Korporeeshiinii Injineeringii Oromiyaa Engineering Corporation of Oromia
Korporeeshiinii Injineeringii Oromiyaa Engineering Corporation of Oromia
:
Logo
Korporeeshiinii Injineeringii Oromiyaa
የኦሮሚያ ኢንጂነሪንግ ኮርፖሬሽን OF/ECO/TBUP/CACS/003
Engineering Corporation of Oromia
Form Title: Issue No: Page No:
Contractor's Construction Work Requisition Approval Form 1 Page 1 of 2
Project Name___________________________________________________
Extent of Work______________________________________
Location ___________________________________________
The work will be ready for inspection on
Date ______________________ Time _____________
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE
Company Name: Form No.:
Logo
Korporeeshiinii Injineeringii Oromiyaa
የኦሮሚያ ኢንጂነሪንግ ኮርፖሬሽን OF/ECO/TBUP/CACS/003
Engineering Corporation of Oromia
Form Title: Issue No: Page No:
Contractor's Construction Work Requisition Approval Form 1 Page 2 of 2
Comment of the Engineer (with respect to weather condition, availability of proper and adequate
manpower, construction Material, Machinery, Equipments and fulfillment of all prerequisite tasks to
be done for executing the requested work).
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
_____________________________________________________________________________
Decision on requested work: - Accepted___________________ Rejected___________________
Note: - Failure to satisfy any of the above stated requirements will result in rejection of the request.
And new requisition shall be submitted after correcting the comments given by the engineer.
The inspection should be completed at least one day before planned work execution date
This form shall be submitted with work methodology and list of available Logistics
PLEASE MAKE SURE THAT THIS IS THE CORRECT ISSUE BEFORE USE