0% found this document useful (0 votes)
5 views

1Shackles

The document is an inspection report for lifting gear, specifically shackles, conducted for Bohai Drilling Company on April 3, 2024. The inspection was thorough, with all equipment passing various checks, and the next inspection is scheduled for October 2, 2024. The report includes details of the equipment, inspection procedures, and confirms that all shackles are safe to operate.

Uploaded by

cataflam80
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

1Shackles

The document is an inspection report for lifting gear, specifically shackles, conducted for Bohai Drilling Company on April 3, 2024. The inspection was thorough, with all equipment passing various checks, and the next inspection is scheduled for October 2, 2024. The report includes details of the equipment, inspection procedures, and confirms that all shackles are safe to operate.

Uploaded by

cataflam80
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

scan QR AND

check

Inspection Service
This Service presented to

Bohai Drilling Company

Inspection Services Lifting Gear Inspection


(Equipment Name & SN) Shackles

Customer Bohai Drilling Company

Work Location Rig BHDC-112

Inspection Date 03-04-2024

Next Inspection Date 02-10-2024

Inspector Ahmed Hassan


scan QR AND
check

Inspection Summary Report GPS – IMS – F069


Rev.02

Report No GPS-BHDC-24-14-ISR-AG-01 Job ticket / WO BHDC-24-14


Customer Bohai Drilling Company Examination date 03/04/2024
Location Rig BHDC-112 Examination type/category Thorough Examination

Equipment details
Name of the examined equipment Shackles
Summary of procedures
Description of step Status Remarks
The inspection must be carried out in adequate, shadow free lighting.  Pass
The items of lifting equipment must be clean and free from rust for examination  Pass
The identification marking and working load limit is clear and correct  Pass
Check Distortion of the body and alignment of the holes on opposite sides of the shackle.  Pass
Check Free working of the pin & nut, And thread should be hand tight and complete.  Pass
Check Wear on thread of safety pin or screw pin shackles  Pass
Check Wear on body of safety pin or screw pin shackles  Pass
Wear in pin and body of shackle; this must not exceed 8% of the original diameter  Pass

Inspector name Signature & Stamp


Ahmed Hassan
scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-1 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 1 1/4"
1 Manufacture: Crosby 12 Tonnes
HR 10
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-2 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 1 1/4"
09 3 Manufacture: H&X 12 Tonnes
N2 Grade: G6
N3
Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-3 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackle

69 Size: 1 1/4"
61 4 Manufacture: DSL 12 Tonnes
N6 Grade: G6
N7
Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-4 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 1 1/8"
1 Manufacture: DC 9.5 Tonnes
A 795
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-5 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 1 1/8"
1 Manufacture: GUNNEBO 9.5 Tonnes
S 1800
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-6 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

B 1753 Size: 1 1/8"


B 1760 4 Manufacture: Toyo Lift 9.5 Tonnes
B 1762 Grade: G6
A 7951
Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-7 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 1 1/8"
2 Manufacture: DSL 9.5 Tonnes
92
N5 Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-8 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 1"
1 Manufacture: GP 8.5 Tonnes
N8 Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-9 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles
N4
N 20
N 21 Size: 1"
N 23 8 Manufacture: DSL 8.5 Tonnes
04 Grade: G6
05
2 Safety Factor 6:1
1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-10 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles

Size: 1"
1 Manufacture: J&W 8.5 Tonnes
06
02 Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-11 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 7/8"
1 Manufacture: Crosby 6.5 Tonnes
N 11 Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-12 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

N 13 Size: 7/8"
4 Manufacture: DY 6.5 Tonnes
N 24
N 27 Grade: G6
T 131110-255
Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-13 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles

N9 Size: 7/8"
4 Manufacture: DSL 6.5 Tonnes
N 10
N 15 Grade: G6
N 18
Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-14 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles

N 19 Size: 7/8"
5 Manufacture: DSL 6.5 Tonnes
N 22
N 25 Grade: G6
N 26
3 Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-15 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles

Size: 7/8"
1 Manufacture: VD 6.5 Tonnes
08
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-16 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 3/4"
1 Manufacture: DY 4.75 Tonnes
N 14 Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-17 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles

Size: 3/4"
2 Manufacture: DSL 4.75 Tonnes
N 16
N 17 Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-18 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles

Size: 5/8"
1 Manufacture: MCKAT 3.25 Tonnes
N 12
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-19 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Alloy Safety Pin Bow Shackles

Size: 1 1/4"
1 Manufacture: WHS 21 Tonnes
N1
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-20 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Dee Shackles

Size: 1"
1 Manufacture: HK 8.5 Tonnes
22
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-21 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 7/8"
11 2 Manufacture: DY 6.5 Tonnes
13 Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber


scan QR AND
check

Certificate of Thorough Examination of Lifting Equipment


This certificate complies with the requirements of the lifting operations and lifting equipment regulations 1998.
GPS – LIFT – LEEA F10
Examination was carried out under supervision of a competent person
Rev.02
By GPS rules.
Certificate No BHDC-24-14-01-22 Date of Examination: 03/04/2024 Date of Next Examination: 02/10/2024
Name of employer for whom the thorough examination was made Address of premises at which the examination was made
Bohai Drilling Company Rig BHDC-112
Identification No Qty Description Of The Equipment Safe Working Load

Shackles
Safety Pin Bow Shackles

Size: 1/2"
1 Manufacture: SIVA 2.5 Tonnes
12
Grade: G6

Safety Factor 6:1

EXAMINED ACCORDING TO US FED SPEC RR-C-271F

Was the examination carried out Within an interval of 6



Is this the first examination after installation or months
X
assembly at a new site or location Was the examination carried out Within an interval of
X
12 months?
Was the examination carried out in accordance with an

If the answer to the above question is YES has the examination scheme?
equipment been installed correctly? Was the examination carried out After the occurrence of
X
exceptional circumstances?
Is This equipment safe to operate at the time of inspection? Yes
Identification of any part found to have a defect which is or could become a danger to persons and a description of the defect:
NONE
Particulars of any repair, renewal or alteration required to remedy the defect identified above:
NONE
VISUAL INSPECTION & DIMENSIONAL CHECK WAS CARRIED OUT AND FOUND SATISFACTORY.
Name of person making this report Name of person authenticating this report

Ahmed Hassan Ahmed Gaber