0% found this document useful (0 votes)
7 views2 pages

10157866 (1)

The document is an application for the installation of a 2.2 kW solar PV system under the CAPEX model by Kantilal Patel, with D R Enterprise as the installer. It includes details about the project, the applicant's declaration of responsibility, and acknowledgment of the Gujarat Renewable Energy Policy – 2023. The applicant confirms that GEDA is not liable for any issues arising from the installation or operation of the solar PV system.

Uploaded by

rahul.dre3029
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views2 pages

10157866 (1)

The document is an application for the installation of a 2.2 kW solar PV system under the CAPEX model by Kantilal Patel, with D R Enterprise as the installer. It includes details about the project, the applicant's declaration of responsibility, and acknowledgment of the Gujarat Renewable Energy Policy – 2023. The applicant confirms that GEDA is not liable for any issues arising from the installation or operation of the solar PV system.

Uploaded by

rahul.dre3029
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

GEDA Application No GUJ/RT/RES/10157866 Application Date 16.10.

2024

Solar PV Plant Detail


Solar PV Capacity (AC) to be Installed (kW) 2.2
Plant DC Capacity to be Installed (kW) 2.16
Existing DC Capacity to be Installed (kW) 1.980
Existing AC Capacity to be Installed (kW) 2

Installer/ Channel Partner Detail


Installer D R ENTERPRISE Contact No. 7990689506
Contact Detail
Mr. PARESHBHAI
CustomerName Email [email protected]
KANTILAL PATEL
Mobile 9099063845 Landline No
33-KARNAVATI TENAMENT, B/H KARMAYOG-I,NR.SAIDHAM SOCIETY,
Address
MAHADEV NAGAR TEKRA, VASTRAL, AHMEDABAD. AHD AHD
City AHD State Gujarat
Communication
Pincode 382418 Same As Address
Address

Bill Details
DisCom Name Torrent Power Ahmedabad
Consumer NO. 1416643 Division/Zone Odhav-OD
Category
Sanctioned /Contract Load (in kW) 3.000 Residential
Tariff
Phase of Inverter Single Phase Who will provide net meter? DisCom
Is the Applicant a Government Agency? No
Is the Applicant a MSME? No

Yes, I am applying for installation of solar PV system under the CAPEX mode.

Page 1 of 2
Declaration:

1. I (name and designation) _____________________________________ authorized representative of


Mr. PARESHBHAI KANTILAL PATEL declare that information filled in the application form is true and
correct to my knowledge and GEDA is not responsible for providing land, the power evacuation andwater
supply, for the operation/maintenance of the power evacuation facilities and its uninterruptedfunctioning.
Further that GEDA is absolved from any loss that may occur on account of failure of the
substation/transmission line and/or non-performance of any system of the project etc. I have read and
understood and shall abide by the provision of the Gujarat Renewable Energy Policy – 2023 vide
Government of Gujarat GR no. REN/e-file/20/2023/0476/B1 dated 4th October 2023. The solar Rooftop
Project shall be installed under CAPEX model only with the ownership of premises and Solar Rooftop of
the undersigned. I am aware that any other model for installation of Solar Rooftop System other than
CAPEX model is not applicable under the provision of Gujarat Renewable Energy Policy – 2023.

2. The entire electrical safety, structural stability and performance of the system shall be the entire
responsibility of the Applicant and GEDA shall be absolved of any responsibility whatsoever that may
arise during the lifespan of the solar PV system.

UNDERTAKING: I hereby agree that:

1. This Project is registered under the Capital Expenditure (CAPEX) mode, where the solar PV system is
owned by me and electricity generated is used by ME.

2. I have on my OWN selected the Installer upon due diligence and have mutually agreed with the terms
and conditions amongst ourselves.

3. I am aware that GEDA has no role whatsoever in the selection of the Installer/Vendor and thus GEDA
is not responsible for INSTALLER’s technical and financial capabilities, quality and integrity, any kind of
delay; financial or technical loss, quality and standards of the system and its components; theft, financial
transaction done or any criminal assault occurred because of the selection of the Installer.

4. I am fully responsible for the Solar PV system that will be installed under this application.

5. I am aware that the Gujarat Renewable Energy Policy – 2023 & GERC Net Metering Regulations from
time to time and its amendments thereof, if any under which this project is registered does not have any
provision of subsidy or financial assistance.

6. I agree to abide by the provisions of the Gujarat Renewable Energy Policy – Renewable Energy of the
Government of Gujarat & GERC Net Metering Regulations from time to time and its amendments
thereof, if any.

(Signature of Applicant and seal of the


Organization)

Page 2 of 2

You might also like