CDACC power generation
CDACC power generation
071306T4EEN
Electrical Engineering (Power Option) Level 6
ENG/OS/PO/CR/10/6
Demonstrate Understanding of Power Generation
July/August 2023
Time: 3hours
WRITTEN ASSESSMENT
3 HOURS
INSTRUCTIONS TO CANDIDATE:
This paper consists of TWO sections: A and B.
Answer ALL questions in sections A and three questions in B in the answer booklet
provided.
Marks for each question are indicated in brackets.
Do not write on this question paper.
Answer the questions in English.
Page 1 of 4
©TVET Curriculum Development, Assessment and Certification Council July/August 2023
11. Name TWO types water turbines mainly used in hydro-power plant (2 Marks)
t
sy
ea
Page 2 of 4
©TVET Curriculum Development, Assessment and Certification Council July/August 2023
Yield factor, 𝐾 = 80 %
t
sy
ea
Page 3 of 4
©TVET Curriculum Development, Assessment and Certification Council July/August 2023
Page 4 of 4