The document outlines the upgrade procedures for transitioning from Vision2007R or Vision2008 to Vision2009, including both automatic and manual upgrade steps. It provides detailed instructions for necessary preparations, installation, and configuration adjustments for various machine types. Additionally, it includes a history of updates and changes made to the upgrade process over time.

Uploaded by

xjtushuyuan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

Procedure_Upgradeto2009_v5

The document outlines the upgrade procedures for transitioning from Vision2007R or Vision2008 to Vision2009, including both automatic and manual upgrade steps. It provides detailed instructions for necessary preparations, installation, and configuration adjustments for various machine types. Additionally, it includes a history of updates and changes made to the upgrade process over time.

Uploaded by

xjtushuyuan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 35

Upgrade to Vision2009

Required procedures:

- EtelTool to ComET retrofit.doc


- Plus heads on 5K series
- INSTALL VISION2007R ON PILOT MACHINE v2.doc
- Perform Head : installation and calibration
Upgrade to Vision2009

History

Version Date Author Object

1 07/01/10 Vanessa MAUSS Creation


2 09/09/10 Vanessa MAUSS Add upgrade from:
o Rev J, Rev K or Vision2007 to Vision2009
o Vision2007R to Vision2009
o Vision2009 to another Vision2009 version
o AutomaticUpgrade from Vision2007R and Vision2008
3 06/12/10 Vanessa MAUSS Add ACS manual upgrade chapter
4 08/04/11 Vanessa MAUSS Add PLC address management information
5 12/04/11 Vanessa MAUSS Add the PLC firmware upgrade information

V5 2 / 35
Upgrade to Vision2009

Contents

Upgrade from Vision2008 or Vision2007R to Vision2009................................................................. 4


1 Automatic upgrade (default) .......................................................................................... 4
1.1 Additional steps for AutomaticUpgrade from Vision2008 on 3K Plus machines ......................... 4
1.2 Common steps for AutomaticUpgrade on all machines ..................................................... 4
1.3 Import of customized parameters .............................................................................. 7
2 Manual upgrade from Vision2008 to Vision2009 (if AutomaticUpgrade fails).............................. 8
2.1 For a machine using the Plus head.............................................................................. 8
2.2 For a machine using another head ............................................................................. 24
3 Manual upgrade from Vision2007R to Vision2009 (if AutomaticUpgrade fails) ...........................25
3.1 Main steps for all the machines ................................................................................ 25
3.1.1 Rename the current C:/ProgramFiles/ViTechnology/Vision2007R folder............................... 25
3.1.2 Upgrade the PLC version......................................................................................... 25
3.1.3 Setup for the new Vision2009 version ......................................................................... 25
3.1.4 Adjust the machine configuration ............................................................................. 25
3.1.5 Import the machine parameters ............................................................................... 26
3.1.6 Copy the existing calibration file .............................................................................. 26
3.1.7 Manual calibration ................................................................................................ 26
4 Manual upgrade from Revision J, Revision K or Vision2007 to Vision2009................................27
4.1 For a machine using the Plus head............................................................................. 27
4.2 For a machine using another head ............................................................................. 27
Manual upgrade from Vision2009 to Vision2009 ..........................................................................28
1 Main steps for all the machines .....................................................................................28
1.1 Rename the current C:/VIT folder ............................................................................. 28
1.2 Upgrade the PLC version......................................................................................... 28
1.3 Upgrade the ACS version......................................................................................... 28
1.4 Setup for the new Vision2009 version ......................................................................... 28
1.5 Import the machine parameters ............................................................................... 29
1.6 Copy the existing calibration files ............................................................................. 29
PLC Manual upgrade..............................................................................................................30
1 Main steps ................................................................................................................30
2 PLC firmware upgrade .................................................................................................31
ACS Manual upgrade..............................................................................................................33
1 Save the previous version ............................................................................................33
2 Load the new version ..................................................................................................34

V5 3 / 35
Upgrade to Vision2009

Upgrade from Vision2008 or Vision2007R to Vision2009

1 Automatic upgrade (default)

In Vision2009, an AutomaticUpgrade tool has been added to simplify the upgrade from an older Vision
version (Vision2007R or Vision2008) to the new Vision2009 version.

From version 5.05.113.0, the AutomaticUpgrade tool manages the upgrade from an old
version of Vision2009 to a newer.

1.1 Additional steps for AutomaticUpgrade from Vision2008 on 3K Plus machines


For 3K Plus machines, additional steps are necessary before the AutomaticUpgrade tool can be used:

1. Uninstall Matrox: from Windows menu Programs/Matrox Imaging/ select Uninstall, then follow the
various steps until the system reboots
2. Check the Network connection to the GigE camera:
a. The Twincat connections must be unselected
b. In Internet Protocol (TCP/IP), the Ethernet Bus Network Interface card must use the address
: 1.1.1.2
3. From Windows menu Programs/Cognex/CVL/Utilities/, launch the Cognex GigE Vision Configuration
Tool.
a. The camera address must be set to : 1.1.1.1
b. The Performance drivers must be installed by clicking on the “Set Performance Driver”
button.

Then the common steps can be performed.

The detailed procedure for Network Connection settings and Cognex GigE Vision Configuration
Tool use is available in the pages 14 to 17 of the Plus head installation and calibration
procedure (IA-0028-Rev3.odt).

1.2 Common steps for AutomaticUpgrade on all machines

To use the AutomaticUpgrade tool, please:

1. Install the recommended PLC version which is specified in the release note on chapter 7.1.
2. Create a backup of the old version installed by renaming the C:/VIT or C:/Program
Files/ViTechnology/Vision2007R folder into a C:/VIT_old folder or C:/Program
Files/ViTechnology/Vision2007R_old folder.
3. Launch the full Vision2009 setup and follow the various step until the completion

4. Launch the AutomaticUpgrade.exe software located under the C:/VIT folder: the Welcome screen
appears. Click on the Next button to move on to the next step: the Define configuration folder
window appears.

5. Select the path to the Config folder for the old version (C:/VIT_old/Config or C:/Program

V5 4 / 35
Upgrade to Vision2009

Files/ViTechnology/Vision2007R_old/config)

6. Select the path to the config folder for the freshly installed Vision2009 version (C:/VIT/Config by
default).

7. Click on the Next button to move on to the next step: the Upgrade wizard window appears, and
the upgrade process is automatically launched. The following operations will be achieved:

o Retrieve the machine configuration and set it correctly in Vision2009

o Upgrade the Etel drivers (if needed)

o Retrieve the Lighting offsets values and set it correctly in Vision2009

o Retrieve the zero machine values and set it correctly in Vision2009

o Retrieve the calibration information and set it correctly in Vision2009


o Retrieve the ID readers configuration and set it correctly in Vision2009

o Copy the AvCorrespondanceTable.ini and the calib.map files to the new Vision2009 version
(if available).

At the moment, the axes position limits are not automatically upgraded. They must be set
manually by the user.

At the end of the wizard, a green tick appears in front of the successful upgrade steps.
A red cross is displayed if some steps fail.

V5 5 / 35
Upgrade to Vision2009

8. Click on the Next button to move on to the next step: the Upgrade status window appears, that
contains the global status for the upgrade. If the upgrade fails, the following message will be
displayed.

If the automatic upgrade fails, then please redo manually the Manual upgrade steps
described in chapter 2 and 3.

V5 6 / 35
Upgrade to Vision2009

1.3 Import of customized parameters


The following files contain the customized parameters, and thus can be copied from the older Vision version
to the Vision2009 version:
- defaultvalue.ini file
- vit.cfg file
- ConfigSupervisor.ini file (for an upgrade from Vision2008 only)
- ConfigDefectViewer.ini file (for an upgrade from Vision2008 only)

In previous versions, 2 different configuration files (DefectViewer.prm and


DefectViewer1.prm) were created for the DefectViewer when 2 lines of buttons were used.
From version 5.05.113.0, the DefectViewer1.prm only must be imported and must be
renamed into DefectViewer.prm.

V5 7 / 35
Upgrade to Vision2009

2 Manual upgrade from Vision2008 to Vision2009 (if AutomaticUpgrade fails)

2.1 For a machine using the Plus head


The main steps to upgrade an AOI machine from Vision2008 to Vision2009 are the following:

1. Unistall GigE
2. Unistall Matrox
3. Backup the current Vision2008 folder
4. Upgrade the Etel drivers to ETEL PCI Board 2
5. Upgrade the PLC version
6. Install Vision2009
7. Configure Cognex
8. Adjust the machine configuration

2.1.1 Unistall GigE filters

Double click on the network icon on the bottom right


corner of the screen that corresponds to the Gige
connection.

In the GiGE Connection Status window, click on the Properties


button.

Highlight Matrox GigE Vision Filter Driver line and then


click on
the Uninstall button.

V5 8 / 35
Upgrade to Vision2009

Answer Yes to the confirmation message.

Then close the GIGE Connection Properties window by clicking


on the Close button.

2.1.2 Unistall Matrox

Click on the Start\All Programs\Matrox Imaging\Uninstall.

V5 9 / 35
Upgrade to Vision2009

Wait and then click Yes to uninstall.

Click on the OK button.

The Matrox unistallation is on going.

Please wait.

The Matrox unistallation if finished.

Keep ‘Yes, I want to restart my computer


now.’ Ticked and then click on the Finish
button.

V5 10 / 35
Upgrade to Vision2009

2.1.3 Backup Vision2008 version


Because Vision2008 and Vision2009 are installed under the same C:/VIT folder by default, it is necessary to
create a backup of the current Vision2008 version before installing Vision2009.
• Please open a Windows Explorer
• Then rename the C:/VIT folder into C:/VIT_Vision2008
Vision2009 can now be installed.

2.1.4 Upgrade the Etel drivers


Please follow the steps described in the following procedure: EtelTool to ComET retrofit.doc

2.1.5 Upgrade the PLC version


Install the recommended PLC version which is specified in the release note on chapter 7.1.

Please refer to the Maintenance Manual for the detailed PLC upgrade process.

In order to avoid conflicts with other parts, the IP address for the PLC network connection
must be changed to:
192.168.30.x where x is different from 1

Problems may appear at Vision2009 startup if the installed PLC version and the PLC network address do
not match these requirements.

2.1.6 Install Vision2009


To install Vision2009, please do the following:

• Insert the installation CD or open the setup folder that has been downloaded from the network.
• Double click on the Vision2009_v5.04.xx.xx.exe file, where v5.04.xx.xx represents the version
number.
• Please wait while the Setup is loading
• When the Vision2009 setup window appears, click on the Next button

V5 11 / 35
Upgrade to Vision2009

• In the License Agreement window, tick the “I accept the terms of the License Agreement”
checkbox, and then click on the Next button.

• In the Choose Install Location window, select the destination folder where Vision2009 must be
installed, then click in the Next button. By default, Vision2009 will be installed under the C:/VIT
folder.

• In the Choose Components window, select the type of installation that needs to be performed:
- Vision machine setup installs all the necessary feature to have Vision2009 fully operational
- Supervisor & Defect Viewer setup installs the Supervisor and the DefectViewer application,
along with a supervisor database management tool
- DatabaseServer (MSDE 2000) setup installs the MDSE 2000 server that is required to run the
databases used in Vision2008
- All setup installs all the components onto the machine.
Please select one type of setup and then click on the Next button

By default, the Vision machine setup is selected.

V5 12 / 35
Upgrade to Vision2009

• In the Enter MSDE Password window, input the MSDE password necessary for database
administration. By default we recommend setting it to “VIT”. Then click on the Next button.

• Vision2009 and all the selected components are now being installed on the computer.
At any moment, it is possible to display the details of the installation progress by clicking on the Show
details button.

V5 13 / 35
Upgrade to Vision2009

• The Matlab environment setup will be launched automatically.

• Select the operation to perform, then click on the Next button.

• Then select the features that need to be installed, and click on the Next button.

V5 14 / 35
Upgrade to Vision2009

• Then click on the Install button to launch the installation process.

• When the installation completes, click on the Finish button to close the Matlab runtime installer
and go back to Vision setup.

V5 15 / 35
Upgrade to Vision2009

• As the MSDE server has already been installed on the PC with Vision2008, the following message
will be displayed.
Later on, another message can appear to explain that the ModelDatabase have not been copied as they
already exist (they have also been installed by Vision2008).

• Then the setup completes. Click on the Finish button to exit.

If a problem appears when launching Vision2009, please check that the Environment variable
Vision_System_Root is correctly set to C:\VIT\.

2.1.7 Configure Cognex


To configure Cognex, please refer to the installation procedure for Plus heads on 5K series (IA-0028),
chapter 1.5.2.

2.1.8 Adjust the machine configuration

To ensure correct AOI system functioning, the hardware configuration must be properly set when starting
Vision2009 for the first time.
A user friendly interface, accessible when starting VisionSetup.exe application, gives access to the AOI
system configuration.

V5 16 / 35
Upgrade to Vision2009

.2.1.8.1 Select the machine configuration


In the VisionSetup, please select the Standard machine configuration corresponding to the AOI machine
where Vision2009 has been installed.

All settings are saved in the ViHardwareConfiguration_xxxx.ini file, where xxxx represents the
selected machine configuration.

.2.1.8.2 Define the lighting offsets

With Vision2009, it is necessary to have the lighting offsets defined in the ViHardwareConfiguration_xxxx.ini
file.
To define the lighting offsets for the machine, please use the INSTALL VISION2007R ON PILOT MACHINE
v2.doc procedure.

Then input the lighting offsets in the IOManager/IO driver section of the VisionSetup:
Error Offset=lightType1=0|lightType2=0|lightType3=0|lightType4=0

.2.1.8.3 Set the zero machine

Once Vision2009 is installed, it is necessary to set again the zero machine.

Please do the following:


1. Launch Vision2009
2. Click on the Axis measurements button on the toolbar to launch the Axis and Conveyor toolbox
window
3. Move the camera over the bottom right corner of the board that is clamped

V5 17 / 35
Upgrade to Vision2009

4. Then click on the Set zero machine button.

.2.1.8.4 Calibrate the machine

Once the software is installed, and lighting offsets are correctly configured, the calibration must be re-
done. Automatic calibration procedures have been introduced in Vision 2009.

The grey level calibration parameters appear in the ViHardwareConfiguration_xxxx_Calib.ini


file as soon as Vision2009 is launched for the first time.

Please make sure to reopen the ViHardwareConfiguration_xxxx_Calib.ini file after Vision2009


is launched to be able to modify the Grey Level and Focus calibration parameters.

Identify the type of lens used on the machine


Two different lenses can be used in the machines. To follow the calibration steps bellow, it’s very
important to know witch is the used lens type.
The ViSO lens is equipped with a metallic plate and 5 screws as shown
on the bellow picture. This is not the case for the ViNO lens.

Set the software parameters


Open the ‘ViHardwareConfiguration_Vixxx_xxxx_Calib.ini’ file located in the folder C:\VIT\Config (where
Vixx_xxx represent the type of machine used and the corresponding head) and go to the L1 to L4 reference
lines (see screenshot below).

Choose the right colors (cf. above picture)


L1 = Axial green
L2 = Axial red
L3 = Circular green
L4 = Circular blue

Following value XXX written on the Grey tool (GL Tool) enter circular green and circular blue as per below
chart:

V5 18 / 35
Upgrade to Vision2009

For example:
For a grey tool of 146
Green circular value is: 185
Blue circular value is: 249

Check the tool angle

• Start vision software.


• In Tools\Maintenance menu, click on ‘test machine’ then on icon ‘Calibration’ icon.
• Adjust Glass tool angle in order for it to be included between -0.001° and +0.001°. To do that, tap
on the tool’s edges to make it turn into the conveyor. After each tool angle modification, click
‘Measure’ to check the new angle.

Automatic Grey Level calibration


An automatic grey level calibration has been introduced in this version. It is recommended for all heads,
except for those using the Hitachi KPF100 camera.
By default, the Automatic grey level calibration mode is selected.

The type of calibration used (manual or automatic) is configurable in the [Calibration grey calibration]
section of the ViHardwareXConfiguration_xxxx_calib.ini file.
[Grey calibration]
Adjustment parameter (0: manual method, 1: camera exposure time, 2:automatic method) = 2

// 0 = manual calibration active


// 2 = auto calibration active

When a grey level calibration is made, do not open the diaphragm even if measures seem to
be incorrect.
Try first to click on “Auto Calibration” button: the calibration should pass.

V5 19 / 35
Upgrade to Vision2009

Start Vision software and go in Tools\Calibration\Grey levels and click ‘Auto calibration’.

If the ‘Automatic setting has failed’ message


is displayed, click ‘OK’ and open little bite
the diaphragm. Never go outside the
hatching part.

Then restart the grey calibration.

Once the calibration achieved, ‘Calibration OK’ message is displayed, click


‘OK’.

Click ‘OK’ to close the ‘Light adjustment’ window. The calibration is finish.

Automatic Focus calibration


By default, the Automatic focus calibration mode is selected.

• Open C:\Program Files\ViTechnology\VisionXXX\Config\ViHardwareConfiguration_XXXX_Calib.ini file


and go to the [Focus Optimization] chapter.

• Regarding the used lens, the values indicated in the bellow table must be set in ‘1’ and ‘2’ position
of the ini file.

V5 20 / 35
Upgrade to Vision2009

• The #3 parameter ‘Use new focus calibration’ must be set to ‘1’ (default value). If it’s set to ‘0’
(zero), the focus optimizer is not activated and the old focus adjustment method is used.

• If one of those values has been modified, it’s necessary to restart the vision software.

• In the vision software, start the focus calibration in ‘Tool\Calibration’ and press ‘Focus’ button. The
bellow window is displayed. In this window, 2 parts are displayed, the ‘A’ part is to move the axis
and the ‘B’ one is for the focus itself.

In a first strep, position the axis as shown on the bellow picture. The red vertical line must be aligned with
the black scare and the red circle must be tangent with the bottom side of the black scare.

V5 21 / 35
Upgrade to Vision2009

Once the camera is in a correct position, click on the ‘Start’ button. Several lines are displayed on the
screen:
- Blue line: indicate the theoretical focus position;
- Orange lines: show the min and max focus tolerances;
- Red or green line: shows the real focus position. Red color means bad focus and green color means go
focus.

If the focus is not good, ie the red line is outside the two orange lines, it’s necessary to adjust the focus by
moving up or down the lens/camera group. Nota: the picture above shows ViNO lens but it’s exactly the
same think with ViSO lens.

V5 22 / 35
Upgrade to Vision2009

The above picture shows a good focus. Once the focus ok, tighten all screws and click ‘Stop’ and ‘Exit’
button.

For more details about this calibration procedure, please refer to the Perform Head
installation and calibration procedure.

.2.1.8.5 Configure the MSDE settings


Because the MSDE server has already been installed by the Vision2008 setup, it is not installed by the
Vision2009 setup.

The same thing happens for the ModelDatabase files: as they have already been installed and used with
Vision2008 (for MatchMaker among other things), they will not be replaced by the Vision2009 setup.

Consequently, it is necessary to configure manually the database settings after the upgrade from Vision2008
to Vision2009:
• Launch Vision2009
• Go to menu Tools/Models database: the Model Correspondance Table configuration window
appears.
• Click on the Database Settings button: the Model Database popup appears.
• In this window, the following parameters must be set:
- the name of the MS-SQL server in which the Model Database is stored (by default, it is set to
localhost by the setup)
- the login parameters (user name and password) required to access this server (by default, it
should be set to User ‘sa’ and Password ‘VIT’).
- the name of the database used as the Models Database.

• Then click on the OK button to connect to the selected database. The user will be returned to the
Model Correspondence table configuration window, where a Database connection OK message
should be displayed in green.

• Click on the Add button to add the VIT Standard Library located under the C:/VIT folder to the
Correspondence Table.

- The Database list box only displays databases available on the selected server.
- By default, Vision2008 and Vision2009 setups are installing a database named
ModelsDatabase on the server ‘localhost’.

V5 23 / 35
Upgrade to Vision2009

.2.1.8.6 Configure the Supervisor


The Supervisor software can be installed with the Vision2009 setup. The configuration is done during the
first startup. To configure the Supervisor software, please do the following:

- On the Supervisor PC, launch the Supervisor.exe located under the C:/VIT/ folder
- In the .INI file creation window, define the folder where the images sent by the AOI machine after
inspection should be stored.
- Then select the database settings: by default, an access database has been created and attached
to the server.
- Then define the archive settings and click on the OK button: the Supervisor main screen appears
and the application is correctly configured.

We highly recommend to install the same software version on Vision, Supervisor and
DefectViewer tools.

.2.1.8.7 Configure the Repair station


The DefectViewer software can be installed with the Vision2009 setup. The configuration is done during the
first startup. To configure the Repair software, please do the following:
- On the Supervisor PC, launch the repair.exe located under the C:/VIT folder
- In the Folders Configuration window, define the folders where data should be stored
- Then in the Main buttons menu, define the sanction and icon associated to each of the general
screen command key
- Then in the Details buttons menu, define the sanction and icon associated to each of the details
screen command key
- Then in the Network Access Configuration window, define the Server name in which the Supervisor
database is stored, and click on the OK button: the Repair main screen appears and the application
is correctly configured.

2.2 For a machine using another head


The main steps to upgrade an AOI machine from Vision2008 to Vision2009 are the following:

2. Backup the current Vision2008 folder (as described in chapter 2.1.3)


3. Upgrade the Etel drivers to ETEL PCI Board 2 (as described in chapter 2.1.4)
4. Upgrade the PLC version (as described in chapter 2.1.5)
5. Install Vision2009 (as described in chapter 2.1.6)
6. Adjust the machine configuration (as described in chapter 2.1.8 )

V5 24 / 35
Upgrade to Vision2009

3 Manual upgrade from Vision2007R to Vision2009 (if AutomaticUpgrade fails)

3.1 Main steps for all the machines


The main steps to upgrade an AOI machine from a Vision2007R version to another Vision2009 version are the
following:

1. Rename the current C:/ProgramFiles/ViTechnology/Vision2007R folder


2. Upgrade the PLC version
3. Launch the setup for the new Vision2009 version
4. Adjust the machine configuration
5. Import the machine parameters
6. Copy the existing calibration files
7. Manual calibration

3.1.1 Rename the current C:/ProgramFiles/ViTechnology/Vision2007R folder


The Vision2007R versions are installed by default under the C:/ProgramFiles/ViTechnology/Vision2007R
folder. However, if the user has modified this installation path, a C:/VIT folder may already exist at the
moment when the Vision2009 setup is launched.

As customized configuration files must not been overwritten by empty files, the existing C:/VIT/Config
folder will never been replaced by new files coming from the new setup.
It means that major changes made on these configuration files, that go together with major changes made
on the software, won’t be applied. This may cause problem at Vision2009 startup.

To avoid problems at Vision2009 startup, we recommend to rename the former C:/VIT folder into
C:/VIT_xxxx before the setup of the Vision2009 version is launched.

3.1.2 Upgrade the PLC version


Install the recommended PLC version which is specified in the release note on chapter 7.1.

Please refer to the Maintenance Manual for the detailed PLC upgrade process.

In order to avoid conflicts with other parts, the IP address for the PLC network connection
must be changed to:
192.168.30.x where x is different from 1

Problems may appear at Vision2009 startup if the installed PLC version and the PLC network address do
not match these requirements.

3.1.3 Setup for the new Vision2009 version


The new version of Vision2009 is ready to be installed under the C:/VIT folder.

Please refer to the chapter 2.1.6 for the complete setup installation procedure.

3.1.4 Adjust the machine configuration


From the VisionSetup, select the machine configuration to use, as described in chapter 2.1.8

V5 25 / 35
Upgrade to Vision2009

3.1.5 Import the machine parameters


In Vision2009, the VisionSetup interface has been introduced to easily manage the machine configuration
and customization.
All the modifications made by the user from this VisionSetup interface are stored under the
ViHardwareConfiguration_xxxx.ini file on the C:/VIT/Config folder.

As main changes may have been applied to the default ViHardwareConfiguration_xxxx.ini files, the user
must merge its customized parameters into the new version of the file using the Import Parameters
function.

To importthe customized parameter into the machine configuration file, please:


- launch the VisionSetup.exe tool
- Click on the Import Parameters button located at the bottom of the screen
- Select the ViHardwareConfiguration_xxxx.ini file for Vision2007R version on which customized
parameters have been set: the list of customized parameters retrieved in the selected file will
be displayed
- The user can then select which parameters needs to be imported in the new Vision2009
configuration file, before clicking on the Import button.
All the selected Parameters will be automatically imported in the new Vision2009
ViHardwareConfiguration_xxxx.ini file.

3.1.6 Copy the existing calibration file


The following file does not change between Vision2007R and Vision2009. Consequently, it can be copied
manually from the C:/ProgramFiles/ViTechnology/Vision2007R/Config folder to the new C:/VIT/Config
folder:
- the calib.map file

3.1.7 Manual calibration


As the corresponding files cannot be directly copied from the previous Vision2007R version to the new
Vision2009 version, the following operations must be done manually:
- Set the zero machine, as described in chapter .2.1.8.3
- Calibrate the machine, as described in chapter .2.1.8.4

Once these steps are done, Vision2009 can be launched.

V5 26 / 35
Upgrade to Vision2009

4 Manual upgrade from Revision J, Revision K or Vision2007 to Vision2009

4.1 For a machine using the Plus head


The main steps to upgrade an AOI machine from Revision J, Revision K or Vision2007 to Vision2009 are the
following:

1. Uninstall GigE (as described in chapter 2.1.1)


2. Uninstall Matrox (as described in chapter 2.1.2)
3. Uninstall the Vision version and the CVL drivers (as described in chapter 4.1.1)
4. Backup the current C:/VIT folder (as described in chapter 2.1.3)
5. Upgrade the Etel drivers to ETEL PCI Board 2 (as described in chapter 2.1.4)
6. Upgrade the PLC version (as described in chapter 2.1.5)
7. Install Vision2009 (as described in chapter 2.1.6)
8. Configure Cognex (as described in chapter 2.1.7)
9. Adjust the machine configuration (as described in chapter 2.1.8)

4.1.1 Uninstall the Vision version and the CVL drivers


To uninstall the Vision version and the CVL drivers, please do the following:
- Open the Windows control panel, then select Add/Remove programs menu
- Remove the following applications:
ViTechnology - Vision System App ( = VIT software AVision or Vision2006)
ViTechnology - Vision CVL drivers ( = Cognex drivers)

4.2 For a machine using another head


The main steps to upgrade an AOI machine from Revision J, Revision K or Vision2007 to Vision2009 are the
following:

1. Uninstall the Vision version and the CVL drivers (as described in chapter 4.1.1)
2. Backup the current Vision2008 folder (as described in chapter 2.1.3)
3. Upgrade the Etel drivers to ETEL PCI Board 2 (as described in chapter 2.1.4)
4. Upgrade the PLC version (as described in chapter 2.1.5)
5. Install Vision2009 (as described in chapter 2.1.6)
6. Adjust the machine configuration (as described in chapter 2.1.8 )

V5 27 / 35
Upgrade to Vision2009

Manual upgrade from Vision2009 to Vision2009

1 Main steps for all the machines


The main steps to upgrade an AOI machine from a Vision2009 version to another Vision2009 version are the
following:

1. Rename the current C:/VIT folder


2. Upgrade the PLC version
3. Launch the setup for the new Vision2009 version
4. Import the machine parameters
5. Copy the existing calibration files

1.1 Rename the current C:/VIT folder


The Vision2009 versions are installed by default under the C:/VIT folder. Consequently, if a version of
Vision2009 has already been installed at the moment the Vision2009 setup is launched, a C:/VIT folder
already exists.

As customized configuration files must not been overwritten by empty files, the existing C:/VIT/Config
folder will never been replaced by new files coming from the new setup.
It means that major changes made on these configuration files, that go together with major changes made
on the software, won’t be applied. This may cause problem at Vision2009 startup.

To avoid problems at Vision2009 startup, we recommend to rename the former C:/VIT folder into
C:/VIT_xxxx before the setup of the new Vision2009 version is launched.

1.2 Upgrade the PLC version


Install the recommended PLC version which is specified in the release note on chapter 7.1.

Please refer to the Maintenance Manual for the detailed PLC upgrade process.

In order to avoid conflicts with other parts, the IP address for the PLC network connection
must be changed to:
192.168.30.x where x is different from 1

Problems may appear at Vision2009 startup if the installed PLC version and the PLC network address do
not match these requirements.

1.3 Upgrade the ACS version


Install the recommended ACS version which is specified in the release note on chapter 7.2.
Please refer to the ACS Manual Upgrade chapter below for the detailed ACS upgrade process.

1.4 Setup for the new Vision2009 version


The new version of Vision2009 is now ready to be installed.

Please refer to the chapter 2.1.6 for the complete setup installation procedure.

V5 28 / 35
Upgrade to Vision2009

1.5 Import the machine parameters


In Vision2009, the VisionSetup interface has been introduced to easily manage the machine configuration
and customization.
All the modifications made by the user from this VisionSetup interface are stored under the
ViHardwareConfiguration_xxxx.ini file on the C:/VIT/Config folder.

As main changes may have been applied to the default ViHardwareConfiguration_xxxx.ini files, the user
must merge its customized parameters into the new version of the file using the Import Parameters
function.

To importthe customized parameter into the machine configuration file, please:


- launch the VisionSetup.exe tool
- Click on the Import Parameters button located at the bottom of the screen
- Select the reference configuration file on which customized parameters have been set: the list
of customized parameters retrieved in the selected file will be displayed
- The user can then select which parameters needs to be imported in the new configuration file,
before clicking on the Import button.
All the selected Parameters will be automatically imported in the new
ViHardwareConfiguration_xxxx.ini file.

1.6 Copy the existing calibration files


The following files do not change between one version of Vision2009 and the others. Consequently, they can
be copied manually from the C:/VIT_xxx/Config folder to the new C:/VIT/Config folder:
- the calib.map file
- the defaultvalue.ini file
- the MachineRelease Vision2009.PRM file
- the AvCorrespondanceTable.ini file
- the calibration files:
o Release_M_Calibration_Distorsion.dat
o Release_M_ Calibration_Grey_Level.dat
o Release_M_ Calibration_Pixel.dat
o ViHardwareConfiguration_xxxx_calib.ini file
- If the 3DSelective option is installed on the machine, the following file can also be copied:
o CalibTreatmentCoplanarity.dat file

The following file can also be copied from the C:/VIT_xxx/ folder to the new C:/VIT/ folder:
- the vit.cfg file

If Supervisor and DefectViewer are used, the following files can also be copied from the C:/VIT_xxx/ folder
to the new C:/VIT/ folder:
- The ConfigSupervisor.ini file
- The ConfigDefectViewer.ini file

Once these steps are done, Vision2009 can be launched.

In previous versions, 2 different configuration files (DefectViewer.prm and


DefectViewer1.prm) were created for the DefectViewer when 2 lines of buttons were used.
From version 5.05.113.0, the DefectViewer1.prm only must be imported and must be
renamed into DefectViewer.prm.

V5 29 / 35
Upgrade to Vision2009

PLC Manual upgrade

1 Main steps
To upgrade the PLC, you must:
- have a serial cable plugged to the PLC serial port
- Launch the PVITransfer.exe tool
- Select the menu File/Open and select a .pil file (example for version v18: vi5kv18.pil)
- Once the selected file is loaded, the following window will appear:

Note: If the reset line is not present at the end of the .PIL (like in this case), add it by clicking on the icon
“coldrestart”.

- Send the program to the PLC by pressing the Red exclamation mark button.
- The following message box will appear:

- Click on the Yes button.


- The operation will take some time.

If the installed PLC version is not the one that Vision2009 is expecting, an error will be
displayed in the log file, explaining what the expected version and currently installed
version are.

V5 30 / 35
Upgrade to Vision2009

2 PLC firmware upgrade

From the PLC version 1.17, a PLC firmware upgrade is needed when upgrading the PLC
software.

To upgrade the PLC firmware together with the PLC version, please do the following:

1. Push the button “emergency stop”


2. Open the PVI Transfert tool and load the appropriate .pil file (as described on the maintenance
manual)
3. Click on the button “execute” to upload the .pil file: a process window opens and the PLC loading
starts

4. Wait for the end of the loading process. The message “Process Finished (success)…” is displayed to
indicate that the new PLC program has been correctly loaded.
5. Click on the Close button
6. Push the Power ON (Green) button on the machine
7. Load the ResetPLC.pil file
8. Click on the button “execute” to upload the .pil file: the PLC reboots and downloads the new
firmware on stepper modules. During the download, the LEDs of the PLC module CPU are orange.

9. Don’t cut the power until downloading is finished. Downloading can take from 20 to 30 minutes:
please be patient.

At the end of the downloading, the LEDs of the PLC module CPU are green.

V5 31 / 35
Upgrade to Vision2009

Once the new firmware has been updated a first time, there is no need to redo this special
procedure for future PLC upgrades.

V5 32 / 35
Upgrade to Vision2009

ACS Manual upgrade

1 Save the previous version


On a vision machine which has the last version of the ACS buffers, open SPiiPlus MMI software.
Connect to the ACS controller, and click on Program manager.
Click on the menu Buffers > Save To File

Check that all the buffers are selected:

And then click on the Save button => a file.prg will be created

V5 33 / 35
Upgrade to Vision2009

2 Load the new version

Open SPiiPlus MMI.


Connect to the ACS controller, and click on Program manager.
Click on the menu Buffers > Load From File

Click OK on the next screen:

Then click the menu Buffers > Save To Flash:

V5 34 / 35
Upgrade to Vision2009

And click Save on the next screen:

Then select Application/Restart