DP Bord Checklist

This document is an inspection checklist for electric distribution boards used by Kutch Copper Limited. It outlines various safety and operational criteria that must be met, such as proper installation, weatherproofing, and the presence of safety equipment. The checklist is intended for use by contractors and safety personnel during inspections to ensure compliance with safety standards.

Uploaded by

abhishekroyal561
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
25 views1 page

DP Bord Checklist

This document is an inspection checklist for electric distribution boards used by Kutch Copper Limited. It outlines various safety and operational criteria that must be met, such as proper installation, weatherproofing, and the presence of safety equipment. The checklist is intended for use by contractors and safety personnel during inspections to ensure compliance with safety standards.

Uploaded by

abhishekroyal561
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

adarni KUTCH COPPER LIMITED

Document No. Revision No/Date


Issue No/Date
KCUOHS/CU27 01.04.2022 01.04.2022
DISTRIBUTION BOARD
Title: INSPECTION CHECK LIST FOR ELECTRIC

AP

O
CONTRACTOR NAME: LOCATION:
ID NO:
INSPECTION DATE
DUE DATE:
Sr.No Dates of Inspection
DESCRIPTION
Is ldentification No of MDB marked?

Is MD8 installed on Firm Base with grouting


(1 Meter height) & Easily accessible panel?
Are all the Housing & Connections of MDB
weather proof? (Minimum of IP 44 type)
Is Authorized Operator (Electrician) Name
Photo, Contact No. pasted on MDB
panel?(Confirm)
Are Voltage, Current and type of tools to be
5 used in theSocket &Panel Marked?
|Are ldentification tags on input and output
6 cables provided?

7 |IsSeparate MCB for every socket provided?


|Are Safety signs/Warnings / Instruction
|Displayed? (Isolate flammable Fire Hazard)
Is Double Earthing System followed for MDB
9 /DB panel with Standard earthing pit
Are Separate ELCB with tripping current of
10 30mA provided and in working condition?
Are Condition of Cable, Power Socket and
11 |Plug without damage?
Are Plug-Socket provided in MDB/ DB and
12 Industrial type? (IP 44 type)
Are HYLEM sheets provided over live bus
13 bars?
Is Proper termination of cables done with lug
14 on Bus bar/ Terminal?
Is Color coding system followed (RYB) for all
15 cables / wires?
Is Rubber Mat provided in-front of the MDB
16 /DB (Operator's Work Location)?
|Is Fire Extinguisher provided at MDB /DB
17 Work Location?
IsShock Treatment Chart provided at MDB /
18 DB Work Location?
Is Lock Out Tag Out available for MDB/ DB
19 Work Location?
20 Any Other
User Dept.
Checked By
Checked By |Safety Dept.
Contractor
Checked By
Representative