Track and Futsal v1
Track and Futsal v1
GST : 36AUKPA2515N1ZM
17-154/15, Devender Nagar
Secunderabad - 500087
Contact :- 9989979961
Proposal for supply and installation of Outdoor sports floorings accessories (Professional) - Getanjali International School
To
Section-1
Running Track
4 EPDM sports flooring EPDM 13mm sports flooring Sft 8,399 205 1,721,795
Section 1 Total value Inclusive of Installation and line markings but excluding GST & Freight : 2,855,660
Section-2
Football Ground
Drain of width 8 inches. The height of drain will be made to match the side of
the court. This drain will channelize water till one corner of the court. From their
drainage connection to be provided by client.
* Providing and laying of average compacted upto 150mm thick with 40/20/12 &
6mm metal Stone/Jelly to form a contour and elevations to the desired level as
per Drawings
* Drain Chambers to be provided by client, Groundskart to open drain water
points according to client requirement
FootballGoal post made of 3 1/2" Round Pipes with Wheels for easy movement
Size W12ft x H7ft x 3 ft depth
Section 2 Total value Inclusive of Installation and line markings but excluding GST & Freight : 1,805,700
Total value Inclusive of Installation and line markings but excluding GST & Freight : 4,661,360
Total value Inclusive of Installation and line markings ,GST & Freight : 5,720,421
Terms & Conditions :
1) PO & Payments to be issued in favor of Groundskart Inc
2) Payment terms :
40% advance along with signed PO
20% post complitioin of Sub bases
30% post reciept of the sports flooring materials
10% post complitioin of the Project
3) Project completion: 60days from the receipt of work order , advance payments and sign off drawings.
4) The client has to provide electricity connection for the installation process at FOC for installation process..
5) Warranty: 8 years on the sport flooring ( on both Vinyl and Ply ) and the client maintains the floor as per our guidelines.
6) Life expectency of the ( Ply + Vinyl ) system is 15 years.
7) GST of 18% would be applicable on all.
8) Freight of 3% would be applicable on all.
9) client needs to handover us proerly levelled unundualted Concrete base.
For Groundskart