0% found this document useful (0 votes)
14 views1 page

3 Storey House Renovation Rev1.3 Electrical BOM For OBO

The document provides a detailed cost estimate for electrical works in a 3-storey residential house located at 26-G. Raymundo St. Brgy. Malinao Pasig City, owned by Mrs. Sally Habito Galang. The total material cost for the electrical works amounts to P 181,758.92, with a breakdown of various components and their respective costs. No unit cost or quantity is specified for the overall project.

Uploaded by

Rafael Obusan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

3 Storey House Renovation Rev1.3 Electrical BOM For OBO

The document provides a detailed cost estimate for electrical works in a 3-storey residential house located at 26-G. Raymundo St. Brgy. Malinao Pasig City, owned by Mrs. Sally Habito Galang. The total material cost for the electrical works amounts to P 181,758.92, with a breakdown of various components and their respective costs. No unit cost or quantity is specified for the overall project.

Uploaded by

Rafael Obusan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DETAILED COST ESTIMATES

DERIVATION OF UNIT COST Date:

Project Name: 3-Storey Residential House Unit Cost/set : n/a


Assumed Qty.: n/a
Item Address: 26-G. Raymundo St. Brgy. Malinao Pasig City

Owner: Mrs. Sally Habito Galang

Work Description : 1.) Electrical Works

DESCRIPTION/COMPUTATION UNIT QUANTITY UNIT COST AMOUNT


B-1. MATERIAL COST: (Electrical)
Main Distribution Panels (1-Main/18-branches) assy. 1.00 29,250.00 29,250.00
THHN 2-14.0mm 2 lm. 50.00 109.10 5,455.13
THHN 1-5.5mm 2 green lm. 25.00 76.46 1,911.49
THHN 2.0mm 2 lm. 900.00 56.16 50,544.00
THHN 3.5mm 2 lm. 600.00 79.56 47,736.00
Utility box & Junction boxes pcs 180.00 76.05 13,689.00
IMC pipe 1" with accessories pcs 7.00 953.26 6,672.80
PVC orange 3/4" pcs 20.00 137.48 2,749.50
PVC orange 1/2" pcs 100.00 108.23 10,822.50
PVC adaptor 3/4" pcs 50.00 29.25 1,462.50
PVC adaptor 1/2" pcs 400.00 23.40 9,360.00
Electrical tape pcs 30.00 70.20 2,106.00

Sub-total P 181,758.92
C. ACTUAL DIRECT COST P

D. TOTAL UNIT COST (Total Cost of Work item/Quantity) P 181,758.92