The document serves as a practical guide for the service validation and testing practice within ITIL 4, detailing its purpose, processes, and the roles of organizations and technology involved. It emphasizes the importance of ensuring that products and services meet defined requirements through effective testing strategies, risk management, and collaboration among teams. Additionally, it highlights the need for continual validation and testing throughout the entire service lifecycle to enhance quality and performance.

Uploaded by

gmc7m9fxns
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Service Validation and Testing

The document serves as a practical guide for the service validation and testing practice within ITIL 4, detailing its purpose, processes, and the roles of organizations and technology involved. It emphasizes the importance of ensuring that products and services meet defined requirements through effective testing strategies, risk management, and collaboration among teams. Additionally, it highlights the need for continual validation and testing throughout the entire service lifecycle to enhance quality and performance.

Uploaded by

gmc7m9fxns
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Home Resources CPD Badges Events Help Dinesh Peter

January 11, 2020 43 min read

ITIL ITIL4 Practice Guides

Service validation and testing: ITIL 4 Practice Guide

44 Likes

This document provides practical guidance for the service validation and testing practice.

Table of Contents

1. About this document 4. Organizations and people 7. Important reminder

2. General information 5. Information and technology 8. Acknowledgements

3. Value Streams and processes 6. Partners and suppliers

1. About this document

It is split into five main sections, covering:

general information about the practice

the practice’s processes and activities and their roles in the service value chain

the organizations and people involved in the practice

the information and technology supporting the practice

considerations for partners and suppliers for the practice.

1.1 ITIL® 4 qualification scheme

Selected content from this document is examinable as a part of the following syllabuses:

ITIL Specialist Create, Deliver and Support

ITIL Specialist High Velocity IT.

Please refer to the respective syllabus documents for details.

2. General information

2.1 Purpose and description

Key message

The purpose of the service validation and testing practice is to ensure that new or changed products and services meet
defined requirements. The definition of service value is based on input from customers, business objectives, and regulatory
requirements and is documented as part of the design and transition value chain activity. These inputs are used to establish
measurable quality and performance indicators that support the definition of assurance criteria and testing requirements.

The service validation and testing practice involves reducing the risks and uncertainties that new or changed products and services introduce
to the live environment. The practice does this by planning and performing appropriate tests.

The larger and more complex a system is, the more testing is required. However, exhaustive testing, even of smaller, simple systems, is typically
impossible due to time and cost constraints. Therefore, choosing what to test is important. The key considerations when defining the scope
and level of validation and testing are the:

agreed requirements that a product or service must meet

impact and likelihood of deviations from the agreed requirements.

Understanding the requirements in the context of the likelihood and impact of deviations facilitates an informed perspective of the important
areas to test.

This practice is about being confident in the quality of service being tested. This is not the same as saying that it is flawless. Confidence is
earned through testing in order to demonstrate that the service will perform as required, meets the requirements, and has no significant
defects.

2.1.1 Service validation

Service validation is performed in the earlier stages of the product and service lifecycle (ideation and design). It is focused on confirming that
the proposed service design meets agreed service requirements and on establishing acceptance criteria for the next stages (development,
deployment, and release). These criteria will then be verified by testing the product and service components, products, and services.

Validation follows the structure of service requirements and usually covers utility, warranty, experience, manageability, and compliance. Other
requirements may also be included.

Service validation ensures the definition, verification, and documentation of service acceptance criteria and informs the scope and focus of
testing activities.

2.1.2 Testing

Based on the criteria identified through service validation, test strategies and test plans are developed and implemented.

A test strategy defines an overall approach to testing. Test strategies can apply to environments, platforms, sets of services, or individual
products or services. The product and service lifecycle stages that are covered by testing may differ between products and services developed
within the organization and those obtained from a supplier.

The service validation and testing practice has been greatly impacted by changes in the architecture management, software development and
management, project management, and infrastructure and platform management practices. Agile methods, the digitization of IT
infrastructure, service-oriented architecture, and the automation of software development and management have introduced new challenges
and opportunities to the service validation and testing practice. To meet today’s requirements, service validation and testing should be faster,
more flexible, and continually evolving. This is only possible if the practice is closely integrated with the practices mentioned above and others,
including the release management, deployment management, incident, and problem management practices.

Effective validation and testing are based on close collaboration between testers, developers, and operations teams, alongside enhanced
tooling and automation approaches.

Another important trend is expanding validation and testing beyond the technical aspects of products and services to include user experience
and perception.

Traditionally, service testing was the act of confirming expectations relating to explicit requirements by checking the expectations on how the
software should or should not work, based on prior knowledge that is defined through requirement specifications. Today, testing also involves
exploring and uncovering information about unexpected things, such as product risks and variables regarding:

software

ideas for software solutions

artefacts created from the ideas

user experience and user interface designs

models and wireframes

architecture and code designs

code

tooling

processes.

2.2 Terms and concepts

2.2.1 Risk-based testing

Risk-based testing is a common term within the testing industry. Typically, people understand risk- based testing to mean testing (particularly
explorative testing) that is structured and driven by different types of product risks relating to the features and product components that are
being tested.

The focusing on risk is beneficial because it highlights how the service might fail. This can then be investigated to uncover information about
the software and its quality.

Commonly within software testing, people focus on types of testing. Examples of types of testing include functional, regression, performance,
security, usability, cross-browser, accessibility, end to end, and integration testing. These types of testing focus on different types of risk. For
example, functional testing focuses on functional risks and regression testing focuses on the risks of the software regressing.

Although they tend to consider ten to fifteen types of testing, many teams only include between five and eight types of testing in their test
strategies. Because of this, and because there are many types of product risks affecting services that are rarely associated with a type of testing,
a focus on risk-based testing is important.

2.2.1.1 Discovering Risks

Service validation and testing practice activities that identify product risks are as important and valuable as activities that confirm that risks
have been effectively addressed.

Service validation and testing activities that are conducted in the early stages of the product lifecycle output information about product risks,
variables, unknowns, and so on. Contrastingly, testing activities that are conducted in the later stages of the product lifecycle uncover problems
and other information about the actuals of the service, to which the organization can then respond. Even when services are operational,
organizations should continue to uncover information about risks, variables, and unknowns. That feedback continues, but stems longer
feedback loops back into the ideas, user stories, and designs.

For example, in software development, it is extremely rare for agile user story artefacts and acceptance criteria artefacts to focus on product
risks. The text within these artefacts usually relates to general expectations regarding functionality or the interconnectivity of the software. It is
important to identify risks relating to the user story as acceptance criteria are being defined.

After identification, risks should be captured. Mind maps are a common tool for this because they create a risk map that is accessible,
lightweight, readable, and ready to be used throughout the product lifecycle service design activities and explorative testing at the later stages.

Identifying different kinds of product risks can be difficult, but there are ways to structure acceptance criteria and testing activities that
improve the chances of success, such as:

Consider the object of testing on a holistic level, then granularly, including the tangible and intangible artefacts. Actively consider the
product's, service's, or component's:

potential purposes

properties

kinds of users

integrated parts

architecture

etc.

Explore the variables of each of those aspects.

Identify and discuss product risks relating to the variables. Examples of risks that could be identified include:

accessibility risks

availability risks

charisma/likeability risks

compatibility risks

environment integration risks

functional risks

interface risks

localization risks

maintainability risks

observability risks

performance risks

portability risks

reliability risks

responsiveness risks

scalability risks

security risks

stability risks

testability risks

usability risks.

Assess the risks and decide whether to invest further time and effort in mitigating or testing it. For more information on this topic, refer to
the risk management practice guide.

For significant risks, create a risk map. Risk maps are artefacts for service designers and developers. They also help to stem the test
charters, which involves structuring exploratory testing by testing for specific risks in specific areas.

2.2.2 Testing in different environments

A risk-based approach is also helpful regarding test environments and deciding where to test.

Many risks can be tested for in a development environment. Development environments offer very quick feedback cycles because it is usually
possible to quickly write code and use it to test for many kinds of product risks and then refactor the code if needed. However, certain risks
cannot be tested for in a development environment; they might need a more stringently-integrated environment, such as a dedicated test
environment.

Using a dedicated test environment is arguably slower because time is needed to create the environment and if any problems are discovered
the feedback loop is longer in refactoring code, retesting in a development environment, then merging the fixes back in to the test
environment again. Repeating tests that were completed in the development environment is unnecessary but testing for risks that could not
be tested for in the development environment might be necessary.

Sometimes, having a pre-release environment (a staging environment) is sensible. Some risks may only be testable in a shared test
environment, such as risks relating to data flows, platform risks, or some integration risks.

Finally, some risks are only testable in the real production environment.

Figure 2.1 represents the environments in which the majority of tests are performed.

Figure 2.1 Testing triangle

Most risks can be tested for early, in a development environment. Most of those remaining can be tested for in an in-team test environment.
Most of those remaining can be tested for in a staging environment. Those remaining can be tested for in the production environment.

2.2.3 Assertive (scripted) and exploratory (investigative) testing

Testing provides information for decision-making in regard to a product or a service. Information is either known or unknown.

There are two states of known information:

explicit information

tacit information.

There are two states of unknown information:

information that is known to exist, but which has not been accessed

information that is not known to exist.

For further details on types of information and the related practical implications, refer to the knowledge management practice guide.

Based on the different states of information, there are two perspectives regarding software testing:

Assertive (or scripted) testing aims to verify that a component, product, or service meets pre- defined criteria that are based on agreed
requirements.

Exploratory (or investigative) testing aims to uncover unknown information about a service component, product, service, or environment
in order to identify risks that have not been addressed by pre-defined criteria.

The two approaches should be combined and balanced; adherence to one alone decreases the quality of information about products and
services, which may lead to sub-optimal management decisions. Figure 2.2 illustrates how testing influences the information available.

Figure 2.2 Testing helps to confirm and uncover information

2.2.3.1 Assertive testing approach

Assertive testing confirms whether explicit expectations on how a service should be designed, developed, and performed are being met.

This type of testing relies on explicitly expressed and documented expectations (usually in the form of the acceptance criteria). It also requires
the tested artefact to be created.

Assertive testing can be performed manually or automated, depending on what is being tested and whether the organization has the required
tools. Either way, assertive testing is based on documented test scripts that describe acceptance criteria, testing manipulations, and pass/fail
criteria in a human or programming language. Automated testing is common for software and digital infrastructure, but it can be applied to
other aspect of services, including controls, communications, system integrations, and interactions with users.

Assertive testing is limited by its nature: it can only be used to reduce known and documented risks in a limited spectrum of circumstances. It
is also limited by the testing strategy for the product or service being tested; some known risks may be omitted to provide sufficient, not
exhaustive, assurance.

2.2.3.2 Exploratory testing approach

Exploratory testing is based on investigating unknowns within a product, service, or environment with the intent of uncovering information
that is relevant to the perceived quality and value of the services. It relies on lateral and critical thinking skills and is often based on the
exploration of possible product vulnerabilities and associated threats.

Exploratory testing is commonly misunderstood to be ad hoc and unstructured. Actually, it is structured through small testing missions, known
as test charters, which focus testing on targeted areas to investigate specific product risks.

This approach is essential in the context of agile development and the constantly growing complexity of information and organizational
systems. It enables fast learning and feedback loops throughout the product and service lifecycle, which enables products’ and services’
continual improvement.

2.2.4 Continual validation and testing

The service validation and testing practice is not just about testing a releasable, operational product or service. These activities should be
conducted throughout the entire service lifecycle, as was shown in Figure 2.2.

Validation and testing activities create important feedback loops, which inform every step of a digital product lifecycle, as Table 2.1 outlines.

Table 2.1 Validation and testing throughout a digital product lifecycle

Digital product lifecycle Validation Assertive testing Exploratory testing


phase and associated
artefacts

Ideas - - Exploration of the ideas


and their relevance to
customer’s and
organization’s needs

Epics, user stories, Validation of epics, user stories, - Exploration of epics, user
features, enablers, and so and stories, and features to
on features/enablers, development identify inconsistencies
of acceptance criteria for UX/UI and missed opportunities
designs and architecture and
code designs

UX/UI designs Validation of the designs to Testing of the UX/UI Exploration of the UX/UI
confirm that they are based on wireframes to confirm that wireframes to identify
the epics, user stories, and they meet architecture and inconsistencies and
features and that they match design policies and missed opportunities
the defined criteria guidelines, if applicable
Definition or update of
architecture and code design
acceptance criteria

Architecture and code Validation of the designs to Testing of the architecture Exploration of the
design confirm that they are based on and code design artefacts architecture and code
the epics, user stories, and to confirm that they meet design artefacts to
features and match the architecture and design identify inconsistencies
defined criteria policies and guidelines, if and missed opportunities
Development of acceptance applicable
criteria for the code

Code units Validation of the code to Automated, sometimes Peer review, pair
confirm that it was developed manual, unit testing to programming, and other
based on the agreed design, is confirm that each unit exploratory testing to
complete, and adheres to performs as designed identify errors and
agreed architecture standards based on the agreed opportunities that have
Update of acceptance criteria criteria not been covered by the
for operational software acceptance criteria

Operational software Validation of the software to Automated and sometimes Review and exploration of
confirm that it is complete, manual unit testing to the software to identify
based on the agreed criteria, confirm that the software errors and opportunities
and adheres to agreed performs as designed, that have not been
architecture standards based on the agreed covered by the
Development and update of criteria acceptance criteria
acceptance criteria for
deployment and release

Deployment and release Validation of the deployment Automated and sometimes Exploration of the pipeline
pipeline and release tools, processes, manual testing of the tools and processes to
and methods to confirm that pipeline tools and identify errors and
they meet agreed processes to confirm that opportunities that have
requirements and follow the they work as agreed not been covered by the
applicable policies and acceptance criteria
guidelines
Update of acceptance criteria
for deployment and release

Software deployment Validation of completeness and Automated testing of the Exploration of the
correctness of the deployment deployed artefacts to deployed artefacts and
Update of the release confirm that they meet the environments to identify
acceptance criteria and agreed acceptance criteria errors and opportunities
regression testing criteria that have not been
covered by the
acceptance criteria

Service release Validation of the released Automated and manual Exploration of the
service to confirm that it is testing of the service released service to
complete and fits the agreed operation, including user identify errors and
design specifications acceptance testing opportunities that have
Update of the live service not been covered by the
validation criteria acceptance criteria

Service in operation Validation of service quality Regression testing to Chaos engineering to


(utility, warranty, and confirm that previous test explore service
experience levels) based on results are still valid vulnerabilities and other
agreed criteria and service level errors and opportunities
management information. that have not been
covered by the
acceptance criteria and
formal service quality
controls

2.3 Scope

The scope of the service validation and testing practice includes:

translating the requirements for products or services into deployment and release management acceptance criteria

establishing test approaches and defining test plans for new or changed products and services

eliminating risk and uncertainty of new or changed products and services by testing

discovering new information about new or changed products and services by testing

continually reviewing test approaches and methods to improve the efficiency of the tests.

There are a number of activities and areas of responsibility that are not included in the service validation and testing practice, although they are
still closely related to service validation and testing. These are listed in Table 2.2, along with references to the practices in which they can be
found. It is important to remember that ITIL practices are merely collections of tools to use in the context of value streams; they should be
combined as necessary, depending on the situation.

Table 2.2 Activities related to the service validation and testing practice described in other
practice guides

Activity Practice guide

Establishing detailed requirements for the utility and warranty of the new or changed Business analysis
product or service
Analysing new requirements for services outside of existing utility and warranty
options

Maintaining financial control over testing Defining a testing budget Financial management

Developing and managing software Software development and


management

Developing and managing infrastructure Infrastructure and platform


management
Operational communications with users and feedback gathering Service desk

Deploying services and components Deployment management

Releasing services Release management

Ongoing management and implementation of improvements Continual improvement

2.4 Practice success factors

Practice success factor

A complex functional component of a practice that is required for the practice to fulfil its purpose.

A practice success factor (PSF) is more than a task or activity, as it includes components of all four dimensions of service management. The
nature of the activities and resources of PSFs within a practice may differ, but together they ensure that the practice is effective.

The service validation and testing practice includes the following PSFs:

defining and agreeing an approach to the validation and testing of the organization's products, services, and components in line with the
organization's requirements for speed and quality of service changes

ensuring that new and changed components, products, and services meet agreed criteria

2.4.1 Defining and agreeing approaches to the validation and testing of the organization's
products, services, and components in line with the organization's requirements for speed and
quality of service changes

Service validation should establish an approach to capture all of the utility and warranty requirements for any product, services, and
components. This approach should involve different stakeholders and sources of information from the stakeholders, such as customer and user
requirements and feedback, business requirements, internal and external compliance and regulatory requirements, risk and security, and
other sources of requirements. This approach should also propose methods of translating requirements into acceptance criteria for the service.

A test strategy defines how testing should be implemented, considering the project’s objectives. Test planning should be based on the test
strategy. The test strategy also defines the test management approach, including how testing will be organized and controlled.

The test strategy defines the test phases (or levels) and types that are in scope.

The testing phases include:

Unit Undertaken by the developers to verify that what they have developed meets the requirements. A unit is typically a component of
the overall system that is tested in isolation.

Integration Undertaken when development is complete enough to start integrating different systems, concerned with the testing of the
integration between systems.

System Undertaken when it has been verified that the system’s components can be integrated, system testing considers the end-to-end
functionality of the system.

Acceptance User acceptance testing (UAT) is the formal test phase where end users verify and validate that what is to be delivered meets
their requirements.

In each of these test phases, the test strategy must consider which test types are appropriate.

Test types include:

Functional Testing what the system being delivered will do.

Non-functional Testing the aspects of the system that are not directly related to its functional requirements. Common non-functional
aspects are:

Performance Behaviour under normal conditions.

Load Behaviour with increasing load.

Stress Behaviour when approaching the upper operational limits.

Security Authorization and authentication system controls.

Usability How well the users of the system can engage with the system.

Regression New developments (progression) and bug fixes (debugging) can introduce unexpected system behaviour. Regression testing
aims to verify that the system still functions as required following change.

Test plans define the detailed activities, estimates, and schedules for each test phase. Therefore, the test strategy defines the overall scope and
approach, whereas the test plans detail each of the test phases. This is outlined in Table 2.3.

Table 2.3 Test strategy

Test strategy

Types/levels Unit Integration System UAT

Functional/Non-functional Unit test plan Integration test plan System test plan UAT test plan
Regression

2.4.2 Ensuring that new and changed components, products, and services meet agreed criteria

No two projects are the same, and test strategies must be appropriate for the relevant project and organizational structure. Each test strategy
should aim to:

achieve the optimum test coverage in the time available by balancing effectiveness with efficiency

be pragmatic and suit the needs of the programme, available resources, and available skills

be aligned to the development methodology, technologies being employed, and the nature of the system being developed

establish a high level of confidence in the delivery of software as early as possible

confirm the accuracy of the software that is delivered (functional attributes)

mitigate the level of business risk associated with implementing new software

continue to improve and optimize the test process as the project unfolds

identify test related risks, issues, and areas that are vulnerable and provide appropriate recommendations.

To achieve this, the test strategy needs to address:

test organization

test planning and control

test analysis and design

test preparation and implementation

test progress and reporting

incident management

test closure and exit criteria.

The test strategy must consider the development methodology being employed. A waterfall development model often allows for the early
static testing and validation of captured user requirements. A more iterative methodology may not deliver fully-formed user requirements
before coding starts. The test strategy needs to be appropriate.

The test strategy must also consider the type of system/service involved. For example, testing a finance system at year-end requires a very
different approach than testing an ecommerce website. It is important to consider the fundamentals of the testing environment: the
processes, systems, resources, and management required to validate quality.

Testing is not limited to software artefacts; data migration, training, operational readiness, release management, and reporting are other areas
that require specific testing attention.

2.4.2.1 Test organization

Those that test the system should be independent of those that develop the system. The mindset of a tester and a developer are different.
Developers typically aim to prove that what they have

developed meets requirements: testers aim to prove that requirements have been meet and that no other issues have been introduced.

The test organization should encourage this separation to improve the effectiveness of the testing. The roles and responsibilities of those
involved in the testing should be clearly defined, including the test management and test analyst roles, as well as supporting roles involving
incident management, configuration management, change control, deployment, and release.

2.4.2.2 Test planning and control

If the software development lifecycle follows a sprint-based methodology, testing should be involved in sprint planning. Each sprint should
deliver artefacts that are testable, even if that requires the use of stubs and drivers, which should then be in the sprint scope.

Releases made available to testing consist of progression payloads (things that are new) and regression impacts (things that need testing to
validate that they continue to function as required).

In terms of progression and regression, the threats to any release typically comprise of:

New functionality being introduced to meet a requirement (progression and regression threat). This threat originates from the existing
project.

Bug fixes to new functionality (progression and regression threat). This threat originates from the existing project.

Hotfixes to a production service (regression threat). This threat originates from the production service provider(s).

Maintenance releases for a production service (regression threat). This threat originates from the production service provider(s).

2.4.2.3 Test analysis and design

Reporting on test progress only in terms of the percentage of overall coverage does not support informed risk assessment. To report on test
progress in a meaningful way, testing should be aligned to the programme deliverables and requirements.

Each release to testing includes a payload. The payload can be divided into payload elements (PE). Each PE has a discrete test pack that is
reported on.

For example, in a web-based order entry system, the programme schedule has defined a sprint to:

PE 1: deliver the customer short code lookup facility (a progression deliverable with a regression impact)

PE 2: allow payments to be made via credit card (a progression deliverable with a regression impact)

PE 3: deliver the total order value as an automatically updated field on the order entry web page, thus replacing the need for the user to
manually use the ‘calculate order total’ function (a progression deliverable with a regression impact)

PE 4: up to ten development hours of bug fixes to be delivered in this sprint for open bugs from previous sprints (a progression and
regression deliverable).

Testing has reviewed the programme schedule, obtained copies of the requirements and functional design documentation, and estimated
that 45 test cases are required to cover all of the sprint’s progression deliverables. Additionally, when considering the regression risk of the
sprint, testing identified a further 25 test cases that should be run as the sprint developments impacted the system’s core functionality.

This gives a total test pack size of 70 test cases if testing is planned for one functional test phase with two three-day cycles.

Reporting during the first test cycle might state that 80% of test cases have been run and passed by the end of the second day. However, this
cannot be considered a good result without confirming which tests have been run and which are still to be run. Running and successfully
passing all of the regression tests would indicate that the sprint introduced no regression issues.

Testing functionalities and recording successful results but not performing regression tests leads to high confidence in the new developments
but does not indicate that the system has not been compromised. It is important to consider addressing the PEs and reporting on them
upfront.

In the above example, knowing that there was one day left for testing in the schedule, ten regression tests outstanding, and five progression
tests outstanding would inform the focus of the remaining test efforts.

To further subdivide regression tests, practitioners can consider the core functions of the system under test and define focus areas. Order entry
could be one focus area, customer billing could be another. By categorizing regression testing across focus areas, a better assessment of
outstanding test risk can be made.

2.4.2.4 Phases and cycles

Having defined the required test scope, practitioners can consider the test schedule by PEs and focus areas. Testing should begin as soon as
the deployment and release activities to the test environment have been completed. It is important to consider the order in which the PEs and
focus areas will be tested. The default should be to test the most complex or the newest developments, which are generally the highest risk, as
soon as possible.

Having identified the testing scope estimation to test execution duration is required and given the defects impact test execution, defect rates
needs to also be estimated and factored into a test execution schedule.

Planning the testing of a new system can be difficult; it is important to plan based on estimations of the outcomes and, as the system is
iteratively tested, these estimates can be refined.

It may be useful to express the impact of defects in terms of test cases.

Example:

The next release of the latest sales order processing system has been analysed by the test team. Analysis of the PEs and focus areas has been
completed. 172 test cases have been identified to cover the PEs, but the standard regression pack of 150 test cases and any additional 60
regression tests due to the nature of the PEs has been scoped, giving a total regression pack size of 210 test cases. In this example, regression
tests are run manually.

At test planning, it is assumed that 20% of all PEs (34) and 10% of regression tests (21) will result in a defect.

Not all defects are equal; some are complex to triage and fix, and others are trivial. Defects are assumptively categorized as complex, standard,
or trivial and assigned an amount of time that it should take to be resolved.

Table 2.4 outlines the information for an estimated defect total of 55.

Table 2.4 Example defect information

Categorization Fix Rate % assumed Assumed defects Weighting factor Adjusted total

Complex 3 days 50 27 (50% of 55) 2 54 (27 * 2)

Standard 2 days 30 17 (30% of 55) 1.5 26 ( 17 * 1.5)

Trivial 1 day 20 11 (20% of 55) 1 11 ( 11 * 1)

Total . . . . 91

A weighting factor can be used to adjust for the complexity of some defects. The adjusted total can be treated as additional test cases to be
executed. Adding these to the test case scope builds in an allowance for defect fixing.

Assumptions regarding how long it will take a tester to run a test are required for test execution planning.

Working on the basis of ‘tests per tester per day’ (TPTPD) can be useful. As with defect estimation, not all tests are equal: some taking longer to
run than others.

Table 2.5 outlines the test case information based on the example test scope of 382 test cases (172 PEs and 210 focus areas).

Table 2.5 Results for the example 382 test cases

TPTPD % assumption Number of test cases Test duration for one tester

5 40% 153 31 days

3 35% 134 45 days

1 25% 96 96 days

Table 2.5 shows an allowance in the estimation of the duration of testing for full coverage. Including additional testers or scope reductions will
reduce the test duration.

In the above examples, PEs and focus areas have been treated equally. Greater precision can be achieved by estimating these separately.

The test schedule should be organized by phase and into one or more cycles. Each cycle has a clear definition of the PEs and focus areas in
scope for testing, with the highest risk generally tested first.

A 3-cycle approach for larger test phases is common. Table 2.6 outlines a 3-cycle approach.

Table 2.6 3-cycle test phase

Cycle 1 Cycle 2 Cycle 3 Final Test Cycle – FTC)

High risk/priority PE’s Lower priority PEs Final fixes

High priority focus areas Lower priority focus areas Prioritized focus area clean run

. Fixes from Cycle 1 Prioritized PE backlog

. Backlog from Cycle 1 .

2.4.2.5 Test preparation and execution

Planning for test execution can be a significant undertaking. Many factors need to be anticipated so that test execution can progress. Factors
such as environment(s) provisioning, data creation, user account, and role configuration need to be planned.

A plan schedules the activities of and defines the roles and responsibilities for the test preparation phase. Daily stand-ups to monitor progress
can be useful. Test preparation should be approached as a project in its own right, needing the usual project management techniques to
ensure success.

Before test execution can begin, an agreed number of environment and system validation tests need to be successfully run. In addition,
prepared test data should be closely guarded; it is often time consuming to generate test data. Data that has been created should only be used
when the system under test can support the testing scope.

When test execution has started, it is important to ensure that momentum is maintained. Often, the initial stages of testing identify blockers;
this should be anticipated. The appropriate resolver groups should be on standby with enhanced support to resolve early issues quickly. Often,
resolver groups can remain occupied, such as by supporting ongoing development efforts for the next release of the system, while they are on
standby.

Typically, the biggest threats to testing are incidents. To ensure focus is kept on the test execution, it should be the defect manager’s
responsibility to ensure that defects are resolved quickly and prioritized to support test execution progress.

As part of the defect management process, a clear definition of severity and priority is required. Severity, to measure the impact of the defect
on the ability to release the system. Priority, to support the testing schedule. It is important to remember, though, that critical-severity defects
are not necessarily highest priority.

If development are using a sprint approach, a number of hours per sprint could be allocated to test defect debugging (resolver group resources
could be allocated to support testing). The testing defect manager should ensure that defects are debugged, fixed, and deployed for re-testing
to support the test execution schedule.

The testing defect manager should monitor KPI’s, such as the number of defects identified in the release, in order to identify areas where
additional training and support may be required. KPI’s focus on areas that have to potential to maximize improvement.

2.4.2.6 Evaluating exit criteria and reporting

Crucially, practitioners should know when to stop testing.

The exit criteria defined as part of the test analysis and design phase are used to identify when the system being tested is good enough. Test
reports will reference the exit criteria and project an outcome, such as whether the test will finish on time. If the report indicates an issue,
corrective action is required. Considering the test execution in terms of the PEs and focus areas is useful. In this way, reporting enables a more
insightful view on the risk being carried.

If the same focus areas feature repeatedly in the regression testing for regular releases, normalizing their test execution schedules and
comparing the progress of the test execution in this release to the last X releases clearly indicates the testing’s trajectory.

At a minimum, daily and weekly test status reports detailing test execution coverage and pass/fail rates by PEs and focus areas (regression)
should be required. These reports will provide metrics on the performance of the test capability, such as the actual observed TPTPD, defect
rates by severity, debugging rates, and first-time fix rates and assess the trajectory of test execution.

2.4.2.7 Test closure

Once the final testing has been completed (the exit criteria has been met), test closure can be initiated. Depending on the nature of the
system, this may be triggered at the end of testing. In other cases, this may follow a successful early life support (ELS) or hypercare phase
following deployment and release. Often, key test resources are retained during a pre-defined ELS phase while the system stabilizes in the
production environment.

This will involve:

formally releasing resources from test activities and transitioning into business as usual (BAU) operations

archiving and indexing test assets, including test strategies, plans, reports, and scripts

transitioning to BAU will likely require reference to the test assets, especially when considering regression testing packs that the BAU
support operation will need to maintain.

Lessons learned from testing should be captured, including both what did and did not work well. To support the Continual Improvement
Practice, it is important to ensure that lessons learned are incorporated into the test strategy. Detailing which lessons are being
addressed/repeated/not addressed. Those lessons not addressed and/or repeated should be transitioned by default to the next lessons-learned
session.

2.5 Key Metrics

The effectiveness and performance of the ITIL practices should be assessed within the context of the value streams to which each practice
contributes. As with the performance of any tool, the practice’s performance can only be assessed within the context of its application.
However, tools can differ greatly in design and quality, and these differences define a tool’s potential or capability to be effective when used
according to its purpose. Further guidance on metrics, key performance indicators (KPIs), and other techniques that can help with this can be
found in the measurement and reporting practice guide.

Key metrics for the service validation and testing practice are mapped to its PSFs. They can be used as KPIs in the context of value streams to
assess the contribution of the practice to the effectiveness and efficiency of those value streams. Some examples of key metrics are given in
Table 2.7.

Table 2.7 Examples of key metrics for the practice success factors

Practice success factors Key metrics

Defining and agreeing approaches to the validation and testing of the Adherence to the service validation
organization's products, services, and components in line with the organization's and testing approach(es) across the
requirements for speed and quality of service changes organization’s product portfolio
Stakeholders’ satisfaction with chosen
approach(es) to service validation and
testing
Stakeholders’ satisfaction with the
organization’s ability to provide quality
products and services
Customers’ satisfaction with the
products’ and services’ compliance to
requirements

Ensuring that new and changed components, products, and services meet Percentage of products and services
agreed criteria meeting requirements for utility and
warranty
Stakeholders’ satisfaction with the
chosen service validation and testing
models and methods
Stakeholders’ satisfaction with the
organization’s ability to test products
and services
Losses from incidents and problems in
services that are overlooked by testing

Aggregated metric for the practice Service validation and testing


productivity index

The correct aggregation of metrics into complex indicators will make it easier to use the data for the ongoing management of value streams,
and for the periodic assessment and continual improvement of the service validation and testing practice. There is no single best solution.

Metrics will be based on the overall service strategy and priorities of an organization, as well as on the goals of the value streams to which the
practice contributes.

3. Value Streams and processes

3.1 Value stream contribution

Like any other ITIL management practice, the service validation and testing practice contributes to multiple value streams. It is important to
remember that a value stream is never formed from a single practice. The service validation and testing practice combines with other practices
to provide high-quality services to consumers. The main value chain activities to which the practice contributes are:

design and transition

obtain/build.

The contribution of the service validation and testing practice to the service value chain is shown in Figure 3.1.

Figure 3.1 Heat map of the contribution of the service validation and testing practice to value chain activities.

3.2 Processes

Each practice may include one or more processes and activities that may be necessary to fulfil the purpose of that practice.

Process

A set of interrelated or interacting activities that transform inputs into outputs. A process takes one or more defined inputs
and turns them into defined outputs. Processes define the sequence of actions and their dependencies.

Service validation and testing activities form three processes:

testing approach and models management

service validation

performing a test.

3.2.1 Testing approach and models management

This process includes the activities listed in Table 3.1 and transforms the inputs into outputs.

Table 3.1 Inputs, activities, and outputs of the testing approach and models management
process

Key inputs Activities Key outputs

Service models and design Updated release management Testing strategy Test strategy and
approaches and models Release plans definition and review standards
Existing test models, release models Testing standards Test models, including test
Updated release management approaches and models definition and review success criteria)
Test models definition Improvement initiatives
Release plans and review Updated knowledge
management articles

Figure 3.2 shows a workflow diagram of the process.


Figure 3.2 Workflow of the testing approach and models management process

Table 3.2 describes the activities in the testing approach and models management process.

Table 3.2 Sample description of activities in the testing approach and models management
process

Activity Description

Testing A service testing manager defines the testing strategy describing the approaches that a service provider
strategy organization adopts for testing and validation. The strategy establishes the baseline risk appetite of the
definition organization and related testing efforts and resources. The testing strategy should be reviewed regularly to
and ensure the consistent achievement of quality goals.
review

Testing A service testing manager defines standards for various types of tests that are applicable to different products
standards and services along with the standards for recording the test outputs. Compliance to the standards should
definition be monitored across all validation and testing activities.
and
review

Test A service testing manager establishes as-needed repeatable testing models to ensure consistent testing
models approaches for updated products and services. Otherwise, a test model can be produced specifically for a one-
definition off large- scale service introduction in parallel with overall project planning activities.
and
review

3.2.2 Service validation

This process includes the activities listed in Table 3.3 and transforms the inputs into outputs.

Table 3.3 Inputs, activities, and outputs of the service validation process

Key inputs Activities Key outputs

Service design packages Utility and warranty Documenting acceptance Acceptance criteria for a
requirements criteria service
Test strategy and standards Verifying acceptance criteria Service testing scope and
Test models focus
Release plan Service acceptance notice

Figure 3.3 shows a workflow diagram of the process.

Figure 3.3 Workflow of the service validation process

Table 3.4 Sample description of activities in the service validation process

Activity Description

Documenting The service validation specialist establishes in conjunction with the service design practice and business
acceptance analysis practice utility and warranty criteria that need to be tested for and met in order for a service and
criteria its components to pass tests. This activity occurs throughout the design phase of a service solution
delivery.

Verifying A service validation specialist accepts test results and assures stakeholders that acceptance criteria have
acceptance been met after a particular test. This activity occurs throughout the transition phase of a service solution
criteria delivery.

3.2.3 Performing a test

This process includes the activities listed in Table 3.5 and transforms the inputs into outputs.

Table 3.5 Inputs, activities, and outputs of the performing a test process

Key inputs Activities Key outputs

Release models Test planning and preparation Configured testing environment


Test models Test execution Test and exit criteria report
Acceptance criteria Test exit criteria evaluation and reporting Lessons learnt
Testing strategy and standards Test closure

Figure 3.4 shows a workflow diagram of the process.

Figure 3.4 Workflow of the performing a test process

Table 3.6 Sample description of activities in the performing a test process

Activity Description

Test planning A service testing manager reviews the acceptance criteria for the service or product being tested and
and plans environments, personnel, hardware, and other components that are required to perform a test,
preparation using the overall testing strategy, standards, and
applicable models.

Test execution A service testing specialist uses manual or automated tests and observes and records the outputs.

Test exit A service testing specialist reviews the results of a test and concludes whether success (or test exit)
criteria criteria were met.
evaluation and
reporting

Test closure A service testing manager reviews test reports and formally authorizes completion of the test, if required
by the test model.

4. Organizations and people

4.1 Roles, competencies, and responsibilities

The practice guides do not describe the practice management roles such as practice owner, practice lead, or practice coach. They focus instead
on the specialist roles that are specific to each practice. The structure and naming of each role may differ from organization to organization, so
any roles defined in ITIL should not be treated as mandatory, or even recommended.

Remember, roles are not job titles. One person can take on multiple roles and one role can be assigned to multiple people.

Roles are described in the context of processes and activities. Each role is characterized with a competency profile based on the model shown
in Table 4.1.

Table 4.1 Competency codes and profiles

Competence Competency profile (activities and skills)


code

L Leader Decision-making, delegating, overseeing other activities, providing incentives and motivation, and
evaluating outcomes

A Administrator Assigning and prioritizing tasks, record-keeping, ongoing reporting, and initiating basic
improvements

C Coordinator/communicator Coordinating multiple parties, maintaining communication between


stakeholders, and running awareness campaigns

M Methods and techniques expert Designing and implementing work techniques, documenting
procedures, consulting on processes, work analysis, and continual improvement

T Technical expert Providing technical (IT) expertise and conducting expertise- based assignments

Examples of roles involved in service validation and testing practice are listed in Table 4.2, together with the associated competency profiles
and specific skills.

Table 4.2 Examples of roles with responsibility for service validation and testing activities

Activity Responsible roles Competence Specific skills


profile

Testing approach and


models management
process

Testing strategy definition Service testing manager LMTA Strong design-thinking


and review Knowledge of testing methods and
approaches

Testing standards definition Service testing manager LMCA Knowledge of testing approaches and
and review methods.
Communication skills to enable standards
compliance

Test models definition and Service testing manager MTA Knowledge of testing approaches and
review methods

Service validation process

Documenting acceptance Service validation MTC Knowledge of service validation


criteria specialist approaches
Understanding of business requirements

Verifying acceptance criteria Service validation MTC Knowledge of service validation


specialist approaches
Understanding of business requirements

Performing a test process

Test planning and preparation Service testing manager MACT Strong resource planning skills
Ability to plan with conflicting priorities

Test execution Service testing specialist MT Attention to detail


Service user (for UAT) Knowledge of testing methods and
approaches

Test exit criteria evaluation Service testing specialist MT Strong record-keeping skills
and reporting Ability to clearly outline findings

Test closure Service testing manager MTC Ability to align test results with the risk
appetite as outlined in the testing strategy

4.2 Organizational structures and teams

4.2.1 Organizing for service validation and testing

Most service providers maintain a service validation and testing practice to ensure that their risk-based quality assurance approach is
consistent. It is important to consider that testing (or often quality assurance) is the term most readily applicable to the software lifecycle;
service validation is a broader area that includes products and service components beyond software, documentation, and digital infrastructure.
Historically, this means that testing teams and validation teams are different: testing teams focus on application testing, validation teams are
closer to service designers and architects. Both should work within the risk appetite that is outlined in the testing strategy.

4.2.2 Service validation specialist

This role can be fulfilled by service designers or architects to ensure that acceptance criteria, which are founded within the business or are
technical requirements and constraints, are met during the tests, and that updated services and products also comply.

4.2.3 Service testing specialist

This is a core role within the practice, often called a ‘tester’ or a ‘QA engineer’. Their responsibilities include:

conducting tests as defined in the test plans and designs

recording and reporting on test results, including raising bug or incident records for unsuccessful tests

administering test environments and associated resources.

5. Information and technology

5.1 Information exchange

The effectiveness of service validation and testing is based on the quality of the information used. This information includes, but is not limited
to, information about:

testing strategy

testing standards

test models

test plans

test records

test results and reports.

This information may take various forms. The key inputs and outputs of the practice are listed in section 3.

The service validation and testing practice can significantly benefit from automation. Where this is possible and effective, it may involve the
solutions outlined in Table 5.1.

Table 5.1 Automation solutions for service validation and testing activities

Process activity Means of automation Key functionality Impact on the


effectiveness of the
practice

Testing approach and


models management
process

Testing strategy definition and Resource planning tools Communicating the strategy Medium
review Collaboration tools and strategy updates
Analytical and reporting
tools

Testing standards definition Resource planning tools Communicating the standards Medium
and review Collaboration tools and standards’ updates
Knowledge
management tools

Test models definition and Ticketing and workflow Workflow design and tracking High
review tools
Knowledge
management tools

Service validation process

Documenting acceptance Collaboration tools Record-keeping of acceptance Medium


criteria Knowledge criteria
management tools

Verifying acceptance criteria Collaboration tools Record-keeping of acceptance Medium


Knowledge criteria
management tools

Performing a test process

Test planning and preparation Ticketing and workflow Task planning High
tools
Knowledge
management tools

Test execution Automated testing Automation of testing and High


toolset and enabling
environments

Test exit criteria evaluation Ticketing and workflow Processing workflow actions High
and reporting tools Record-keeping
Knowledge
management tools

Test closure Ticketing and workflow Processing workflow actions High


tools

6. Partners and suppliers

Very few services are delivered using only an organization’s own resources. Most, if not all, depend on other services, often provided by third
parties outside the organization (see section 2.4 of ITIL Foundation: ITIL 4 Edition for a model of a service relationship). Relationships and
dependencies introduced by supporting services are described in the ITIL practices for service design, architecture management, and supplier
management.

Commonly, service providers seek external quality assurance and testing capabilities to lessen the bias of testing naturally. Externally-managed
service providers, teams, and individuals offer testing capabilities, services, and products in the software domain as well as in specific non-
functional testing areas. However, a holistic validation of services that are deployed to specific service customers often warrants a service
provider organization to foster an internal service testing and validation practice to ensure the holistic coverage of acceptance criteria during a
service introduction journey.

Where an external commercial service provider manages the service delivery value stream, a customer organization may seek additional
expert service deployment capabilities to ensure that their requirements are being met. The assurance services of external and, most
importantly, independent service validation and testing providers are also available.

Where organizations aim to ensure fast and effective service validation and testing, they usually try to agree close cooperation with their
partners and suppliers, removing formal bureaucratic barriers in communication, collaboration, and decision making (see the supplier
management practice guide for more information).

7. Important reminder

Most of the content of the practice guides should be taken as a suggestion of areas that an organization might consider when establishing and
nurturing their own practices. The practice guides are catalogues of topics that organizations might think about, not a list of answers. When
using the content of the practice guides, organizations should always follow the ITIL guiding principles:

focus on value

start where you are

progress iteratively with feedback

collaborate and promote visibility

think and work holistically

keep it simple and practical

optimize and automate.

More information on the guiding principles and their application can be found in section 4.3 of ITIL Foundation: ITIL 4 Edition.

8. Acknowledgements

AXELOS Ltd is grateful to everyone who has contributed to the development of this guidance. These practice guides incorporate an
unprecedented level of enthusiasm and feedback from across the ITIL community. In particular, AXELOS would like to thank the following:

8.1 Author

Peter Bodman and Dan Ashby,

8.2 Reviewers

Roman Jouravlev and Dinara Adyrbai