CONSTRUCTION EXECUTION PLAN

The document is a comprehensive Construction Execution Plan Checklist that outlines critical categories such as Information, People, Work Environment, Equipment & Materials, and Project Controls. It includes detailed action items, required documentation, and completion statuses for various aspects of project management, including contract review, health and safety programs, equipment procurement, and risk assessment. The checklist serves as a guide to ensure all necessary components are addressed for successful project execution.

Uploaded by

Nick Operario Jr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

CONSTRUCTION EXECUTION PLAN

The document is a comprehensive Construction Execution Plan Checklist that outlines critical categories such as Information, People, Work Environment, Equipment & Materials, and Project Controls. It includes detailed action items, required documentation, and completion statuses for various aspects of project management, including contract review, health and safety programs, equipment procurement, and risk assessment. The checklist serves as a guide to ensure all necessary components are addressed for successful project execution.

Uploaded by

Nick Operario Jr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

CONSTRUCTION EXECUTION PLAN CHECKLIST

Project Description:
Project Name: Project Number: Project Location:

Critical Category Applies Action Require d Completed Critical Category Applies Action Required Completed Critical Category Applies Action Required Completed Critical
Level By Date Level By Date Level By Date Level

1. INFORMATION 2. PEOPLE 3. WORK ENVIRONMENT 4. EQUIPMENT & MATERIALS


A. CONTRACT REVIEW (Commercial Terms/Management) A. ORGANIZATION PLAN A. HEALTH, SAFETY & ENVIRONMENTAL PROGRAM A. CONSTRUCTION EQUIPMENT & TOOLS & CONSUMABLES
● Commercial Terms ● Role Definition ● Site Specific Health and Safety Program ● Construction Equipment Requirements
● Insurance/Bonding ● Organization Charts ● Orientation ● Availability of All Equipment
● W CB Clearance ● Owner Review COAA Best Practices and CSTS Training @ ▼ Establish Equipment Control Log
● Type of Contract & Contract Structure ● Engineer ● MSDS ▼ Procurement Strategy for Cranes and Rigging
Review COAA Contracts Library page @ http://contract ● Contractor ● Health, Safety and Environmental Responsibilities ▼ Seasonal Equipment requirements
EPCM ● Interface Plan ● Hazard Assessment ▼ Sequencing
Lump Sum Key Suppliers/Vendors Listing Review COAA Field Level Risk Assessment Tools @ ▼ Site Inspection & Maintenance Plan
Target Price / Reimbursable Tagged Equipment Vendors ● Safe W ork Practices and Job Procedures ▼ Mobilization / Demobilization Logistics
Unit Price Bulks Materials Vendors ● Rules / Disciplinary Action Procurement Strategy for Specialized Equipment
Cost Plus Fixed Fee ● Drug / Alcohol Program Plan of Equipment Requirements and Utilization including Type,
Cost Plus (Reimbursable) Pre-Access Testing Resource Levelling (Overall Site Considerations)
Reimbursable with Incentives B. LOCAL CONTENT PLAN ● Personal Protective Equipment Rental Equipment Agreements
▼ Signed Contract including Review/Verification ▼ Local Community ▼ Maintenance Program Purchase / Residual
▼ W arranties & Guarantees ▼ Aboriginal Content Plan ▼ Training Lease to Purchase
▼ Penalties/Rewards ▼ Inspections Rental
▼ Milestones ▼ Investigations Hourly vs. W eekly vs. Monthly
Delay Notice C. HUMAN RESOURCES PLAN ▼ W orker Health W et vs. Dry
Invoicing Requirements / Signing Authority ● Staffing (Includes Manpower Forecast) ▼ Emergency Response Plan Operated vs. Bare Rental
Owners Cost Coding Structure Change Management Strategy ▼ Environmental Protection Equipment Certifications (Cranes, Lifting Equip, Testing Equip)
Change Management ● Trades (Includes Manpower Forecast) ▼ Security Internal Equipment Availability and Supply
Signing Authority Review COAA Manpower Forecast @ www.COAA.ab.ca ▼ Subcontractor Management ● Personal Protective Equipment (PPE)
● Technical Terms Review ● Orientation ▼ Modified W ork Program ● Definition of Personal Protective Equipment
● Permits / License ● Shift Plan (Work Week and Schedule) ▼ Project Specific Safety Program ● Supply & Distribution
● IFC Drawings ▼ Mentoring ▼ Vehicle Safety and Safe Driving Program ● Cleaning & Maintenance Plan
Latest Revisions Review COAA Mentoring Program @ www.COAA.ab.ca ▼ Safety Recognition Program -Awards and Incentives ● Inspection & Replacement Plan
Delivery Schedule / Milestones for Delivery ▼ Labour Relations Plan ▼ Records and Statistics ● Confined Space Supplied Air Consideration (Bottled Air) Supply
● IFC Specifications Mixed Site ▼ Corporate Site Audit ▼ Storage
Latest Revisions Open Site ▼ Glossary of Terms Small Tools
Delivery Schedule / Milestones for Delivery Closed Site ▼ Site Specific Environmental Program Definition of Small Tools
▼ General Execution Plan Overview ▼ Skilled Trades, Technical, and Staff Recruiting Plan ▼ Loss Control Tool Loss Control Plan
W ho supplies what Team Building - Internal (Group Specific) / External (Overal ▼ Overall Site Security Tool Crib Strategy / Location
Project General Contractor and Subcontractors Training ▼ Values and Beliefs - Mission Statement Proximity to W ork Face
Other Onsite Contractors Supervisory Training Plan Supply Strategy (Own vs. Lease vs. 3rd Party Supply)
▼ Turnover Requirements (including Documentation) Apprentice Utilization Quantity Requirements & Type Assessment
System definition for turnover & Commissioning Review COAA Effective Use of Apprentices Library @ www B. QA/QC PLAN Small Tool List
▼ Scope Definition Retention Plan ● Site Specific ITP Tool Inspection, Repair and Re-certification Program
Integration and Use of Foreign Workers ● Responsibility Matrix Mobilization & Demobilization Logistics
● Material QA/QC Control Consumables
B. PROJECT CONTROLS ● Operations QA/QC Interface Definition of Consumables
● Cost Control and Administration D. COMMUNICATION & REPORTING PLAN (Communicating Down vs. Info Communicating Up) ● Owner QA/QC Interface Supply & Control Plan
● Workface Planning ● Communication Matrix ▼ Testing Procedure (Isolation) Storage & Distribution Plan
● Schedule ● Safety Communication ▼ Third Party Test & Inspection Surveys Special Storage Requirements
Resourced and Levelled Safety Performance Feedback Plan ▼ Source Inspection Plan for Vendors, Fabricators, Major Quantity Requirements & Type Assessment
● Document Control Provisions for Safety Stand downs ▼ Certifications Audit program
Document Distribution Matrix ● Legislative Requirements / Changes W elder Certifications
▼ Estimate ▼ Plant Operation Changes Contractor Certifications B. MAJOR EQUIPMENT & TAGGED ITEMS
▼ Work Breakdown Structure Plant Emergency, N/A for Greenfield Vendor Certifications ● Procurement & Expediting Responsibility Matrix
▼ Productivity Control System ▼ Community Interface Engineer Certifications ▼ Logistics vs. Space on Site
Signing Authority Matrix Community Disaster/Emergency Plan QA/QC Conflict Resolution Process ▼ Preservation and Preventative Maintenance Plan
Invoicing ▼ Sequencing
Charges ▼ Warehousing & Control
Labour Mob/Demob E. RISK ASSESSMENT AND MITIGATION PLAN C. OFF SITE ▼ Inspection Requirements and Plan (Including at-source and ons
Materials Purchase ● Transportation Issues ● Fabrication Plan Receiving / Offloading Procedure
Construction Equipment Mob/Demob Offsite W orker Transportation Safety Precast Concrete Schedule & Mitigation Plan for Change
Sample Signature Record (employee number) ● Camp vs. LOA Piping Final Certified Weights for Rigging
Shop Drawing Review ● Workforce Management Structural Steel Ancillary Shipment Verification
Project Control Systems Integration Plan (Owner/Engineer/ ● Labour Supply vs. Manpower Forecast Equipment Shipping Notification & Correct Instructions
● Labour Quality Rebar Operating Spares (Storage)
● Concurrent and Conflicting Projects (Coordination Between Pre Engineered Buildings Vendor Rep Requirements & Schedule
C. PROJECT WIDE INTEGRATION PLAN ● Labour Relations Plan Formwork First Fill Responsibility – Supply
▼ Operations and Maintenance Interface Plan ▼ Mixed Site ● Modularization Plan First Fill Responsibility – Installation
▼ Other Contractors ▼ W orkforce Age ▼ Constructability Special Equipment Preparation Requirements
▼ Shift Plan / Sequencing of Time Off/Start_Stop Time Piperack Modules Pickling
Conflicting Projects Changes in Key Personnel Equipment Modules Flushing
Precommissioning and Turnover ▼ Motivation / Incentives Structural Steel Modules Bearing Grease Removal
Turnaround and Shutdown Plan Interface Cleaning
Size PSV & Control Valves
Sequencing Plan Testing & Requirements
D. CHANGE MANAGEMENT (includes Change Orders) Facility Layout / Staging Bench Testing Instruments
Change Management ● Trafficking & Logistics & Transportation Transfer of Vendor Data / Vendor Drawings
Dispute Resolution ▼ Module transport Study Equipment Certification ( i.e.. CSA Certifications, etc.)
Delay of Contract (Impacts) Philosophy
Rework Plan
Metrics Definition Typical Loading Configuration C. MATERIALS PROCUREMENT
Measurement and Trending Plan Security ▼ Bulks (Piping / Electrical/EHT/Insulation)
Reporting Plan Bussing ▼ Procurement Responsibility Matrix
Review COAA Rework Tools @ http://rework.coaa.ab.ca/lib Brassing ▼ Storage & Distribution
Pedestrian Plan ▼ Care & Control (Material Tracking)
Specialized/Heavy Transport ▼ Expediting / Statusing / Reporting
E. REPORTING Road Bans ▼ Preservation
Reporting Requirements (Contractual / Client) (Reporting U Bridge Load Limits ▼ Supply Chain Management Plan
Turnover & Commissioning (Documentation Plan) ● Subcontract Plan ▼ Required on-site Dates
Regular Construction Progress Reports Project Specific Definitions
Regular Construction Cost Reports Shorts Procurement Procedure Matrix
Safety Performance Reporting/Tracking Plan D. ON SITE Definition
Quality Control Reporting Plan ● Construction Methodology Distribution to W orkface Plan
Productivity Reporting Plan ▼ Site Infrastructure Surplus Management
Schedule Reporting Plan General Overview Order Release Timing
Daily W ork Plan / Progress Reports / Look Ahead Office Trailers/Dry rooms/Lunch rooms Preferred Supplier List
Manpower Reporting & Tracking Plan W ashrooms Receiving Procedures & Inspections
Local Content Reporting & Tracking Plan ▼ Site Communication Plan Process for Deviation from Preferred Supplier List
Cost Reporting Plan Phones/Fax Receiving Procedures & Inspections
Daily/Weekly/Monthly Reporting Plan Radios ▼ Concrete, Civil & Structural Material
Report Distribution Matrix ▼ Safety/First Aid/Medical Facilities ▼ Procurement Responsibility Matrix
Brass in/Brass Out Facilities ▼ Storage & Distribution
Temporary Power ▼ Availability & Distance of Clay / Granular Materials
F. RISK CONFIRMATION ASSESSMENT AND MITIGATION PLAN Temporary W ater/Sewer ▼ Formwork Procurement / Rent / Build
Safety & Environmental Gas/Heating ▼ Receiving Procedures & Inspections
OH&S Order Fire Protection/Emergency Response Facilities ▼ Seasonal Considerations
Fatality ▼ Permit Requirements ▼ Rebar Supply / Fabrication / Control
EH&S events Daily Hot W ork Permitting ▼ Structural Steel Supply / Fabrication / Control
Quality ▼ Site Traffic Plan Local Concrete / Asphalt availability vs. Batch Plant
PRRT Assessment and Review at Critical Project Phases @ ▼ Site Roads and Access Local Stock Piling
Estimate Review Vehicles and Parking
Project Execution/Mitigation Review ▼ Site Trafficking & Logistics & Transportation
Schedule Review Security, Bussing, Brassing, & Pedestrian Plan D. MATERIALS MANAGEMENT
Allowances/Contingencies W aste Disposal Plan ▼ Responsibility Matrix
Risk Transfer or Assumption Constructability Reviews ▼ Receiving Procedures
Dispute resolution breakdown Cranes & Heavy Lift Strategies ▼ Storage and Laydown (Inside / Outside)
Other Significant Risks Review of COAA Best Practices @ http://safety.coa ▼ Distribution
Significant Change in Design Rigging Studies Inventory Control System
Significant change in Market Forces - Commodity price dro W indow Limitations Documentation
Major Delivery problem - i.e.. ship sinks with key equipment Access Restrictions Surplus Management and Final Disposition
General Labour Issues Testing – Pneumatic/Hydrotesting
Changes in government legislation Concrete Pour Plan
Terrorism and Security Risks Formwork Plan E. RISK ASSESSMENT
Breach of contract Shoring Plan ▼ Major Equipment/Tagged Items
Bankruptcy False work ▼ Late Ordering and Delayed Delivery
W eather related events - flood, fire etc Trenching Over, Short, Damage Risks
Significant Productivity Loss Subcontract Plan Proper Documentation
Reduced owner cash flow General Overview Supplier/Fabricator's Risk
Global event IT Plan Information/Computers Material Procurement
Significant Forecasted Cost Overruns Seasonal W ork Plan Construction Equipment
Pre-Commissioning Scaffolding Age and reliability
Commissioning Laydown Plan/Assembly Yards Availability
Start-Up Outside Fabrication Area Delivery Logistics
Overall W arehousing Plan Loss Control/Mitigation
Size & Location Material Management Risks
Heated vs. Cold Storage General Risk Assessment
Size & Number of Racks, Shelves & Bins Concrete, Civil, Structural Risks
Fuel Material Procurement Risks
Fencing/Barricades/Secured Areas Bulks
Availability
Supplier/Fabricator's risk
E. RISK ASSESSMENTS Late Ordering and Delayed Delivery
▼ Work Outages Over, Short, Damage Risks
▼ Plant Outages Improper Documentation
▼ Evacuations Supply Chain Management System Risks
▼ Permitting Risks Shorts
▼ Evaluation Plan / Muster Points Procedural Risk Management
▼ Work Stoppages
Funding Shortages
QA/QC
Major Schedule Change or Delay
Safety
Environment
▼ Force Majeure Type Items
W eather
Labour Strikes / Pickets
WAR / FAM
Terrorism
▼ Off Tool Time
▼ Drug & Alcohol Testing
Owner Orientation Requirements
House Keeping Requirements
CSTS Training
H2S Alive Training
Task Specific Training
W elder Testing
Safety Incident Investigation Schedules
Meeting
Tailgate
Union Info Meetings
Safety Meetings
▼ Subcontract Risks
Owner’s Site Culture
Unforeseen Conditions - Geotechnical Issues - Poor So
Public Untrust
Plant Upset
Change in Government Legislation
Category Applies Action Required Completed
By Date

4. EQUIPMENT & MATERIALS


A. CONSTRUCTION EQUIPMENT & TOOLS & CONSUMABLES
● Construction Equipment Requirements
● Availability of All Equipment
▼ Establish Equipment Control Log
▼ Procurement Strategy for Cranes and Rigging
▼ Seasonal Equipment requirements
▼ Sequencing
▼ Site Inspection & Maintenance Plan
▼ Mobilization / Demobilization Logistics
Procurement Strategy for Specialized Equipment
Plan of Equipment Requirements and Utilization including Type,
Resource Levelling (Overall Site Considerations)
Rental Equipment Agreements
Purchase / Residual
Lease to Purchase
Rental
Hourly vs. W eekly vs. Monthly
W et vs. Dry
Operated vs. Bare Rental
Equipment Certifications (Cranes, Lifting Equip, Testing Equip)
Internal Equipment Availability and Supply
● Personal Protective Equipment (PPE)
● Definition of Personal Protective Equipment
● Supply & Distribution
● Cleaning & Maintenance Plan
● Inspection & Replacement Plan
● Confined Space Supplied Air Consideration (Bottled Air) Supply
▼ Storage
Small Tools
Definition of Small Tools
Tool Loss Control Plan
Tool Crib Strategy / Location
Proximity to W ork Face
Supply Strategy (Own vs. Lease vs. 3rd Party Supply)
Quantity Requirements & Type Assessment
Small Tool List
Tool Inspection, Repair and Re-certification Program
Mobilization & Demobilization Logistics
Consumables
Definition of Consumables
Supply & Control Plan
Storage & Distribution Plan
Special Storage Requirements
Quantity Requirements & Type Assessment

B. MAJOR EQUIPMENT & TAGGED ITEMS


● Procurement & Expediting Responsibility Matrix
▼ Logistics vs. Space on Site
▼ Preservation and Preventative Maintenance Plan
▼ Sequencing
▼ Warehousing & Control
▼ Inspection Requirements and Plan (Including at-source and ons
Receiving / Offloading Procedure
Schedule & Mitigation Plan for Change
Final Certified Weights for Rigging
Ancillary Shipment Verification
Shipping Notification & Correct Instructions
Operating Spares (Storage)
Vendor Rep Requirements & Schedule
First Fill Responsibility – Supply
First Fill Responsibility – Installation
Special Equipment Preparation Requirements
Pickling
Flushing
Bearing Grease Removal
Cleaning
PSV & Control Valves
Testing & Requirements
Bench Testing Instruments
Transfer of Vendor Data / Vendor Drawings
Equipment Certification ( i.e.. CSA Certifications, etc.)

C. MATERIALS PROCUREMENT
▼ Bulks (Piping / Electrical/EHT/Insulation)
▼ Procurement Responsibility Matrix
▼ Storage & Distribution
▼ Care & Control (Material Tracking)
▼ Expediting / Statusing / Reporting
▼ Preservation
▼ Supply Chain Management Plan
▼ Required on-site Dates
Project Specific Definitions
Shorts Procurement Procedure Matrix
Definition
Distribution to W orkface Plan
Surplus Management
Order Release Timing
Preferred Supplier List
Receiving Procedures & Inspections
Process for Deviation from Preferred Supplier List
Receiving Procedures & Inspections
▼ Concrete, Civil & Structural Material
▼ Procurement Responsibility Matrix
▼ Storage & Distribution
▼ Availability & Distance of Clay / Granular Materials
▼ Formwork Procurement / Rent / Build
▼ Receiving Procedures & Inspections
▼ Seasonal Considerations
▼ Rebar Supply / Fabrication / Control
▼ Structural Steel Supply / Fabrication / Control
Local Concrete / Asphalt availability vs. Batch Plant
Local Stock Piling

D. MATERIALS MANAGEMENT
▼ Responsibility Matrix
▼ Receiving Procedures
▼ Storage and Laydown (Inside / Outside)
▼ Distribution
Inventory Control System
Documentation
Surplus Management and Final Disposition

E. RISK ASSESSMENT
▼ Major Equipment/Tagged Items
▼ Late Ordering and Delayed Delivery
Over, Short, Damage Risks
Proper Documentation
Supplier/Fabricator's Risk
Material Procurement
Construction Equipment
Age and reliability
Availability
Delivery Logistics
Loss Control/Mitigation
Material Management Risks
General Risk Assessment
Concrete, Civil, Structural Risks
Material Procurement Risks
Bulks
Availability
Supplier/Fabricator's risk
Late Ordering and Delayed Delivery
Over, Short, Damage Risks
Improper Documentation
Supply Chain Management System Risks
Shorts
Procedural Risk Management