0% found this document useful (0 votes)
13 views1 page

avp screen

The document appears to contain technical information regarding a railway system, including various status indicators, platform details, and route initiation indications. It outlines specific measurements and operational statuses for different components of the system. Additionally, it includes references to passenger platforms and goods lines, suggesting a focus on railway infrastructure management.

Uploaded by

Ashish Sada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

avp screen

The document appears to contain technical information regarding a railway system, including various status indicators, platform details, and route initiation indications. It outlines specific measurements and operational statuses for different components of the system. Additionally, it includes references to passenger platforms and goods lines, suggesting a focus on railway infrastructure management.

Uploaded by

Ashish Sada
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

KYOSAN

Sts SSTHORITY3OD.t FARLUREMOIONOwLEDCE


+ DN UP -> ER00NE STATUS SYSTEMFAIL AOoBOWLEDGE VOU COsEMUNJCATION DSCATIONS
SEY

POTNT
BALUNEOOK
STSTEM
ONNNE
ADU
STATUS
BJOU
STATUS
ABHANPUR OPENaosE. FOOR
VDUA
SYSTEK: SYSIF2 SISTEXs
ON OFF ON

DCDCCONVERSERFAL SMR FAL JMERTERFAL TRANSFORER FAL FRBC FAL ATSAYFAL 10CAL SPRLYE

SH15

TS TTAOK VECHNE SToNC


S32mSH)
R. BY29

120m OVER RLUIN UNE SH7


33B
(NO STABLING)338T o 34T L4 04 L4A
120a OVER RUN LINE
L4T1 L4T3 O45A 45AT (NO STABLING)
34/
LUNE NO4 SLZ49.0bm (STR TOSTR) 00PUNE-4 BPACDNCAION

OV12
R BY 29 R BY7 CLE
77AC NDICATION RBY 28
(P-EDR) SAB SAB
318
29ASOR 29 29 INITIATION
CL
o 33AT 13T1 L3 L312 13A TO RAJIM
33
LINE NO3 CSL791ODm (STR TO STR
41AO O 448T
29AT Z9AT UBD (KM-16580)
OVI0 10 C10 ECAVP2A
<-DNUP
SH24(A-D) 4ABICD
<-MNDH/NAYA RAIPUR 1AE/CD R. BY 28 HIGH LEVEL PASSENGER PLATFORM NO.2 (600 X 10.60M) BY 27 R BY 29 CAAVBICD
DN BR. DISTANT
KENDRI (KM-5571) SH25A
UP DISTANT PACN OV3
321 27ASCR 27 INITATION
11
o 3IAT 32AT MITR ML MIT MLLA
DHAMTARI-
<-DN/UP- MLTI 428T
28A 418T O 44AT 27AT 27AT 2T 2AT UD KURUD (KM-2243
UNE NO.2 CSL:754.0Om (STR To STR) -MAIN LINE
BJNITIATÊON OV6
<-DN/UP-->
X BY 28 R. BY 27 R. BY 29 SH26AVe/C ZNEC DN DISTANT
2AB/C
120m OVER RIMITNE C9AVB 9Ã/B
KON LINE EPAC DNCATION
(NO STABLING) SH17
328T o L1T L1 LIT2 L1A AKURUD)
LIT1
43BT
LUNE NO.1 CSL:707.00m (STR TO STR) GOODS LINE- SL:743.0Om (SH TO SH) CLR
-10OP LINE-1 -> A

HIGH LEVEL PASSENGER PLATFORM NO.1 (600 X 10.6OM) H


R BY 2
GOODS SHED OFFCE SH22A/B (RAIL LEVEL) RCC GOODS PLATFORM (700 X 20M.)

S.M OFFICE(E)

ROUTE INITIATION INDICATIONS


ROUTE NITIATION INDICATIONS
2/C7 SH22
1/C1 12/C12/SH12
CRANK HANDLES 3/C3/SH3 SH24

SH20 KEY I KEY OUT KEY IN KEY OUT KEY IN KEY OUT KEY IN 4/CA
KEY OUT KEY IN SH26
KEY OUT KEY IN KEY OUT KEY IN KEY OUT
B/CB/SHB SH2 KEY IN KEY OUT KEY IN KEY OUT KEY IN KEY OUT 5/CS/SHS 27
10/C10/SH10 CH4 CHS 7/C7/SH7
PT, 31A/D PT, 32AVB pT. 33AE PT. 34ANB
CH6 CH7
PT, 41AVB PT. 42ANB CH9
PT, 45A/B pT 47 CH10
PT. 43A/B PT. 44AVB 9IC9SH9
SIP.NO.SIP.SECR.R.AVP.02

You might also like