Dismantling of Existing Structure - DATA
Dismantling of Existing Structure - DATA
Dismantling the existing and fell down plain concrete structure in the cause way such as PCC pavement slab,
pier bottom slab, pier wall, bed block, pier protection top slab and disposing the demolished material including
2
all other incidental charges etc., with a lift upto 3 m and lead upto 1 km as per specification and as per directions
of Departmental officers for Dismantling Cement Concrete Slab
Dismantling the existing and fell down stone Masanory structures such as Retaining wall, revetment, pitching
and disposing the demolished material including all other incidental charges etc., with a lift upto 3 m and lead
3
upto 1 km as per specification and as per directions of Departmental officers for Dismantling Stone Masonry
structures.
Picking the existing bituminous road surface to a depth of 75 mm and disposing of scarified materials with a lift
5
upto 3 m and lead upto 1 km as per specification and as per directions of Departmental officers
Removal of filling inbetween retaining walls by Earthwork excavation including all classes of soil, gravel, WMM,
GSB except soft disintegrated rock not requiring blasting and hardrock requiring blasting and depositing on bank
with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidential charges such as
baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their
6
subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming
bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., with a lift upto 3
m and lead upto 1 km as per specification and as per directions of Departmental officers complete as per
relevant standard specification.
Quantity Unit Item Unit Rate/Unit Amount