Plant,
Voravoo Kavala,Challakere.
Chitradurga (Dist)
Karnataka.
Location Diamond Block-3
System 33KV ICOG Panel
7.0. Status :
Breaker Tested Good, Fit for Operation.
Certificate No Page No
Calibration date Calibration due date
Customer details M/s. Diamond 30MW Solar Power Plant,
Voravoo Kavala,Challakere.
Chitradurga (Dist)
Karnataka.
Location Diamond Block-3
System 33KV ICOG Panel
25 0.25 0.26
Y 100/1-1A 50 0.49 0.51
75 0.74 0.75
100 0.99 1.01
25 0.25 0.24
B 100/1-1A 50 0.50 0.50
75 0.76 0.74
100 0.99 1.01
Certificate No Page No
Calibration date Calibration due date
Customer details M/s. Diamond 30MW Solar Power Plant,
Voravoo Kavala,Challakere.
Chitradurga (Dist)
Karnataka.
Location Diamond Block-3
System 33KV ICOG Panel
Class 0.5/3P 3P 3P
Burden 50VA 50VA 50VA
S.no R-Phase 16/370924
Y-Phase 16/370931
B-Phase 16/371952
5.0.Ratio Test :
Phase Primary voltage Secondary voltage measured In(V.AC)
applied In(V.AC) Phase Core-1 Core-2 Core-3
RY 415 ry 1.38 1,39
YB 415 yb 1.39 1.39
BR 415 br 1.39 1.39 0.462
415 rn 0.80 0.80
415 yn 0.80 0.80
415 bn 0.80 0.80
Certificate No Page No
Calibration date Calibration due date
Customer details M/s. Diamond 30MW Solar Power Plant,
Voravoo Kavala,Challakere.
Chitradurga (Dist)
Karnataka.
Location Diamond Block-3
System 33KV ICOG Panel
5.0.Ratio Test :
Primary voltage applied Secondary voltage measured
Tap In(V.A.C) In(V.A.C)
No LV-1 LV-2
RY YB BR ry yb Br rn yn bn
1 418 416 419 4.65 4.63 4.65 4.65 4.63 4.65
2 417 416 417 4.76 4.74 4.77 4.76 4.74 4.76
3 416 417 418 4.87 4.85 4.87 4.87 4.85 4.87
4 418 418 417 4.99 4.96 4.99 4.99 4.96 4.99
5 418 417 418 5.12 5.09 5.12 5.11 5.08 5.12
6 417 416 419 5.25 5.21 5.24 5.24 5.22 5.25
7 416 417 418 5.40 5.35 5.40 5.40 5.37 5.40
8 419 418 417 5.54 5.50 5.54 5.55 5.50 5.55
9 420 419 418 5.70 5.65 5.70 5.69 5.66 5.69
Primary voltage applied Secondary voltage measured
Tap In(V.A.C) In(V.A.C)
No LV-3 LV-4
RY YB BR ry yb br rn Yn bn
1 418 416 419 4.65 4.63 4.65 4.64 4.63 4.65
2 417 416 417 4.77 4.74 4.76 4.76 4.74 4.76
3 416 417 418 4.87 4.85 4.87 4.87 4.85 4.87
4 418 418 417 5.00 4.97 5.00 5.00 4.97 5.00
5 418 417 418 5.12 5.09 5.13 5.12 5.09 5.15
6 417 416 419 5.26 5.23 5.26 5.26 5.23 5.26
7 416 417 418 5.41 5.36 5.41 5.40 5.35 5.41
8 419 418 417 5.56 5.52 5.54 5.56 5.51 5.55
9 420 419 418 5.70 5.66 5.70 5.69 5.67 5.70
6.0. Magnetizing Current.(Measured in mA)
Tap.no R Y B
1 2.8 1.5 2.4
2 2.7 1.6 2.3
3 3.0 1.9 2.6
4 3.1 2.0 2.5
5(N) 3.3 2.1 2.8
6 3.2 2.0 2.9
7 3.8 2.3 3.2
8 3.7 2.4 3.1
9 4.5 2.9 3.9