Schedules New a to D
Schedules New a to D
Technical Schedules
May 2024
National Highway Authority of India Request for Proposal - Bid Documents
SCHEDULE - A
1 The Site
1.1 Site of the Project Highway shall include the land, buildings, structures and road works as
described in Annex-I of this Schedule-A.
1.2 The dates of handing over the Right of Way to the Contractor are specified in Annex-II of
this Schedule-A.
1.3 An inventory of the Site including the land, buildings, structures, road works, trees and any
other immovable property on, or attached to the Site shall be prepared jointly by the
Authority Representative and the Contractor, and such inventory shall form part of the
memorandum referred to in Clause 8.2.1 of this Agreement.
1.4 The alignment plans of the Project Highway are given in Annex-III of Schedule-A which
is minimum requirement and are for guidance only. The proposed plan & profile, locations
of different structures / drains / service road / RE walls, chainages of different structures /
drains / service road / RE walls, length of different structures / drains / service road / RE
walls etc. of the project highway as indicated in the Schedule-A, Schedule-B, Schedule-C
and their Annexures, shall be treated as as minimum requirement. Based on site / design
requirement, the Contractor shall finalise Detailed Project Report (DPR) including plan &
profile of the project highway and submit the same to Authority and its Engineer for
acceptance, before the start of the execution of project.
1.5 The status of the environment clearances obtained or awaited is given in Annex-IV of this
Schedule-A.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-1
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annex-I
(Schedule-A)
1 Site
The Site of the Project Highway comprises existing two lane with paved shoulder section
of National Highway NH-54 commencing from existing km. 170+000 to km. 171+900 of
NH-54 in the State of Punjab. The Site also includes construction of Service Road at
villages of Ratol Rohi, Sekhwan, Kot-Karor Kalan, Kaler and Tehna and construction of
built-up / RCC drains from km. 171+900 to km. 172+499, at villages of Ratol Rohi,
Sekhwan, Kot-Karor Kalan, Kaler and Tehna. The land, carriageway and structures
comprising the site are described below.
2 Terrain
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-2
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
3 Land
The Site of the Project Highway comprises the land described below:
4 Carriageway
The existing carriageway of the Project Highway is two lane with paved shoulder
configuration with carriageway width ranging from 9.50 m to 10.0 m. The type of the
existing pavement is flexible pavement.
6 Major Bridges
The Site includes the following ROB (road over railway line) / RUB (road under railway
line):
8 Grade Separators
9 Minor Bridges
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-3
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
13 Culverts
Sr. No. Existing Chainage (km) Left Hand Side Right Hand Side Remarks
Nil
Right Hand
Sr. No. Existing Chainage (km) Length (m) Left Hand Side
Side
Nil
16 Roadside Drains
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-4
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
17 Major Junctions
18 Minor Junctions
19 Bypass
The details of the stretches passing through / abutting reserved forest area are as follows:
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-5
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
The details of the stretches passing through / abutting wildlife area are as follows:
Sr. Name of the Existing Chainage (km) Side (Left / Right / Length
No. Wildlife area From To Both) (km)
Nil
The details of the stretches passing through / abutting CRZ area are as follows:
The details of the stretches passing through environmentally sensitive areas such as
mangroves, mud floors, bird sanctuaries etc. are as follows:
24 Existing Utilities
The site includes the existing utilities as described in Sheet-1 (Annexure-1 to Schedule
A).
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-6
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Pumping
Pumping
Pumping
Sr.
Gravity
Gravity
Gravity
Gravity
Flow
Flow
Flow
Flow
With
With
With
With
With
With
With
With
No. From To
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-7
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annex-II
(Schedule-A)
The dates on which the Authority shall provide Right of Way to the Contractor on different
stretches of the Site are stated below:
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-8
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annex - III
(Schedule-A)
Alignment Plans
The alignment plan of the Project Highway is enclosed which is minimum requirement and is for
guidance only. The proposed plan & profile, locations of different structures / drains / service road
/ RE walls, chainages of different structures / drains / service road / RE walls, length of different
structures / drains / service road / RE walls etc. of the project highway as indicated in the
Schedule-A, Schedule-B, Schedule-C and their Annexures, shall be treated as minimum
requirement. Based on site / design requirement, the Contractor shall finalise Detailed Project
Report (DPR) including plan & profile of the project highway and submit the same to Authority and
its Engineer for acceptance, before the start of the execution of project.
The Contractor shall match the horizontal and vertical geometry of existing road at start
and end of the project highway.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-9
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annex - IV
(Schedule-A)
Environment Clearances
Environmental Clearance is not required as per MoEFCC Notification 23rd March 2020.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder A-10
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
SCHEDULE - B
(See Clause 2.1)
Development of the Project Highway shall include detailed design, including plan & profile
within available ROW and construction of the Project Highway as described in Schedule-
B and Schedule-C. The alignment plans of the Project Highway are given in Annex-III of
Schedule A which is minimum requirement and are for guidance only. The proposed plan
& profile, locations of different structures / drains / slip road / retaining walls, chainages of
different structures / drains / slip road / retaining walls, length of different structures / drains
/ slip road / retaining walls etc. of the project highway as indicated in the Schedule-A,
Schedule-B, Schedule-C and their Annexures, shall be treated as minimum requirement.
Based on site / design requirement, the Contractor shall finalise Detailed Project Report
(DPR) including plan & profile of the project highway and submit the same to Authority and
its Engineer for acceptance, before the start of the execution of project.
Rehabilitation, upgradation and augmentation shall include Four Laning of the Project
Highway as described in Annex-I of this Schedule-B and Schedule-C.
The Project Highway shall be designed and constructed in conformity with the
Specifications and Standards specified in Annex-I of Schedule-D.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-1
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annexure - I
(Schedule-B)
The Project Highway shall generally follow the horizontal alignment shown in the plan
specified in Annexure-III of Schedule-A, unless otherwise specified by the Authority.
Notwithstanding anything to the contrary contained in this Agreement or IRC:SP:84-2019,
the proposed plan & profile, locations of different structures / drains / service road / RE
walls, chainages of different structures / drains / service road / RE walls, length of different
structures / drains / service road / RE walls etc. of the project highway as indicated in the
Schedule-A, Schedule-B, Schedule-C and their Annexures shall be treated as minimum
requirement. Based on site / design requirement, the Contractor shall finalise their Detailed
Designs (Development Stage) including plan & profile of the project highway and submit
the same to Authority & its Engineer for its Consent / Approval and Safety Audit by Safety
Auditor, before the start of the execution of project. The designs so approved shall not be
in contradiction with the scope of project. For avoidance of doubt, the provisions mentioned
in schedule B & C cannot be changed, only the design of the components is to be
submitted for consent / approval.
1.1.1. Four Laning with paved shoulders shall be undertaken. The paved carriageway shall be
18.0 m for four laning (including paved shoulder and kerb shyness / edge strip). The
earthen shoulder shall be 2 m on either sides. (Circular: NHAI/Bharatmala/EC/DPR/2016/
143430 dated 30.10.2019).
1.1.2. In built-up sections / areas the width of paved carriageway shall be 19.0 m for four laning
(including paved shoulder and kerb shyness / edge strip).
1.1.3. Except as otherwise provided in this Agreement, the width shall be adjusted to fit into
appropriate plans and cross sections developed in accordance with TCS enclosed.
1.1.4. The entire cross-sectional elements shall be accommodated in the available / proposed
ROW. If required, suitable retaining structures shall be provided to accommodate the
highway cross section within the available / proposed ROW. The details of such sections
are mentioned in Schedule-B. In case of any other section not included in Schedule-B,
where retaining structures are to be provided, shall constitute a Change of Scope.
1.2.1. The width of median including kerb shyness shall be 5.0 m for raised median. In built up
section the width of median shall be 4.0 m.
1.2.2. A suitable shrub shall be proposed in median portion. (clause No. 2.5.6 of IRC:SP:84-
2019).
2.1. General
Geometric design and general features of the Project Highway shall be in accordance with
Section 2 of the manual. Intermediate Sight distance (Desirable Minimum Sight Distance)
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-2
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
shall be followed for design of summit curves including structures as well as highways.
(clause No. 2.9.5 of IRC:SP:84-2019).
The project highway passes through plain & rolling terrain, the project road shall be
designed for 100 kmph. (clause No. 2.2 of IRC:SP:84-2019).
2.3.1. The existing road geometrics shall be improved as per the codal provisions. In the
sections, where improvement of the existing road geometrics to the prescribed standards
is not possible, the existing road geometrics shall be improved to the extent possible within
the given right of way and appropriate road signs, pavement markings and safety
measures shall be provided.
2.3.2. The entire cross-sectional elements shall be accommodated in the available / proposed
ROW. If required, suitable full height retaining structures shall be provided to
accommodate the highway cross section within the available / proposed ROW. The details
of such sections are mentioned in Schedule-B. In case of any other section not included
in Schedule-B, where retaining structures are to be provided, shall constitute a Change of
Scope.
2.3.3. Realignments
The existing road shall be improved to the standards as specified in the manual at the
following locations:
2.3.4. Bypasses
The existing road shall be bypassed to the standards as specified in the manual at the
following locations:
Details of the Right of Way along Project Highway are given in Annexure-II of Schedule-
A.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-3
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
2.5.1. The Design Specification of paved shoulder shall conform to the requirements specified in
paragraph 5.10 of the manual.
2.5.2. Paved shoulders and strip on median side shall be of same specification and pavement
composition as of main carriageway (clause No. 5.10 of IRC:SP:84-2019).
2.5.3. In Built-up sections, footpaths / fully paved shoulder shall be provided with width 1.5 m.
(Clause No. 2.15 of IRC:SP:84-2019).
2.5.4. In open country, paved shoulders of 1.5 m width shall be provided. (Clause No. 2.6 of
IRC:SP:84-2019).
2.5.5. The Design Specification of paved shoulder shall conform to the requirements specified in
paragraph 5.10 of the manual.
2.5.6. The earthen shoulder of 2.0 m width on shoulder side shall be provided with top 150 mm
on earthen shoulder with well graded naturals and moorum gravel crust stones or
combination thereof, confirming to Clause 401 of MoRTH specification. (Clause No. 5.11
of IRC:SP:84-2019).
2.6.1. In case of VUP / LVUP / SVUP, the proposed structure, the finish road level in VUP / LVUP
/ SVUP shall be kept 150 mm above the ground level / service road / cross road (whichever
is higher) to ensure that these VUP / LVUP / SVUP don’t become water accumulation
points. (Clause No. 2.10 of IRC:SP:84-2019)
2.6.2. The vertical and horizontal clearance at the underpasses shall be as per Clause 2.10.2 of
the manual.
2.7.1. Lateral and vertical clearances for overpasses shall be as per paragraph 2.11 of the
Manual.
2.7.2. Lateral clearance: The width of the opening at the Overpasses shall be as follows:
The height of embankment of service road shall confirm to clause 4.2.1 of the manual.
2.8.2. The Service roads shall be constructed at the locations and for the lengths indicated below:
Sr. Design Chainage (km) Length (m) Paved Carriageway Width Total
Remarks
No. From To LHS RHS including paver block (m) (m)
1 170+300 171+340 1040 1040 6.5 2080
2 171+422 171+900 478 478 6.5 956
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-4
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Sr. Design Chainage (km) Length (m) Paved Carriageway Width Total
Remarks
No. From To LHS RHS (m) (m)
1 193+310 193+480 - 170 7.0 170
2 196+004 196+090 86 - 5.5 86
3 196+163 196+200 37 - 5.5 37
4 196+277 196+340 63 - 5.5 63
5 205+300 205+320 20 - 5.5 20
6 205+455 205+790 335 - 5.5 335
7 205+855 206+055 200 - 5.5 200
8 220+745 220+800 - 55 7.0 55
9 224+953 225+100 147 - 5.5 147
10 225+000 225+050 - 50 5.5 50
2.8.3. The Parking bays shall be provided along service road (clause No. 2.12.2.1 of IRC:SP:84-
2019).
2.8.4. Slip Road: The height of embankment of slip road shall confirm to clause 4.2.1 of manual.
The Slip roads shall be constructed at the locations and for the lengths indicated below:
2.8.5. Separator Between Main Carriageway and Service Road (clause No. 2.15.1 of
IRC:SP:84-2019)
A separator between main carriageway and service road shall be provided to prevent the
pedestrians, local vehicles and animals entering the highway.
Note:
i. Above length of the service / slip roads is minimum specified. The actual length of the
service / slip / connecting roads shall be determined by the Contractor in accordance
with the approved plan & profile and design approved from the Authority Engineer. Any
increase / decrease up to 5 percent length from the length specified in this Clause of
Schedule-B shall not constitute a Change of Scope. Any additional length shall be dealt
in Change of Scope.
ii. The Acceleration, deceleration lane, right turning storage lane, entry / exit lanes shall
be constructed in addition to length given in above table and shall be deemed to be
part of the scope and no Change of Scope shall be considered for the same. (Clause
No. 2.12.2 of IRC:SP:84-2019)
Grade separated structures shall be constructed as per paragraph 2.13 of the Manual.
Proposed levels at structure locations as shown in plan & profile specified in Annexure-III
of schedule-A are minimum requirement and only for guidance and any increase in levels
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-5
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
shall not constitute any change of scope. Entry / Exit arrangement from main carriageway
shall be 50 m before / after the start / end of approach road to grade separator i.e. start /
end of valley curve (clause No. 2.12.2.2 of IRC:SP:84-2019). RCC barrier shall start from
start of valley curve and end after grade separator at end of valley curve.
The sub-structure shall be continued in the median portion with RCC barrier wherever
superstructure has not been proposed in median portion. (Clause 7.1 (vii) of IRC:SP:84-
2019).
50 m long MBCB Safety barriers on structure approaches shall be provided on all four
faces of each structure. MBCB provided towards median side of each structure shall be
joined on ends in semi-circular shape. (Clause No. 4.3.5 and 4.9 of IRC:119)
2.5 m / 1.5 m / 0.75 m wide footpaths shall be provided at grade intersection below
structures for each direction of pedestrian movement (refer fig 3.1 to 3.6 of IRC:SP:84-
2019).
Super Minimum
Design LHS RHS Span
Sr. Structure Vertical Skew
Chainage Roadway Roadway Arrangement Remarks
No. Provision Clearance Angle
(km) Width (m) Width (m) (m)
in Median (m)
Nil
Super Minimum
Design LHS RHS Span
Sr. Structure Vertical Skew
Chainage Roadway Roadway Arrangement Remarks
No. Provision Clearance Angle
(km) Width (m) Width (m) (m)
in Median (m)
The details are as included along with ROB under 7.4.2 of Schedule-B.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-6
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Cattle and pedestrian underpass shall be constructed as follows: (No Clause exists in IRC:
SP:84-2019)
2.9.7. Details of Ramps, Cross Roads and Connecting Roads at Interchanges (IC)
Super Minimum
Design LHS RHS Span
Sr. Structure Vertical Skew
Chainage Roadway Roadway Arrangement Remarks
No. Provision Clearance Angle
(km) Width (m) Width (m) (m)
in Median (m)
The details are as included along with ROB under 7.4.2 of Schedule-B.
2.10. Typical Cross Section (TCS) of the Project Highway (clause No. 2.17 of IRC:SP:84-2019)
The Project Highway shall be constructed to Four lane configuration. Typical cross
sections required to be developed in different sections of the Project Highway are given
below.
Design Chainage
Sr. (km) Length
TCS Type Cross Section Description
No. (m)
From To
Reconstruction of existing carriageway -
1 170+000 170+300 300 TCS-01
Open Country (Concentric Widening)
Reconstruction of existing carriageway -
2 170+300 170+890 590 TCS-02
Built up area (Concentric Widening)
Four Lane ROB Approach with 4.0 m
3 170+890 171+320 430 TCS-03
median
Four Lane ROB Viaduct (Non-Railway
4 171+320 171+340 20 TCS-04(b)
portion)
5 171+340 171+422 82 TCS-04(a) Four Lane ROB Viaduct (Railway portion)
Four Lane ROB Viaduct (Non-Railway
6 171+422 171+556 134 TCS-04(b)
portion)
Four Lane ROB Approach with 4.0 m
7 171+556 171+900 344 TCS-03
median
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-7
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Note:
1. Any variations in the lengths specified in the above table shall not constitute a
Change of Scope
2. Lengths mentioned in the above list for cross section types concerned to structures
are inclusive of structure length.
3. RE wall shall be provided for full height on all structures. (clause No. 7.1 (iv) of
IRC:SP:84-2019)
4. Toe wall (0.6 m height) to be provided where ROW is restricted and water bodies
along the proposed highway on the sections specified in Schedule-B.
8. The provision of merging and de-merging arrangement as per Manual after km.
171+900 is in the scope of Contractor.
All at-grade intersections and grade separated intersections shall be as per Section 3 of
the manual. Existing at-grade intersections shall be improved to the prescribed standards.
Properly designed intersections shall be provided at the locations and of types and
features given in the tables below:
Leads to Length
Category Carriageway of cross road
Design
Sr. Junction Median of width to be
Chainage
No. Type Left Right Opening Cross of cross developed
(km)
Road road
LHS RHS
1 170+515 T Chakkian - Yes NH-703B 7.0 m 250 m -
2 170+600 T - Mallanwala Yes NH-703A 7.0 m - 250 m
3 170+785 T Chakkian - Yes NH-703B 7.0 m 250 m -
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-8
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Note:
1. Type of Junction to be improved as per manual. (clause No. 3.2.5 of IRC:SP:84-
2019)
The cross road at the junctions which are having a level difference from the main
carriageway, are to be improved at the level of main carriageway for the length of
30 m and then to be merged with the cross road at the gradient not more than 1:50.
(Clause No. 3.2.2 of IRC:SP:84-2019)
3. For minor / major layout for left-in / left out arrangement with physical islands with
hazard marking. Where there is space constraint to provide physical islands, the
effect of junction kept wide opened can be avoided by ghost island with marking.
(Fig 3.7 of IRC:SP:84-2019)
4. For U-turn, Self-Regulated U-Turn facility shall be created. (Fig 3.6 of IRC:SP:84-
2019) as per fig 3.6 of manual (IRC:SP:84-2019).
Leads to Length
U-Turn Carriageway
Design of cross road
Sr. Junction provision Category of width
Chainage to be
No. Type Left Right in Viaduct Cross Road of cross
(Km) developed
Spans road
LHS RHS
1 171+330 T - - Yes VR 7.0 m 50 m -
2 171+405 T - - No VR 3.5 m 50 m -
3 171+470 T - - No VR 7.0 m 50 m -
4 171+535 X - - Yes VR 5.5 m 50 m 50 m
Note:
1. The Contractor shall take up ‘Detailed Engineering study’ to ascertain further
details of all intersections and treatment of the intersections shall be designed in
accordance with the latest guidelines mentioned out in section-3 of manual.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-9
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
2. Junction improvement under grade separators shall be carried out as per manual
with proper entry / exit to cross roads and slip / service roads, etc. Auxiliary lanes
including storage, acceleration and deceleration lane along with physical islands to
be provided.
4. Only Entry or Exit shall be designed at any location (provision of entry / exit by
ghost island not permitted). (Clause No. 2.13.1 of IRC:SP:84-2019)
Based on site / design requirement, the Contractor shall design the alignment plans and
profiles of the project highway based on site / design requirement mentioned in Schedule-
B with approval from the Authority Engineer within the available Right of Way. However, it
is clarified that bottom of subgrade level shall be at-least 1500 mm above HFL / Existing
ground level for a greenfield / bypass stretch.
The side slopes shall not be steeper than 2H:1V. In case, there is a ROW constraint then,
suitable soil retaining structures shall be provided (Clause No. 4.2 IRC:SP:84-2019)
For stability of slope upto 3 m height the turfing can be adopted. For the slope from
3-6 m suitable, geocell, geo-grid, geo-green etc. can be provided with suitable
drainage chutes as per IRC:56. For the slope more than 6 m height, a complete slope
stability analysis as per IRC:75 shall be done and the slopes shall be compulsory
protected with stone pitching within stone masonry grid structure of 4 x 4 m and
suitable drains / chutes etc. shall be provided for effective drainage of the water.
5. Pavement designs
5.1. Pavement design shall be carried out in accordance with Section 5 of the Manual.
5.2. Type of Pavement and Design requirement (Clause No. 5.4 of IRC:SP:84-2019)
The pavement shall be flexible type for entire length of project highway including service
road.
5.2.1. Design Period and Strategy: The Flexible Pavement shall be constructed for the entire
length of Project Highway including paved shoulders. Flexible Pavement shall be designed
for a minimum design period of 20 years and minimum subgrade CBR of 8% and maximum
subgrade CBR of 10%. Stage construction shall not be permitted.
5.2.3. The pavement for service roads shall be designed for projected traffic of minimum of 10
MSA.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-10
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
5.3. In order to meet the intended functional requirement of respective pavement layers on
main carriageway, the minimum thickness of respective pavement layers for main
carriageway and connecting cross roads / service roads / slip roads / entry / exit locations,
acceleration / deceleration lane, right turning lanes shall, however, in no case be less than
as given below:
5.3.1. Main carriageway, paved shoulder, median side paved strip, entry / exit locations,
acceleration / deceleration lane, right turning lanes (Flexible) with GSB / WMM
5.4. Reconstruction of Stretches with New pavement (Clause No. 5.9.4 of IRC:SP:84-2019)
The following stretches of the existing road shall be dismantled / milled and reconstructed.
These shall be designed as new pavement.
The following stretches of the existing road shall be provided bituminous overlay as
follows:
6. Roadside Drainage
6.1. Drainage system including surface and subsurface drains for the Project Highway
including crossroads shall be provided as per section 6 of the manual. RCC Drain cum
footpaths shall conform to the cross-sectional features and other details as given in
Annexures to Schedule-B and shall be provided as under:
Details of RCC Drain Cum Footpath (Clause No. 2.13 & 6.2.6 of IRC:SP:84-2019)
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-11
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
i. New Construction:
In addition to the above chainages, new RCC drain shall be constructed at the following
locations in consultation with Authority Engineer at Site.
ii. Re-construction:
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-12
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
iii. Retention:
6.2. Unlined Drains other than above mentioned locations shall be provided in the entire
project length which gets terminated at all crossroad locations. In case, the definite outfall
is not available, a rainwater harvesting system shall be provided at the deepest location
for dispersal of water.
Lined drain shall be provided in the center of the median at super elevation locations.
Draining of strom water from one carriageway to other carriageway is not permitted. The
Contractor shall design the median drain based on site / design requirement mentioned in
Schedule D with approval from the Authority Engineer and shall be connected with the
nearest culvert / outfall.
6.4. Drainage arrangement between Main Carriageway and Service Roads (Clause No.
2.15 of IRC:SP:84-2019)
A suitable drainage arrangement for draining storm water of main carriageway shall be
provided. Storm water of main carriageway to service road is not permitted.
6.5. Drainage where Embankment Height is more than 3 m (Clause No. 6.4 of IRC:SP:84-
2019)
A suitable drainage arrangement for draining storm water from deck slab shall be
provided. Water shall not fall on any surface of the structures or remain standing or flowing
over the road below structure.
6.7. Drainage for Underpass and Subways Structures (Clause No. 6.8.3 of IRC:SP:84-
2019)
A suitable drainage arrangement for draining storm water from Underpass and Subways
shall be provided.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-13
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Vertical Drop-down drainage pipes with suitable cleaning provision shall be provided at
suitable interval. Drainage fixtures and dropdown pipes shall be of rigid, corrosion resistant
material not less than 100 mm dia. The Storm water of main carriageway draining on
service road is not permitted.
7. Design of Structures
7.1. General
All major structures will be designed preferably as continuous slab to reduce the number
of expansion joints on the MJB / ROBs / flyover / Interchange etc.
7.1.1. All bridges, culverts and structures shall be designed for IRC class Special Vehicle (SV)
loading as per IRC: 6 and constructed in accordance with section-7 of the manual and
shall conform to the cross-sectional features and other details specified therein.
7.1.2. The overall width of the structures shall be as given in Para 7.3 of Annex-I of Schedule-B.
(Clause No. 7.3 of IRC:SP:84-2019)
7.1.3. The Safety Barrier and Footpath on Bridges and RoB shall continue on approaches. The
footpath shall be provided with paved surface & railing till the embankment height is more
than 3 m. (Clause No. 7.17 of IRC:SP:84-2019)
7.1.5. All structures shall be designed to carry utility services on outer side of RCC barrier /
Railing as per site requirement.
7.1.6. Cross section of the new culverts and bridges at deck level for the Project Highway shall
conform to the typical cross sections given in Section 2.10 of the Schedule-B.
7.2.1. Overall width of all culverts shall be equal to the roadway width of the approaches. The
overall width of culverts shall be including width of main carriageway and slip / service
roads / Entry ramps / Exit Ramps / Acceleration / Deceleration lanes, etc. All culverts shall
also be continued in median and in gap between main carriageway and service road.
7.2.2. New / Reconstruction of existing RCC pipe culverts: The existing culverts at the
following locations shall be re-constructed as new culverts:
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-14
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
7.2.3. Widening of existing RCC pipe culverts (Clause No. 7.3 iii of IRC:SP:84-2019)
All existing culverts which are to be retained shall be widened to the proposed roadway
width of the Project Highway as per the typical cross section given in section 7 of the
Manual. Repairs and strengthening of existing structures where required shall be carried
out.
7.2.5. New / Reconstruction of existing culverts (given in table below) shall be constructed
for width equal to the proposed roadway width of the Project Highway & as per typical
cross-section given in schedule B. The details are given as under:
Design Culvert
Sr. Span Arrangement
Chainage Skew Angle Crossing Remarks
No (m)
(km) Type
1 170+522 1x2x2 - Balancing
All existing culverts which are to be retained shall be widened to the proposed roadway
width of the Project Highway as per the typical cross section given in Schedule-B. Repairs
and strengthening of existing structures where required shall be carried out. (Clause No.
7.3 iii of IRC:SP:84-2019)
7.2.8. Utility ducts in bypasses (Greenfield as well as Brownfield which is being upgraded) in
form of NP-4 RCC Pipe dia 600 mm shall be provided across the Project Highway @ 0.50
km c/c and along with inspection chamber where directed for crossing of utilities anywhere
as per manual requirements. (Clause No. of 2.16 of IRC:SP:84-2019)
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-15
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
7.3. Bridges
1. Existing bridges proposed for reconstructed as new structures: New bridges at the
following locations on the Project Highway shall be constructed. GADs for the new
bridges are attached in the drawings folder. (Clause No. 7.3 iv(a) of IRC:SP:84-
2019)
Sr. Design Chainage Total Proposed Type of Total Proposed width (m) Skew
No. (km) length (m) Crossing MCW SR Angle
1 171+575 11.0 Stream 1 x 23 2 x 8.8 -
2. Existing narrow bridges proposed to be retained and widened: (Clause No. 7.3 iv
of IRC:SP:84-2019)
Sr. Design Chainage Total Proposed Type of Total Proposed width (m) Skew
No. (km) length (m) Crossing MCW SR Angle
Nil
7.3.2. Additional New Bridges: New bridges at the following locations on the Project Highway
shall be constructed. (Clause No. 7.3 ii of IRC:SP:84-2019)
7.3.3. The railings of existing bridges shall be replaced by crash barriers at the following
locations: (Clause No. 7.17 iv of IRC:SP:84-2019)
7.3.4. The existing bridges / RoB / Grade Separators / RUB retained on the project highway shall
be upgraded and rehabilitation measures / proposals shall be specified as follows: (Clause
No. 7.3 iv(b) of IRC:SP:84-2019)
Location
Sr. No. Rehabilitation Proposals Remarks
at km
Nil
7.4.1. Design, construction and detailing of ROB / RUB shall be as specified in Section 7 of the
manual.
7.4.2. Road over bridges (road over rail) shall be provided at the following locations, as per GAD
drawings attached:
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-16
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Type of super-
Design structure (i.e., Bow Total
Sr. Proposed Span Name of Skew
Chainage string, simply Width Remarks
No. Arrangement (m) crossing Angle
(km) supported composite (m)
structure etc.
1 x 19.24 (VUP) + Simply supported steel Approved
(1 x 25.25 + 1 x composite girder GAD is
Makhu
1 171+387 37.28 + 1 x 19.24) (Railway portion) & 2 x 12.30 3° placed in
Town
[ROB] + 7 x 19.24 PSC girder (Non- Drawing
(Elevated portion) Railway portion) Volume
Note:
1. If the length / width of the span / type of super-structure is changed due to any
reason the COS shall be considered.
2. ROB shall be designed, constructed and maintained as per the requirements of
Railway authorities. The construction plan shall be prepared in consultation with
the concerned railway authority.
3. The ROB shall be constructed and maintained by the Contractor under supervision
of the Railways.
4. All charges payable to the Railways like D&G, Capitalized maintenance, signaling,
cabling, OHE modification, earthing etc. except P&E charges shall be borne by the
Contractor.
7.4.3. Road under bridges (road under railway line) shall be provided at the following level
crossings, as per GAD drawings attached:
The grade separated structures shall be provided at the locations and of the type and
length specified in paragraphs 2.9, 2.10 and 3 of Annexure-I of Schedule-B.
7.6. FoB / Skywalks (Clause No. 10 of IRC:103 and Clause No. 9.8.5 of IRC:SP:84-2019)
Location
Sr. No. FoB Type Remarks
at km
Nil
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-17
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
8.1. Traffic control devices and road safety works shall be provided in accordance with Section
9 of the IRC:SP:84-2019.
The safety barriers shall be provided in accordance with Section-9 of Clause 9.7 of the
manual. The Safety Barrier length proposed are excluding the safety barrier already
proposed on Culverts, Grade Separated Structures, Interchange, Bridges, RoB and
RUB as applicable cross sections respectively.
End Treatment of Steel barriers / Rope Barrier shall be specified i.e. MELT or P-4
confirming to EN 1317-4, TT, MBCB barrier to Concrete Barrier (Clause No. 9.7.2 (b) of
IRC:SP:84-2019)
End Treatment to Concrete barrier shall be done as specified in Clause No. 9.7.3 (b) of
IRC:SP:84-2019.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-18
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
9. Roadside Furniture
The safety barriers shall be provided at the following hazardous location such as ponds,
well, electric sub-station, Electric tower, spilt carriageway, etc.
Retaining Structure and protection works shall be provided at locations as indicated below
and as provided in TCS schedule in cl. 2.10 of schedule-B.
The Open well shall be identified and appropriate treatment shall be provided.
The Contractor shall undertake the work of shifting of any utility (including electric lines,
water pipes, gas pipelines and telephone cables) to an appropriate location or alignment,
in accordance with the provisions of Contract Agreement.
The details of the existing utilities to be shifted are mentioned in Annexure-I to Schedule-
A. A copy of Utility Shifting Plan is enclosed for reference.
14. Work Zone Traffic Management Plans (Clause No. 9.9 of IRC:SP:84-2019) Annexure-ii
Schedule B- Typical Cross Sections
The traffic diversion plans shall be prepared as per IRC:SP:55 for smooth flow of traffic
and safety. A diversion plan shall be proposed for construction of Culvert, Grade
Separated Structures, Bridges, RoB / RUB, etc. and traffic management plan for widening
/ reconstruction of carriageway.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-19
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annexure - II (Schedule - B)
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-20
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-21
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-22
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annexure - III
(Schedule - B)
The Plan & Profile and General Arrangement Drawing (GAD) of structures of the Project highway
are provided along with Bid Documents.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder B-23
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
SCHEDULE - C
(See Clause 2.1)
PROJECT FACILITIES
1. Project Facilities
The Contractor shall construct the project facilities in accordance with the provisions of
this agreement. Such Project facilities shall include:
a) Toll Plaza
b) Road side furniture
i. Kilometer and Hectometer Stones
ii. Traffic Signs
iii. Overhead Signs
iv. Road Marking
v. Road Delineators
vi. Reflective Pavement Markers & Solar Studs
vii. Traffic Impact Attenuators
viii. Boundary wall and Fencing
c) Operation and Maintenance centers
d) Way side Amenities / Service Areas
e) Truck lay-byes
f) Bus Bay and Bus shelter
g) Pedestrian Facilities
h) Highway Lighting
i) Rainwater Harvesting
j) Environmental Management Plan
k) Land Scaping and Tree Plantation
l) Advanced Traffic Management System (ATMS)
m) Highway Patrol Units
n) Emergency medical services
o) Crane Service
1.1. Project Facilities to be completed on or before project completion date have been
described in Annexure-I of this Schedule-C.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-1
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annexure - I
(Schedule-C)
PROJECT FACILITIES
1. Project Facilities
The Contractor shall construct the Project Facilities described in this Annexure-I to form
part of the Project Highway. The Project Facilities shall include:
a) Toll Plaza
b) Roadside furniture
i. Kilometer and Hectometer Stones
ii. Traffic Signs
iii. Overhead Signs
iv. Road Marking
v. Road Delineators
vi. Reflective Pavement Markers & Solar Studs
vii. Traffic Impact Attenuators
viii. Boundary wall and Fencing
c) Operation and Maintenance centers
d) Way side Amenities / Service Areas
e) Truck lay-byes
f) Bus Bay and Bus shelter
g) Pedestrian Facilities
h) Highway Lighting
i) Rainwater Harvesting
j) Environmental Management Plan
k) Land Scaping and Tree Plantation
l) Advanced Traffic Management System (ATMS)
m) Highway Patrol Units
n) Emergency medical services
o) Crane Service
1. Toll Plaza
Tolling system shall be provided in entire length of the project and the same is integrated
with the adjoining packages. The Toll Plazas shall be provided as per NHAI circular No.
17.5.82 dated 24/5/2021 and Schedule D. Minimum Lane requirement in the opening year
are as follows.
Toll Plaza shall be provided confirming to Clause No. 10.2 of IRC:SP:84-2019 at the
following locations:
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-2
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
2. Roadside furniture
Sr.
Item Number Remarks
No.
Kilometer The KM / Hectometer stones / marker can be Concrete /
(2 x No. of
1 Marker / Stones and shall be placed on both outer side of the earthen
kms) + 2
Stones shoulder.
Traffic Signs include roadside signs, overhead signs and kerb mounted signs etc. shall be
provided along the entire Project Highway and on all Side, Roads joining the main
carriageway / service road. A QR code shall be marked on back of each sign as per
IRC:67.
All sign shall be of Micro Prismatic Grade Sheeting corresponding to Class C sheeting as
per ASTM D 4956 Type VIII, IX and XI. (Clause No. 9.2.3 of IRC:SP:84-2019)
All shoulder mounted signs shall be supported on GI Pipes. Overhead Signs shall be
placed on a structurally sound gantry or cantilever structure made of GI pipes. (Clause No.
9.2.4 of IRC:SP:84-2019)
The siting of signs shall confirm to Table 4.1 and Fig 4.1 of IRC:67. The two successive
signs shall be placed at a minimum distance of 0.6 x V metre (V is design speed in kmph).
(Clause No. 4.8 of IRC:67-2022)
The overhead gantry signs shall be placed as given below: (Clause No. 16.3.2 of IRC:67-
2022)
Sr. Carriageway
Item
No. (Left, Right, Both)
01 No. at km. 171+000
1 Overhead Gantry signs
(towards Amritsar direction on RHS c/w)
2 Overhead Cantilever Gantry Signs -
3 Double / Butterfly Cantilever -
Note: The locations of the placement of signages shall be finalized in consultation with
Authority Engineer / NHAI, as per site requirement.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-3
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Road Markings shall be hot applied thermoplastic materials with reflectorized beads to
achieve visibility confirming to clause 2.7.2 of IRC 35. (Clause No. 2.2 of IRC:35)
The cold applied plastics pavement markings shall be used for School Zone Markings,
Audible Raised Profile Edge Lines and Block Markings (BM 01/02/03). (Clause No. 2.4 of
IRC:35)
Note: The locations of the marking shall be finalized in consultation with Authority Engineer
/ NHAI, as per site requirement.
Sr.
Item Number/ Length (m) Remarks
No.
1 Roadway Indicators -
Median Marker on Median / RCC Barrier
2 km. 170+300 to km. 171+900
(Clause 4 of IRC:79-2019)
3 Object Markers -
Flexible Object Markers (Clause 6 of
IRC:79-2019)
i.On Metal Beam Barrier
4 -
ii.On Toll Booth / Toll Island
iii.On Entry / Exit of Tunnel
iv.On Exit from Main carriageway
Solar Blinkers on Median Opening, on exit
5. from main carriageway and traffic islands of 06 Nos. at median openings
grade separated intersections
Note: The locations of the marking shall be finalized in consultation with Authority Engineer
/ NHAI, as per site requirement.
2.5. Reflective Pavement Markers & Solar Studs (Clause No. 9.5 of IRC:SP:84-2019)
The Prismatic Retro-Reflective type confirming to ASTM D-4280 Pavement Markers &
Solar Power Studs on Highway shall be provided in accordance with Schedule-D.
2.6.1. Provide Impact Attenuators in Gore Areas. It shall be self-restoring confirming to section
10.6 of IRC:SP:99 i.e. Manual of Specifications and Standards for Expressways at
following locations.
Sr.
Item Chainage / Number Remarks
No.
On flyover / grade separated km. 170+300, km. 170+515, km.
1 structure at exit from main 170+600, km. 170+785, km.
carriageway 171+900 / 5 Nos.
2 On Island of Toll Plaza -
Any other location which Safety
3 -
Hazard
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-4
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Provide End Terminals P-4 type confirming to EN 1317-4 to Parapet Walls of Culverts,
Structures ends for the safety of approaching traffic etc.
Sr.
Item Chainage / Number Remarks
No.
1 Culvert Ends -
ROB at km. 171+387
2 Structures Ends
(median side on both ends)
3 Any other location which Safety Hazard -
Deleted.
Deleted.
4. Way side Amenities / Service Areas / Rest Area (Clause No. 12.9 of IRC:SP:84-2019)
Deleted.
Deleted.
Deleted.
Pedestrian Facilities shall be provided in accordance with the Manual of Specifications and
Standards as referred in Clause 9.8 of Schedule D and IRC:103-2022. This shall consist
of footpath (sidewalks), pedestrian guard rails and pedestrian crossing.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-5
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
The street light poles shall be 1 piece, continuous-tapered, Octagonal poles and
shall be manufactured from one length of steel sheet, formed in continuous tapered
tube, with one continuous arc-welded vertical seam. The minimum wall thickness for
lighting poles shall not be less than 4 mm. The Bottom Diameter shall be minimum 175
mm. The Top Diameter shall be minimum 75 mm. The door on window of pole shall be
antitheft. All electrical cable should be concealed. All electrical lighting fixers shall be LED.
The fixtures shall be concealed except on poles. Lighting poles shall be fixed on outer side
of steel / concrete barrier. The lighting shall be providing at the following locations:
Chainage Lighting
Source:
Sr. Electricity
Lighting facilities Side
No. From To Board /
Generator /
Solar
Toll Plaza area: The lighting in and around toll
plaza, toll booths, office building, on the
approach road, etc. shall be as per Section 12
1 - - -
of the Manual. In addition to at least two high
mast light shall be provided on either side of toll
plaza
Rest Areas: The entire Rest areas shall be
2 provided with lighting with average illumination - - -
to 40 Lux
Truck lay-bye: The entire area of truck lay-
byes and 50m length of the project highway on
its either side shall be illuminated at night to
provide an average illumination of 40Lux.
3 Suitable designed electric poles having - - -
aesthetic appeal and energy saving bulbs
(LED) may be used to provide required
illumination. Alternatively, photo voltaic lamps
may be used
Bus Bay & bus shelter locations: The entire
4 bus bay & bus shelter area shall be provided - - -
with Lighting (Average illumination of 40Lux.).
Grade separated structures, interchanges,
flyovers, underpasses (vehicular /
pedestrian) and Vehicle overpasses:
Lighting requirement shall be as per section 12
of the manual. The top and underside of the Both Electricity
170+890 171+900
grade separated structures including service side Board
road / slip road, interchange area at the ground
level up to 50m beyond the point from where
flaring of the main carriageway takes place
shall be provided with lighting. Also, on all legs
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-6
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Chainage Lighting
Source:
Sr. Electricity
Lighting facilities Side
No. From To Board /
Generator /
Solar
of at grade interchange/ crossings the lighting
shall be provided 50m beyond the point of
Centre on all legs. The minimum illumination
shall be 40 Lux., at the extreme edge of the
Highway
Built-up sections on the project highway both
170+300 171+320 Both Electricity
6 in the median of main carriageway and on the
171+400 171+900 side Board
service roads on both sides
170+515
On Median Openings provide 1 no. high Electricity
7 170+600 -
mast lighting of 25m height Board
170+785
On Major Bridges and its approaches
8 - - -
higher than 3m
9. Rainwater Harvesting
The provision of rainwater harvesting shall be provided at every 500m staggered in the
entire project length and shall be executed as per requirement of IRC:SP:42-2014 and
IRC:SP:50-2013. Additionally, wherever urban drains are provided, which do not have a
definite outfall for discharge of water, at such location one pit for rainwater harvesting shall
be provided along the side drains at the lowest point / where the water stagnates.
The Contractor shall implement the Environmental Management plan & action Plan for
undertaking possible mitigation measures in accordance with environmental clearance
accorded by Ministry of Environment and Forests and climate change. The conditions &
directions stipulated by the MOEF shall be complied by the contractor.
The Contractor shall plant trees and shrubs of required numbers and types at the
appropriate locations within Right of Way and in the land earmarked by the Authority for
afforestation as per Schedule D at the following areas.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-7
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Drip irrigation system for median plantation by gravity / pressure sources with all necessary
components / systems and emitting devices at plants shall be provided.
The Contractor shall maintain the trees and shrubs in good condition during the concession
period as per the concession agreement.
Deleted.
Deleted.
Deleted.
Deleted.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder C-8
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
SCHEDULE - D
(See Clause 2.1)
1 Construction
The Contractor shall comply with the Specifications and Standards set forth in Annex-I of
this Schedule-D for construction of the Project Highway.
2 Design Standards
The Project Highway including Project Facilities shall conform to design requirements set
out in the following documents:
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder D-1
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Annex - I
(Schedule-D)
All Materials, works and construction operations of the Project Highway shall confirm to
the “Manual of Specifications and Standards for Four Laning of Highways” published as
IRC:SP:84-2019 with all amendments and additions till date (Referred to as “Manuals” in
this Schedule) and MORTH Specifications for Road and Bridge Works (5th revision).
Where the specification for a work is not given, Good Industry Practice shall be adopted
to the satisfaction of the Authority’s Engineer.
2.1 The terms “Concessionaire”, “Independent Engineer” and “Concession Agreement” used
in the Manual shall be deemed to be substituted by the terms “Contractor”, “Authority’s
Engineer” and “Agreement” respectively.
2.2 Notwithstanding anything to the contrary contained in the aforesaid Manual, the
Specifications and Standards shall apply to the Project Highway, and for purposes of this
Agreement, the aforesaid manual shall be deemed to be amended to the extent set forth
below:
Sr. Clause
Details of item Description of Deviation
No. No.
1 2.3 Right of Way RoW shall be as specified in Annexure-II of Schedule-A.
3 2.5.1 Width of Median Median shall be as given in Schedule-B (TCS).
Width of Width of the paved shoulder shall be 1.5 m for open country
4 2.6.1
Shoulder and 2.0 m for built-up locations.
Stopping Sight Distance shall be adopted for the following
locations:
5 2.9.5 Sight Distance
1. km. 171+100 to km. 171+350
2. km. 171+420 to km. 171+670
Limiting Gradient of 3.3% shall be adopted for the following
locations:
6 2.9.6.2 Gradients
1. km. 170+960 to km. 171+230
2. km. 171+540 to km. 171+820
Lateral
7 2.10 Lateral Clearance shall be as given in Schedule-B.
Clearance
Utility corridor shall be provided as per availability of land at
8 2.16 Utility Corridor
Site.
Typical Cross
9 2.17 Typical Cross Section shall be as given in Schedule-B.
Section
Design of all At-Grade Intersections (Major and minor) shall
At-Grade
10 3.2 be within RoW of Project Road and Intersecting Road. No
Intersections
additional land acquisition is proposed.
Type of
11 5.2 The type of pavement shall be as specified in Schedule-B.
pavement
Height and Width The overall deck configuration of all structures shall be as per
12 7.3
of Structure Schedule-B (TCS).
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder D-2
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode
National Highway Authority of India Request for Proposal - Bid Documents
Sr. Clause
Details of item Description of Deviation
No. No.
Road Boundary Road Boundary Stones shall be provided as specified in
13 12.2
Walls (RBW) Schedule-C.
Widening and reconstruction of existing two lane carriageway to four lane with paved shoulder D-3
including construction of ROB in Makhu town from km. 170+000 to km. 171+900 of NH-54 in the
State of Punjab on EPC mode