Cables

The document outlines the inspection process for cable installation, detailing various checks such as verifying cable type, labeling, mechanical protection, terminations, and earthing. It includes a section for recording inspection results, test equipment used, and signatures from project and QA/QC representatives. The document serves as a checklist to ensure compliance with specifications and standards during the installation of cables.

Uploaded by

appu pocom3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2 views

Cables

The document outlines the inspection process for cable installation, detailing various checks such as verifying cable type, labeling, mechanical protection, terminations, and earthing. It includes a section for recording inspection results, test equipment used, and signatures from project and QA/QC representatives. The document serves as a checklist to ensure compliance with specifications and standards during the installation of cables.

Uploaded by

appu pocom3
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Installation of Cables

ITP Reference No: Project No :


Project: Tag Description:
Tag No : Drawing No :
Sheet ID:

Volts: Type Cores: Size:


From: To::

Item Inspection Results


Inspection Description
No.: Value / Status Initials Date
Verify that the Cable is the correct type and size as specified
1
in the cable schedule
Verify that the labelling and I.D tags for the cables are
2
correct.
Verify the Dressing / Cleating Check of Internal Connection
3
Parts
4 Verify that the Cable is Mechanically protected
5 Confirm that the Terminations are done correctly
Perform Continuity Check on each conductor, including the
6
shield
7 Confirm that the Glanding and Locknuts are installed properly
8 Confirm that the Cable bending radius is satisfactory
9 Earthing in accordance with specification
10 Screen correctly made off
Confirm spare core and screens are earthed and conform to
11
drawings and spec.

Test Equipment Used:


Make: Model: Serial No.: Expiry Date:

Make: Model: Serial No.: Expiry Date:

Make: Model: Serial No.: Expiry Date:

Remarks:

Project Engineer/ Site Engineer QA/QC Representative Client Representative

Name: Name: Name:


Sign: Sign: Sign:
Date:
Date: Date: