The document provides detailed load schedules for four panel boards (PB1, PB2, PB3, PB4) across different floors, including specifications for various electrical loads such as breakers, heaters, motors, and outlets. Each panel board includes information on circuit numbers, load descriptions, quantities, volt amperes, protection sizes, wire sizes, and conduit sizes. Additionally, it includes computations for typical loads, other loads, total current, main feeder requirements, and main protection specifications.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

design 3 #2

The document provides detailed load schedules for four panel boards (PB1, PB2, PB3, PB4) across different floors, including specifications for various electrical loads such as breakers, heaters, motors, and outlets. Each panel board includes information on circuit numbers, load descriptions, quantities, volt amperes, protection sizes, wire sizes, and conduit sizes. Additionally, it includes computations for typical loads, other loads, total current, main feeder requirements, and main protection specifications.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

UNIT 1: GROUND FLOOR LOAD SCHEDULE OF THE PANEL BOARD: (PB1)

UNIT 2: GROUND FLOOR LOAD SCHEDULE OF THE PANEL BOARD: (PB2)


Ckt.No Load Description Qty V.A. Volt Ampere Protection Size of TW Wire Size of conduit
Ckt.No Load Description Qty V.A. Volt Ampere Protection Size of TW Wire Size of conduit
1 Main Breaker 100 Amp. 2 x 22 mm2 32 mm.dia.
1 Main Breaker 100 Amp. 2 x 22 mm2 32 mm.dia.
2 Shower Heater 3.3kW 1 Unit 3,300 225 14.7 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
2 Shower Heater 3.3kW 1 Unit 3,300 225 14.7 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
3 Electric Motor, 1Hp 1 Unit 1,800 225 8 20 Amp. 3 x 2.0 mm2 15 mm.dia.
3 Electric Motor, 1Hp 1 Unit 1,800 225 8 20 Amp. 3 x 2.0 mm2 15 mm.dia.
4 Special Purpose Outlet (Kitchen Equipment) 1 Unit 1,500 225 6.67 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
4 Special Purpose Outlet (Kitchen Equipment) 1 Unit 1,500 225 6.67 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
5 Special Purpose Outlet (Laundry Equipment) 1 Unit 1,500 225 6.67 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
5 Special Purpose Outlet (Laundry Equipment) 1 Unit 1,500 225 6.67 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
6 Convenience outlet (L.R, D.R, C.R.)180W 5 Sets 900 225 4 20 Amp. 2 x 3.5 mm2 15 mm.dia.
6 Convenience outlet (L.R, D.R, C.R.)180W 5 Sets 900 225 4 20 Amp. 2 x 3.5 mm2 15 mm.dia.
7 Convenience outlet (P., G.,)180W 2 Sets 360 225 1.6 20 Amp. 2 x 3.5 mm2 15 mm.dia.
7 Convenience outlet (P., G.,)180W 2 Sets 360 225 1.6 20 Amp. 2 x 3.5 mm2 15 mm.dia.
8 Convenience outlet (K.,L.A.,SR.)180W 5 Sets 900 225 4 20 Amp. 2 x 3.5 mm2 15 mm.dia.
8 Convenience outlet (K.,L.A.,SR.)180W 5 Sets 900 225 4 20 Amp. 2 x 3.5 mm2 15 mm.dia.
9 Lighting Outlet (L.R., D.R, C.R.), 23W 9 Pcs 207 225 0.92 15 Amp. 2 x 2.0 mm2 15 mm.dia.
9 Lighting Outlet (L.R., D.R, C.R.), 23W 9 Pcs 207 225 0.92 15 Amp. 2 x 2.0 mm2 15 mm.dia.
10 Lighting Outlet (P., G.,), 23W 4 Pcs 92 225 0.41 15 Amp. 2 x 2.0 mm2 15 mm.dia.
10 Lighting Outlet (P., G.,), 23W 4 Pcs 92 225 0.41 15 Amp. 2 x 2.0 mm2 15 mm.dia.
11 Lighting Outlet (K., L.A., SR.) 23W 4 Pcs 92 225 0.41 15 Amp. 2 x 2.0 mm2 15 mm.dia.
11 Lighting Outlet (K., L.A., SR.) 23W 4 Pcs 92 225 0.41 15 Amp. 2 x 2.0 mm2 15 mm.dia.
12 Refrigerator 1 Unit 675 225 3.0 15 Amp. 3 x 2.0 mm2 15 mm.dia. 12 Refrigerator 1 Unit 675 225 3.0 15 Amp. 3 x 2.0 mm2 15 mm.dia.
13 Spare 15 Amp.
13 Spare 15 Amp.
14 Spare
14 Spare

COMPUTATION:
I. Typical Load ( C.O.+ Lighting Load + Ref) = ( 9.6 + 1.74 + 3 )A = 14.34A COMPUTATION:
II.Other Loads: I. Typical Load ( C.O.+ Lighting Load + Ref) = ( 9.6 + 1.74 + 3 )A = 14.34A
1 Unit 1 Hp, Electric motor = 8 Amperes II.Other Loads:
1 Units Shower Heater (14.7A)(0.75), (Table 2.20.3.16 Column A) = 11.03 Amperes 1 Unit 1 Hp, Electric motor = 8 Amperes
III.Total Current = ( 14.34 + 8 + 11.03) = 33.37A x (0.8 D.F.) = 26.69 Amperes 1 Units Shower Heater (14.7A)(0.75), (Table 2.20.3.16 Column A) = 11.03 Amperes
IV. Main - Feeder: III.Total Current = ( 14.34 + 8 + 11.03) = 33.37A x (0.8 D.F.) = 26.69 Amperes
= (26.69 + 0.25 x 10A) = 29.19 Amperes IV. Main - Feeder:
For flexibility and voltage drop, use 2 x 22 mm2 THHN wire from the panel board to the = (26.69 + 0.25 x 10A) = 29.19 Amperes
electrical gutter. For flexibility and voltage drop, use 2 x 22 mm2 THHN wire from the panel board to the
V. Main - Protection: electrical gutter.
= (26.69 + 0.25 x 10A) = 29.19 Amperes V. Main - Protection:
Use 100A, 2 pole main circuit breaker. = (26.69 + 0.25 x 10A) = 29.19 Amperes
Use 100A, 2 pole main circuit breaker.

UNIT 3: SECOND FLOOR LOAD SCHEDULE OF THE PANEL BOARD: (PB3)


UNIT 4: SECOND FLOOR LOAD SCHEDULE OF THE PANEL BOARD: (PB2)
Ckt.No Load Description Qty V.A. Volt Ampere Protection Size of TW Wire Size of conduit
Ckt.No Load Description Qty V.A. Volt Ampere Protection Size of TW Wire Size of conduit
1 Main Breaker 100 Amp. 2 x 22 mm2 32 mm.dia.
1 Main Breaker 100 Amp. 2 x 22 mm2 32 mm.dia.
2 Air-conditioning Unit @ MBR, 1.5 Hp 1 Unit 2,250 225 10 30 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
2 Air-conditioning Unit @ MBR, 1.5 Hp 1 Unit 2,250 225 10 30 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
3 Air-conditioning Unit @ BR1, 1 Hp 1 Unit 1,800 225 8 20 Amp. 3 x 2.0 mm2 15 mm.dia.
3 Air-conditioning Unit @ BR1, 1 Hp 1 Unit 1,800 225 8 20 Amp. 3 x 2.0 mm2 15 mm.dia.
4 Air-conditioning Unit @ BR 2, 1 Hp 1 Unit 1,800 225 8 20 Amp. 3 x 2.0 mm2 15 mm.dia.
4 Air-conditioning Unit @ BR 2, 1 Hp 1 Unit 1,800 225 8 20 Amp. 3 x 2.0 mm2 15 mm.dia.
5 Shower Heater 1 3.3kW 1 Unit 3,300 225 14.7 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia. 5 Shower Heater 1 3.3kW 1 Unit 3,300 225 14.7 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
6 Shower Heater 2 3.3kW 1 Unit 3,300 225 14.7 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
6 Shower Heater 2 3.3kW 1 Unit 3,300 225 14.7 20 Amp. 2 x 3.5 & 1 x 2.0 mm2 20 mm.dia.
7 Convenience outlet ( BR1.)180W 4 Sets 720 225 3.2 20 Amp. 2 x 3.5 mm2 15 mm.dia.
7 Convenience outlet ( BR1.)180W 4 Sets 720 225 3.2 20 Amp. 2 x 3.5 mm2 15 mm.dia.
8 Convenience outlet (MBR.,BR2., C.R.)180W 10 Sets 1800 225 8 20 Amp. 2 x 3.5 mm2 15 mm.dia.
8 Convenience outlet (MBR.,BR2., C.R.)180W 10 Sets 1800 225 8 20 Amp. 2 x 3.5 mm2 15 mm.dia.
9 Convenience outlet (B)180W 1 Sets 180 225 0.8 20 Amp. 2 x 3.5 mm2 15 mm.dia.
9 Convenience outlet (B)180W 1 Sets 180 225 0.8 20 Amp. 2 x 3.5 mm2 15 mm.dia.
10 Lighting Outlet ( BR1.), 23W 5 Pcs 115 225 0.51 15 Amp. 2 x 2.0 mm2 15 mm.dia.
10 Lighting Outlet ( BR1.), 23W 5 Pcs 115 225 0.51 15 Amp. 2 x 2.0 mm2 15 mm.dia.
11 Lighting Outlet (MBR., BR2., C.R,.), 23W 13 Pcs 299 225 1.33 15 Amp. 2 x 2.0 mm2 15 mm.dia.
11 Lighting Outlet (MBR., BR2., C.R,.), 23W 13 Pcs 299 225 1.33 15 Amp. 2 x 2.0 mm2 15 mm.dia.
12 Lighting Outlet (B.) 23W 2 Pcs 46 225 0.2 15 Amp. 2 x 2.0 mm2 15 mm.dia.
12 Lighting Outlet (B.) 23W 2 Pcs 46 225 0.2 15 Amp. 2 x 2.0 mm2 15 mm.dia.
13 Spare 15 Amp.
13 Spare 15 Amp.
14 Spare
14 Spare

COMPUTATION:
I. Typical Load ( C.O.+ Lighting Load + Ref) = ( 12 + 2.04)A = 14.04A COMPUTATION:
II.Other Loads: I. Typical Load ( C.O.+ Lighting Load + Ref) = ( 12 + 2.04)A = 14.04A
1 Unit 1.5 Hp, ACU = 10 Amperes II.Other Loads:
2 Units 1 Hp, ACU (2x8A) = 16 Amperes 1 Unit 1.5 Hp, ACU = 10 Amperes
2 Units Shower Heater (2 x 14.7A)(0.75), (Table 2.20.3.16 Column A) = 22.05 Amperes 2 Units 1 Hp, ACU (2x8A) = 16 Amperes
III.Total Current = ( 14.04 + 10 + 16 + 22.05) = 62.09A x (0.8 D.F.) = 49.67 Amperes 2 Units Shower Heater (2 x 14.7A)(0.75), (Table 2.20.3.16 Column A) = 22.05 Amperes
IV. Main - Feeder: III.Total Current = ( 14.04 + 10 + 16 + 22.05) = 62.09A x (0.8 D.F.) = 49.67 Amperes
= (49.67 + 0.25 x 10A) = 52.17 Amperes IV. Main - Feeder:
For flexibility and voltage drop, use 2 x 22 mm2 THHN wire from the panel board to the = (49.67 + 0.25 x 10A) = 52.17 Amperes
electrical gutter. For flexibility and voltage drop, use 2 x 22 mm2 THHN wire from the panel board to the
V. Main - Protection: electrical gutter.
= (49.67 + 0.25 x 10A) = 52.17 Amperes V. Main - Protection:
Use 100A, 2 pole main circuit breaker. = (49.67 + 0.25 x 10A) = 52.17 Amperes
Use 100A, 2 pole main circuit breaker.

Logo: Designed by: Approved By: Title: Owner / Location: Sheet Content: Sheet No.:
TIN Number: 165-733-887
REX IVAN R. GRAYCOCHEA Reg. No.: 023456
Future Electrical Engineer PABLO DIAZ GURTIZA, JR. Validity: February 2026 2
Professional Electrical Engineer Mr. and Mrs. Graycochea
PUROK 1, DALLANGAYAN PTR No.: 2408843 Duplex type: Two Storey Dwelling Unit As Per Plan Electrical Layout
44C, Sitio 1, Biday,Csf Purok 1, Dallangayan Oeste, City of San Fernando, La Union 5
CTC No.: 02564045
OESTE, CSFLU CP No. 0923-7437568 Date Issued: 01/16/2025