0% found this document useful (0 votes)
25 views

Sample VCB Test Report Format

The VCB Maintenance and Testing Report details the testing of an ABB HPA 12/2040C vacuum circuit breaker conducted on April 13, 2024, with the next test scheduled for April 12, 2025. The report confirms that the circuit breaker passed all functional and operational checks, with no damage found and successful completion of maintenance tasks such as cleaning and lubrication. All test results, including insulation resistance and contact resistance, indicate that the breaker is in good condition.

Uploaded by

reltecempmails
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views

Sample VCB Test Report Format

The VCB Maintenance and Testing Report details the testing of an ABB HPA 12/2040C vacuum circuit breaker conducted on April 13, 2024, with the next test scheduled for April 12, 2025. The report confirms that the circuit breaker passed all functional and operational checks, with no damage found and successful completion of maintenance tasks such as cleaning and lubrication. All test results, including insulation resistance and contact resistance, indicate that the breaker is in good condition.

Uploaded by

reltecempmails
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

VCB Maintenance and Testing Report

No.254/5, 3rd Main Road, Mahalaksmi Layout, Bangalore -560086, Mob : 9448040046, 9964441111

Certificate No RLC25/BLR/SR/22/19- Page No 1 of 2


Test Date 13/04/2024 Next Test Date 12/04/2025
Name of the Project
Location 11KV Switch Board Room
System
Spare

Test Certificate For VCB( Vaccum Circuit Breaker)


1.0.Name Plate:
Make ABB
Type HPA 12/2040C
Rated Volt 12KV
Rated Current 2000A
Short Circuit Breaking Current 40KA
Short Circuit Making Current 100KA
Closing Coil Volt 110V.DC
Opening Coil Volt 110V.DC
Frequency 50Hz
Motor Supply 110V.DC
Sl. No. S19784

2.0. Service Check :


Description Observation Report
Spring Charging Motor Resistance 230V.AC/ 28.1 Ohm
Closing Coil Voltage and Resistance 110V.DC/ 62.1 Ohm
Tripping Coil Voltage and Resistance 110V.DC/ 62.1 Ohm
Counter Reading/Anti pumping(K1) 332
Visual Inspection for Damage No Damage Found
Replacement
Thorough Cleaning Yes Done Thoroughly with CRC and Cotten Cloth
Lubrication of Moving Parts /Coil Yes Done Isoflex Topaz Grease & Shell Tells 32 Oil
Gap /Travel by Gauge -Vernier Before Servicing After Servicing
Roller Gap = 1mm Roller Gap = 1mm
Damper Gap = 4mm Damper Gap = 4mm
Torque Contact ARM = 20NM VI Fixing = 40NM
ON/OFF Operation 10 Operation Done Electrical & Mechanically

a. Operation checks :
Description Manual Electrical
Close OK OK
Open OK OK
b. Functional Checks :
Description Remote
Trip / Trip circuit healthy Lamp Indication Checked and Found OK
Limit Switch for spring charge motor Checked and Found OK
Test / Service Limit Switch Checked and Found OK
Operation Counter Checked and Found OK
Function of illumination socket Switch Checked and Found OK
Spring Charging both by manual & through motor Checked and Found OK
Check for completeness of Installations Checked and Found OK
Vaccum Checking Checked and Found OK
VCB Maintenance and Testing Report

No.254/5, 3rd Main Road, Mahalaksmi Layout, Bangalore -560086, Mob : 9448040046, 9964441111
Rack In/Out Checking Checked and Found OK
Drive Mechanism Checked and Found OK
Checking CB/Door Interlock Checked and Found OK

3.0. Contact Resistance Test (In micro Ohms):


Phase Resistance Measured Current Injected In(A.DC)
R 46.1 100.4
Y 47.5 100.4
B 48.0 100.4
4.0. Insulation Resistance Test:
Description : R Y B
Breaker in Closed Condition
IR Value between top to Ground 150.1 GΩ 149.5 GΩ 193.1 GΩ
IR Value between Phase to Phase 425.1 GΩ 720.5 GΩ 549.2 GΩ
Breaker in Open Condition
IR Value between Pole to Pole 316 GΩ 325 GΩ 370 GΩ

5.0. Breaker Timings Test (In milli Sec):


Phase R Y B
Closing Time 51 51 52
Opening Time 39 41 40
Close-Open 46 45 47

6.0. Status:
Status
Tested Good

Test by REPL Witnessed by JPL Certified by JPL