0% found this document useful (0 votes)
8 views

assignment 6

This document is an assignment for the Chemical Engineering Department on Computer Aided Process Synthesis, dated October 25, 2023. It includes a series of questions covering topics such as cycle time, Gantt charts, batch plant operations, vessel sizing, transfer policies, and distillation configurations. The assignment aims to explore various aspects of process synthesis and scheduling in chemical engineering.

Uploaded by

darshanve1722
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

assignment 6

This document is an assignment for the Chemical Engineering Department on Computer Aided Process Synthesis, dated October 25, 2023. It includes a series of questions covering topics such as cycle time, Gantt charts, batch plant operations, vessel sizing, transfer policies, and distillation configurations. The assignment aims to explore various aspects of process synthesis and scheduling in chemical engineering.

Uploaded by

darshanve1722
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A Vidyabharti Trust Institution

SITARAMBHAI NARANJI PATEL Vidyabharti Campus, At. Ta. Bardoli, Dist. Surat-394345
Ph.02622-224581, 220581 Fax : 02622-227481,225458
INSTITUTE OF TECHNOLOGY AND RESEARCH CENTRE, UMRAKH Email : [email protected], [email protected]
Visit us on : www.snpitrc.ac.in

Date: 25 Oct 2023

Assignment- 6 (CO-4)

Name of Department: Chemical Engineering Department


Name of Subject: Computer Aided Process Synthesis (3170507)

Sr.
Questions
No
1 Explain terms cycle time and make span for single product and multiproduct batch plants. Discuss
effect of transfer policies and overlapping / non-overlapping of operations on them with example
showing gantt charts.
2 Explain detail flow shop and job shop plant with neat diagram.

3 A given batch plant produces one single product for which stage 1 requires 8 hours/batch; stage 2, 4
hours/batch and stage 3, 7 hours/batch. If zero – wait transfer is used, what is the cycle time? How
many parallel units should be placed in each stage to reduce the cycle time to 4 hours?
4 What is Gantt Chart? Why do you use Gantt Chart? Draw a Gantt chart for the following
processing times in the sequence of AAABBB Single Campaigns and ABABAB Multi
Campaigns .

5 Given the processing times for these products A, B, C, below. Determine with a Gantt
Chart the make span and cycle time for manufacturing two batches of A, 1 of B and 1 of C
for the following cases:
a. Zero-Wait policy with sequence AABC.
b. Same as a but with no intermediate storage policy NIC
c. Same as a but with unlimited intermediate storage policy UIS

6 Explain sizing of vessel in batch plant with suitable example. Discuss the possibility of
optimization for given example.
7 Explain in detail various transfer policies for batch process scheduling.

8 Draw the distillation configurations involving compression for heat integration and compare them.
9 Explain the positioning of heat engines and heat pump with reference to pinch temperature.

10 With neat sketch explain positioning distillation towers between hot and cold composite curves