The document outlines the specifications for footings in a construction project, including dimensions, reinforcement details, and material requirements. It emphasizes the use of M25 concrete, high yield strength deformed bars, and specific clear cover measurements for reinforcement. Additionally, it notes the safe bearing capacity of soil and includes revisions based on client requirements.

Uploaded by

SivarajSiva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views1 page

02.Foundation Layout

The document outlines the specifications for footings in a construction project, including dimensions, reinforcement details, and material requirements. It emphasizes the use of M25 concrete, high yield strength deformed bars, and specific clear cover measurements for reinforcement. Additionally, it notes the safe bearing capacity of soil and includes revisions based on client requirements.

Uploaded by

SivarajSiva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES:

1. ALL DIMENSIONS ARE IN FEET & INCHES


2. USE CONCRETE - M25 (DESIGN MIX)
3. MINIMUM CEMENT CONTENT SHALL NOT
BE LESS THAN 340 KG/CU.M FOR M25
4. HIGH YIELD STRENGTH DEFORMED BARS
SCHEDULE OF FOOTINGS
Fe500 CONFIRMING IS 1786-1985 TO BE USED
NAME OF SIZE REINFORCEMENT NO OF
S NO FOOTING 5. NO ADMIXTURES SHALL BE ADDED
Lx X Lz d d1 D SHORT DIRECTION LONG DIRECTION FOOTING
WITHOUT PERMISSION OF CONSULTANT.
01 F1 7-6" x 7'-6" 10" 24" 8'-2" 12# @ 6" C/C 12# @ 6" C/C 1 6. CLEAR COVER TO THE REINFORCEMENT
FOR FOOTING: 50MM, COLUMN 40MM ,BEAM
02 F2 6'-9" x 6'-9" 10" 22" 8'-2" 12# @ 6" C/C 12# @ 6" C/C 2 30MM, SLAB 25MM.
7. DEVELOPMENT LENGTH OF BAR Ld AS 50Ø,
03 F3 5'-9" x 5'-9" 10" 20" 8'-2" 10# @ 6" C/C 10# @ 6" C/C 3
WHERE Ø = DIA OF BAR.
04 F4 5'-0" x 5'-0" 10" 17" 8'-2" 10# @ 6" C/C 10# @ 6" C/C 4 8. STRUCTURE IS DESIGNED FOR STILT + 3
FLOORS.
05 CF-1 12'-5" x 10'-10" 10" 20" 8'-2" 12# @ 6" C/C* 12# @ 6" C/C* 1 9. THE SAFE BEARING CAPACITY OF SOIL IS
TAKEN AS 212 kN/M2 AT 2.5 M DEPTH.

*REINFORCEMENT ON BOTH TOP AND BOTTOM FOR CF-1

R.C.C WALL

R.C.C WALL
9" THK.

R.C.C COLUMN

REINFORCEMENT ALONG
LONG DIRECTION

REINFORCEMENT
ALONG
SHORT DIRECTION

PLAN OF ISOLATED FOOTING PLAN OF LIFT FOOTING 2 21.06.2021


CHANGES IN COLUMN POSITIONS AS PER CLIENT
REQUIREMENT NKR
(CF-1) CHANGES IN FOOTING SIZE AS PER CLIENT
1 17.06.2021 REQUIREMENT NKR
BRICK WALL
0 15.06.2021 N/A NKR
PLINTH BEAM PLINTH BEAM
GL GL
PLINTH BEAM REV. DATE DESCRIPTION BY

12 @ 6" C/C
ISSUED FOR CONSTRUCTION
R.C.C COLUMN
R.C.C WALL
9" THK. PROJECT

PROPOSED STILT+3 RESIDENTIAL BUILDING


COLUMN REINFORCEMENT
8/10 mm TIES AT 6" C/C LOCATION:
10 @ 6" C/C PLOT NO: 15, DOOR NO: 26/10,
REINFORCEMENT ALONG REFER SCHEDULE
LONG DIRECTION THILLAI GANGA NAGAR, 17TH STREET,
NANGANALLUR, CHENNAI - 600 061.
REINFORCEMENT ALONG
SHORT DIRECTION
CLIENT:
Ms. MADURAM KRISHNAMURTHY
4" THK PCC 4" THK PCC
4" THK M-SAND 4" THK M-SAND DATE: JOB NO.:
21.06.21 04/ 2021
TITLE:
FOUNDATION LAYOUT &
C.S OF LIFT FOOTING REINFORCEMENT DETAILS
C.S OF ISOLATED FOOTING
(CF-1) DRAWING NO.:
02
SCALE:
NTS
DRAWN BY: DESIGNED BY: CHECKED BY:
M.S M.N.D N.K.R
REVISION
2

SHREE CONSULTANTS