The Safety Daily Report for the Citicore Solar Batangas 2 project on January 25, 2025, outlines manpower statistics, safe manhours, and health-related incidents. A total of 417,268 safe manhours were recorded with no work-related illnesses or incidents reported. The report also includes weather conditions and safety training activities conducted on-site.

Uploaded by

zamaradhaven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views2 pages

SDR - January 25, 2025

The Safety Daily Report for the Citicore Solar Batangas 2 project on January 25, 2025, outlines manpower statistics, safe manhours, and health-related incidents. A total of 417,268 safe manhours were recorded with no work-related illnesses or incidents reported. The report also includes weather conditions and safety training activities conducted on-site.

Uploaded by

zamaradhaven
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

SAFETY DAILY REPORT

Project Name : 177 MWp Citicore Solar Batangas 2 SDR No; PM-BOL-HSE-SDR-0 1
Project Location : Brgy. Bolbok Tuy, Batangas January 25, 2025
Prepared Date :

Daily Safety & Health Statistics


Manpower Safe Manhours Health
Total
Total Accumulated
Regular Overtime Total Yesterday Work Related Medical Lost Time COVID-19 Recordable
Company No. Manpower Safe Manhours First Aid
Hours Work Hours Work Manhours Manhours Illnesses Treatment Incident Related Health Issue

CCI 16
Security 38
"OE" Arbutus Team 5
Subcon:
364 8 2,912 414,356 417,268 0 0 0 0 0 0
Megawide 299
Security Megawide 6
MN Electro 28
Denver
Legend: Sunny Cloudy Light Rain Rainy
Weather Monitoring 7Am 8Am 9Am 10Am 11Am 12nn 1pm 2pm 3pm 4pm 5pm 6pm
TOOLBOX TALK INDUCTION TRAINING TESTING
TOPIC: Company Nos. Co./Topic Nos. Co./Type Nos.
Total
Attendees Present
Attendees
Safety reminders in site activity
Direct 59 and housekeeping and proper
392 PPE
Indirect 333
TOOL BOX TALK PHOTOS

ESH Issues & Concern


Issues & Concern Photos Action/Recommendation Closed-out Photo

ESH ACTIVITY
Prepared By: Checked by: Approved By: Noted by:

Jonathan Balita Gilbert Del Pilar Engr. Crismark Adversalo Samson Val V. Paringit
CCI- PCO CCI- ESH Supervisor Construction Manager Arbutus- HSE Engineer