0% found this document useful (0 votes)
3 views13 pages

Amendment 01 Technical

Amendment No.1 to the Technical Specification outlines various changes to existing specifications related to engine types, structural works, noise pollution conditions, and civil works documentation. Key updates include adjustments to noise control measures, cable and transformer specifications, and site management protocols during construction. The amendment emphasizes compliance with environmental standards and the need for proper maintenance and operation of equipment.

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views13 pages

Amendment 01 Technical

Amendment No.1 to the Technical Specification outlines various changes to existing specifications related to engine types, structural works, noise pollution conditions, and civil works documentation. Key updates include adjustments to noise control measures, cable and transformer specifications, and site management protocols during construction. The amendment emphasizes compliance with environmental standards and the need for proper maintenance and operation of equipment.

Uploaded by

Senthil Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Amendment No.

1 to Technical Specification
Sl Specification reference Existing Read As
No.
Sec/Part Sub Sec Page No. Clause No.
1. VI/A Volume 249/1178 1.00.00 Engine - Medium Speed Type for 50 Hz Electric Power Engine – Suitable for 50 Hz Electric Power
IV (b) Generation Applications Generation Applications
2. VI/A Volume 171/1178 1.01.00 Complete structural and Architectural works, providing Complete structural work related to all
II (vi) construction offices, field equipment erection as per scope of this
laboratory, construction equipment, construction power package in Part A Volume III, providing
and construction water. construction offices, field laboratory, construction
equipment, construction power and construction
water
3. VI/A Volume 271/1178 Annexure NOISE POLLUTION CONDITIONS: STANDARD EC NOISE POLLUTION CONDITIONS: STANDARD
IV IA CONDITIONS FOR EC CONDITIONS FOR THERMAL POWER
THERMAL POWER SECTOR SECTOR
D. Noise pollution and its control measures:
A.) As per Standard EC Condition for Thermal Power
1. The Ambient Noise levels shall meet the standards
Sector, 19th Nov 2018
prescribed as per the Noise
Pollution (Regulation and Control) Rules, 2000. 1) The Ambient Noise levels shall meet the
2. Persons exposed to high noise generating standards prescribed as per the Noise Pollution
equipment shall use Personal Protective (Regulation and Control) Rules, 2000.
Equipment (PPE) like earplugs/ ear muffs, etc. 2) Persons exposed to high noise generating
3. Periodical medical examination on hearing loss shall equipment shall use Personal Protective
be carried out for all the workers Equipment (PPE) like earplugs/ear muffs, etc.
and maintain audiometric record and for treatment of 3) Periodical medical examination on hearing loss
any hearing loss including rotating shall be carried out for all the workers and
to non-noisy/less noisy areas. maintain audiometric record and for treatment of
PROJECT SPECIFIC CONDITION: any hearing loss including rotating to non-
Noise levels emanating from genset shall be so noisy/less noisy areas.
controlled such that the noise in the work PROJECT SPECIFIC CONDITION:
zone shall be limited to 85 dB(A) 1m from source. B.) As per Env. (Protection) Third Amendment Rules,
For people working in the high noise area, requisite 2016, 7th March 2016
personal protective equipment like earplugs/ear muffs
etc. shall be provided. Workers engaged in noisy areas Noise Limits:-
such as turbine area, air compressors etc shall be
periodically examined to maintain audiometric record
Amendment No.1 to Technical Specification
and for treatment for any hearing loss including shifting (a) Noise from gensets shall be controlled by
to non-noisy/less noisy areas. providing an acoustic enclosure or by treating the
room acoustically, at the users end.
(b) The acoustic enclosure shall be designed for
minimum 25 dB(A) insertion loss or for complying
with the ambient noise standards, whichever is on
the higher side (if the actual ambient noise is on
the higher side, it may not be possible to check
the performance of the acoustic enclosure or
acoustic treatment. Under such circumstances,
the performance may be checked for noise
reduction upto actual ambient noise level,
preferably, in the night time between 10.00 PM-
6.00 AM). The measurement for insertion loss
may be done at different points at 0.5 m from the
acoustic enclosure or room, and then averaged.
4. VI/A Volume 293/1178 8.03.01 Civil and Structural works drawings and documents for Civil and Structural works drawings and
VI B all structures, facilities, architectural works, foundations documents for all structures, facilities,
(xxiv) underground and overground works and super- architectural works, foundations underground and
structural works as included in the scope of the bidder overground works and super-structural works as
civil calculation sheets including structural analysis and included in the scope of the bidder civil calculation
design along with output results. sheets including structural analysis and design
along with output results.
However, for civil related
documents/drawings, it will be limited to
interface inputs as applicable and defined
elsewhere in specification.
5. VI/A Volume 293/1178 8.03.01 Underground facilities, levelling, sanitary, landscaping Deleted
VI B drawings.
(xxv)
6. VI/A Volume 293/1178 8.03.01 Geotechnical investigation and site survey reports (if Deleted
VI B and as applicable).
(xxvi)
Amendment No.1 to Technical Specification
7. VI/B Volume I 442/1178 1.02.12 Cable trenches/slits, if unavoidable, shall be provided Cable trench/slit requirement shall be provided by
M2 with adequate cushioning of sand and the same shall bidder as an input drawing for civil works.
be covered with PCC.
8. VI/B Volume I 443/1178 1.02.16 The Transformer fencing shall be at 1.0 M (minimum) The transformer yard layout shall be prepared by
M2 distance from the pit wall. The Height of fencing shall bidder as an input for civil works. The following
be 2.5 M (minimum) and fencing shall have personal layout requirements to be fulfilled while preparation
entry gate and removable type fencing/gate for of transformer yard layout.
transformer withdrawal.
1.The Transformer fencing shall be at 1.0 M
(minimum) distance from the pit wall. The Height of
fencing shall be 2.5 M (minimum) and fencing shall
have personal entry gate and removable type
fencing/gate for transformer withdrawal.

2. For all outdoor transformers a pit shall be


provided all around at a distance of 1.0 m
(minimum) from transformer outer edge. A sump
pit shall be provided for each pit.

9. VI/B Volume I 443/1178 1.02.17 For all outdoor transformers a pit shall be provided all DELETED
M2 around at a distance of 1.0 m (minimum) from
transformer outer edge. A sump pit shall be provided for
each pit.

10. VI/A Volume 251/1178 3.02.00 Compressed air system and Start-up air system Compressed air system and Start-up air system
IV (e) (Duty factor - 0.6)

11. VI/B Volume 517/1178 SLD Single line diagram Updated Single line diagram
II
E1
12. VI/B Volume 513/1178 2.05.00 Cables and Bus Ducts: Cables and Bus Ducts:
II The minimum rating of cable/ bus ducts shall meet the The minimum rating of cable/ bus ducts shall
E1 following criteria: All the cables and bus ducts feeding meet the following criteria: All the cables and
switchboards from transformers shall be sized based on bus ducts feeding switchboards from
Amendment No.1 to Technical Specification
transformer rating and considering the maximum transformers shall be sized based on
negative voltage variations envisaged in the transformer rating and considering the
specifications. All the cables and bus ducts feeding maximum negative voltage variations envisaged
transformers shall be sized based on current ratings of in the specifications. All the cables and bus
transformer at the minimum voltage tap of the ducts feeding transformers shall be sized based
transformer. All other cables/bus-ducts shall be sized on current ratings of transformer at the
based on the load demand under most onerous minimum voltage tap of the transformer. All
conditions. Cables shall be selected to so as to limit other cables/bus-ducts shall be sized based on
maximum voltage drop at equipment terminals during the load demand under most onerous
normal operation and starting conditions well within conditions. Cables shall be selected to so as
permissible values. Cables shall be derated for the site to limit maximum voltage drop at equipment
ambient and ground temperatures, grouping and soil terminals during normal operation and starting
resistivity and cable laying configuration. All HT cables conditions well within permissible values.
shall be of unearthed grade. The bidder shall furnish Cables shall be derated for the site ambient
detailed cable selection/sizing criteria for Employer’s and ground temperatures, grouping and soil
approval. resistivity and cable laying configuration. All
HT cables shall be of unearthed grade. The
bidder shall furnish detailed cable
selection/sizing criteria for Employer’s
approval.
However, the 33kV voltage cable shall be of
earthed grade type.
13. VI/B Volume 663/1178 4.00.00 Dry type Transformer specifications Deleted
II 5.00.00
E13 6.00.00
7.00.00
8.00.00
9.00.00
Amendment No.1 to Technical Specification
14. VI/B Volume 645/1178 1.01.00 Auxiliary Auxiliary
II (vi) S Transformer GT Transformers Sno Transformer GT Transformers
E13 no (including LT (including LT
Outdoor) Outdoor)
ONAN/
(vi) Cooling ONAF ONAN
(80/100%) ONAN/
(vi) Cooling ONAF ONAN
(80/100%)
or ONAN
as
applicable
15. VI/B Volume 648/1178 1.03.01 GT:- Transformers shall be provided with detachable GT :-
II (b i) type tank mounted radiator banks with 100% cooling (a) in case of ONAN/ONAF Scheme:
E13 capacity. Cooling fans shall not be directly mounted on Transformers shall be provided with detachable
radiator bank which may cause undue vibration, also type tank mounted radiator banks with 100%
fan shall be protected by galvanized wire guard. Each cooling capacity. Cooling fans shall not be
radiator bank shall have lifting lug, air release plug, top directly mounted on radiator bank which may
& bottom filling/shut-off valves, filter valves, drain cause undue vibration, also fan shall be protected
valve/plug etc. The number and capacity of cooling fans by galvanized wire guard. Each radiator bank shall
with radiator bank shall be such that outage of any fan have lifting lug, air release plug, top & bottom
does not reduce the continuous rating. filling/shut-off valves, filter valves, drain
Automatic operation/control of fans shall be provided valve/plug etc. The number and capacity of
(with temp. change) from contacts of winding temp. cooling fans with radiator bank shall be such that
Indicator. outage of any fan does not reduce the continuous
rating. Automatic operation/control of fans shall
be provided (with temp. change) from contacts of
winding temp. Indicator.
(b) in case of ONAN scheme: the radiators
shall be detachable type, mounted on the tank.
Each radiator shall be provided with a drain
plug/valve at the bottom, an air release plug at
Amendment No.1 to Technical Specification
the top, shut off valve at each point of
connection to the tank
16. VI/B Volume 517/1178 8.00.00 ---- All instruments/ equipment etc. shall be suitable
II for highly corrosive environment prevalent in the
E1 coastal area.

17. VI/B Volume 766/1178 1.2 Complete design, engineering, manufacture, Complete design, engineering, manufacture,
V RS inspection, supply, transportation, storage, insurance, inspection, supply, transportation, storage,
civil work, erection, testing, commissioning and O&M of insurance, civil work, erection, testing,
the grid Solar PV plants including all auxiliaries. commissioning of the grid Solar PV plants
connected rooftop including all auxiliaries. connected rooftop

18. VI/B Volume 767/1178 1.6 Bidder to provide Operation and Maintenance (O&M) During trial run (minimum one day), bidder to
V RS of the plants for a period of one year from the date of demonstrate trouble free operation of all the rooftop
trial run of all the rooftop locations. During trial run locations.
(minimum one day), bidder to demonstrate trouble free
operation of all the rooftop locations. During O&M
period, the bidder shall be responsible for supply of all
spare parts as required from time to time for scheduled
and preventive maintenance, major overhauling of the
plant, replacement of all equipments in the plant
including defective PV Modules, Inverters,
Transformers etc and maintaining log sheets for
operation detail, deployment of staff for continuous
operations and qualified engineer for supervision of
O&M work, complaint logging & its attending. All PV
modules shall be cleaned regularly and water washed at
least once in a week
19 Section- Volume- 6 of 64 11.02.00 Supply of all Chemicals for complete water treatment Supply of all Chemicals for complete water
VI / III h) facilities for Six months (6) months of Operation after PG treatment facilities for One (01) year of Operation
Part-A test including first fill for all the systems as per system after PG test including first fill for all the systems as
requirements & as specified per system requirements / as specified
Amendment No.1 to Technical Specification
20. VI/A Volume 388/1178 36.05.00 Site management during construction phase till handing over of Site management during construction phase till handing
VII plant over of plant
Bidder shall ensure that the plant site within the plant boundary is Bidder shall ensure that the plant site within the plant
managed in a coordinated boundary is managed in a coordinated
and professional way all through the construction phase till and professional way all through the construction phase till
handing over of plant, ensuring handing over of plant, ensuring
safe, easy & unhindered working conditions and a healthy & safe, easy & unhindered working conditions and a healthy &
hygienic working environment at hygienic working environment at
site. He shall ensure the following measures at site while site. He shall ensure the following measures at site while
executing the project. executing the project.
a) Unhindered motorable road access to all work areas and a) Bidder shall finalize and submit the complete road layout
facilities both during the plan along with priority and
construction/erection and as they get completed progressively. completion schedule immediately after the award for
Required temporary review by the Employer. He shall ensure that the roads are
access roads other than the permanent roads shall also be promptly repaired and maintained against any damages
provided. Bidder shall due to movement of traffic/heavy trailers & cranes etc
prioritize the construction of approach roads, roads around the providing motorable access at all times.
main plant block, b) The plant site is fully secured against unauthorized
roads to office & storage areas and the offsite areas from the start access.
of project itself. c) Proper housekeeping by systematic and proper disposal
He shall finalize and submit the complete road layout plan along of wastes (from dismantling of pile tops, concrete works
with priority and etc), packing & insulation wastes, steel scrap, cable wastes
completion schedule immediately after the award for review by etc generated during construction / erection works.
the Employer. He shall ensure that the roads are promptly Suitable
repaired and maintained against any damages due to movement disposal sites for each of above shall be identified in the
of traffic/heavy trailers & cranes etc providing motorable access layout and at site in the beginning of the project itself. It
at all times. Adequate onsite stock of road materials shall be kept shall be ensured that all agencies engaged by the bidder
and follow the discipline to dispose off of earth spoils and
maintained disturbed over the site for repairs especially before wastes at the designated places. Preferably once in a week
the monsoon period. suitable time slot will be identified for housekeeping by all
b) Proper drainage of rain water, ground water from excavations, agencies and suitable instructions shall be issued in this
water flows from regard.
batching plant / construction sites etc. He shall prioritize the Bidder may engage a separate agency or identify a gang for
construction of collection of wastes and disposal to designated places.
permanent drains from the start of the project itself. Till such time Suitable arrangement / tie-up will also be made for periodic
the permanent drainage network is done, he shall construct disposal of wastes/ scrap from the designated places.
Amendment No.1 to Technical Specification
adequate temporary drains to ensure that there is no ………………………………………………………………………………
accumulation /stagnation of water in the plant site. Bidder may
consider providing pre-cast RCC drains for temporary/ permanent
drain construction
for faster construction of drains. The drain construction shall be
matched with
progress of road construction for preventing damage to roads.
Bidder shall provide
and maintain adequate number of drainage pumps (both electrical
and diesel operated) of suitable capacity for pumping out
accumulated water especially during the monsoon periods. All
drain diversions required shall be undertaken at the start of the
project itself.
c) The plant site is fully secured against unauthorized access.
d) Proper housekeeping by systematic and proper disposal of
earth from excavations(
separately for usable & surplus earth), muck (from pile bores or
otherwise), wastes
(from dismantling of pile tops, concrete works etc), packing &
insulation wastes, steel
scrap, cable wastes etc generated during construction / erection
works. Suitable
disposal sites for each of above shall be identified in the layout
and at site in the
beginning of the project itself. It shall be ensured that all
agencies engaged by the
bidder follow the discipline to dispose off of earth spoils and
wastes at the
designated places. Preferably once in a week suitable time slot
will be identified for
housekeeping by all agencies and suitable instructions shall be
issued in this regard.
Bidder may engage a separate agency or identify a gang for
collection of wastes and
disposal to designated places. Suitable arrangement / tie-up will
also be made for
Amendment No.1 to Technical Specification
periodic disposal of wastes/ scrap from the designated places.
…………………………

21. VI/A Volume 388/1178 36.05.00 First aid facilities and amenities like rest rooms, suitable pre First aid facilities and amenities like rest rooms, suitable pre
VII (h) engineered toilets ( engineered toilets (
separate for men and women), drinking water fountains/tanks, separate for men and women), drinking water
canteen, crèche for fountains/tanks, canteen, crèche for
women workers shall be planned and established at the women workers shall be planned and established at the
beginning of the project beginning of the project
itself. These facilities shall be distributed over the plant area to itself. These facilities shall be distributed over the plant
enable easy access area to enable easy access
by the construction workers and staff and shall be marked on the by the construction workers and staff and shall be marked
plant layout. on the plant layout
Suitable treatment for toilet discharge, like bio digesters etc shall
be planned and
conventional septic tanks / soak pits etc shall be avoided.
22. VI/A Volume- 514/1178 2.09.00 PLC based control system wherever PLC based control system shall be provided.
II envisaged shall be provided with
E1 100% redundancy i.e. Hot standby.

23. VI/B Volume II 522/1178 5.04.01 The excitation system shall have two The excitation system shall have AVR channels. The channel
E2 (2x100%) AVR channels including shall be equipped for ‘Auto
complete independent power Operation’ with the facility for
supplies and controls. Each channel selecting either channel in ‘Auto’ or
shall be equipped for ‘Auto ‘Manual’ mode.
Operation’ with the facility for
selecting either channel in ‘Auto’ or
‘Manual’ mode.

24. VI/A Volume 289/1178 5.06.00 Two (2) English language copies of all national and Deleted
VI international codes and/or standards used in the design of
the plant and equipment shall be provided by the
Amendment No.1 to Technical Specification
Contractor to the Employer within two calendar months
from the date of the Notification of Award.
25. VI/B Volume-I 12 of 35 7.00.00 The standby hydrant and spray system pumps shall be of DELETED
M4 iv) diesel engine driven.
26. VI/A Volume- 238/1178 2.00.00 2.(I) CEMS (SOx, NOx, CO, CO2, NMHC): - 2.(I) CEMS (SOx, NOx, CO, CO2, NMHC): -
III Measuring (a)…. (a)….
instruments (b)…. (b)….
…….. ……..
(Mandatory
spares –
C&I)
27. VI/B Volume 706/1178 4.00.00 (i) CEMS comprising of analysers and associated items for CEMS comprising of analysers and associated items for
IIIC measurement of SOx, NOx, CO, NMHC (Non-Methane measurement of SOx, NOx, CO, NMHC (Non-Methane
Hydrocarbon) (as C), and O2 measurement Hydrocarbon) (as C), and O2 measurement
…………………………………………………………. stack …………………………………………………………. stack
emission monitoring. emission monitoring.

28. VI/A Volume- 186/1178 3.03.00 (iii) Each stack shall be provided with continuous online NOx, SO2, CO Each stack shall be provided with continuous online NOx,
III & NMHC (Non-Methane hydrocarbons) analyser .... NOX, SO2, SO2 & CO & NMHC (Non-Methane hydrocarbons) analyser
NMHC and CO values ……… .... NOX, SO2, NMHC and CO values ………
instrumentation. instrumentation.

29. VI/A Volume- 256/1178 6.02.04 Online NOX, SO2, CO and NMHC monitoring of exhaust gas at each Online NOX, SO2 and CO and NMHC monitoring of exhaust
IV stack outlet shall be gas at each stack outlet shall be provided.
provided.

30. VI/A Volume 186/1178 6.00.00 Thermal Insulation Thermal Insulation


III All necessary Insulation including cladding, lagging, reinforcement, All necessary Insulation including cladding, lagging,
wire mesh, cleats, supports etc. reinforcement, wire mesh, cleats, supports etc.
for Engines (if applicable), piping, valves ducting, stacks etc. for Engines (if applicable), piping, valves ducting, stacks etc.
conforming to the requirements as conforming to the requirements as
brought out in the equipment specifications. brought out in the equipment specifications.
If thermal insulation for engine is applicable, it shall be as
per engine manufacturer standard practice.
Amendment No.1 to Technical Specification
31. VI/A Volume 249/1178 3.01.01 Further, Bidder may calculate Methane number / Heating Further, Bidder may calculate Methane number and
IV (a) value for calculating the guarantee performance. measure Heating value in presence of NVVN’s
representative for calculating the guarantee
performance.
32. VI/A Volume 398/1178 44.15.00 Safety Organisation Safety Organisation
VII The contractor employing more than 250 workmen whether 44.15.01 The contractor shall employ full time safety
temporary, casual, probationary, regular or permanent shall officer(s) as per requirement stipulated in
employ at least one full time safety officer exclusively to supervise NTPC Safety Rules, exclusively to supervise safety aspects of
safety aspects of …………………………………………………………….. the equipments and workmen, who will coordinate with the
………….. EIC with a copy to the Project Safety Officer before he NTPC Safety Officer. Further requirement of safety officers,
starts work or if any, shall be guided by Rule 209 of The Building and Other
immediately after any change of the incumbent is made during Construction Worker (Regulation of Employment and
currency of the Contract. Conditions of Service) Central Rule 1998. In case the work is
being carried out through subcontractor, the
employees / workmen of the sub-contractor shall also be
considered as the contractor's employees/workmen for the
above purpose.

44.15.02 The name and address of such Safety Officer of


the Contractor will be promptly
informed in writing to the EIC with a copy to the Project
Safety Officer before he starts work or immediately after
any change of the incumbent is made during currency of
the Contract.
33. VI/B Volume I, 426/1178 Insulation shall be 75 mm thick Un-bonded rock wool mattress as Insulation shall Light Resin Bonded (LRB) Mattress as per
M1 1.02.06 per IS 3690 type-2 at an application density of 64 kg/m³. Cladding IS8183 at an application density of 120-150 kg/m³.
(iv a) shall be Insulation thickness calculation shall be based on ASTM C-
aluminium sheet of 20 SWG. 680. Cladding shall be aluminium sheet of 20 SWG.
34. VI/A Volume- 190/1178 12.02.00 Fire Water Pumping System: Fire Water Pumping System:
III
a) Complete fire water pumping system consisting of two (2) Complete fire water pumping system consisting of two
nos. fire water storage tank, fire water pumps & drives (2) nos. fire water storage tank, one (1) no.
(common for hydrant system and spray system), batteries intermediate fire water tank, fire water pumps & drives
and battery chargers for the diesel engines drives, automatic (common for hydrant system and spray system), fire
pressurization system consisting of electric motor driven water transfer pumps & drives, batteries and battery
jockey pumps, required instruments, controls, and panels as chargers for the diesel engines drives, automatic
Amendment No.1 to Technical Specification
per the detailed specifications in Part-B of technical pressurization system consisting of electric motor
specification. driven jockey pumps, required instruments, controls,
and panels as per the detailed specifications in Part-B
of technical specification.
35. VI/A Volume- 222/1178 3.00.00, Above quantity/items are required for each type and rating of Note: Above quantity/items are required for each type
III 1.0 pumps being supplied under the contract and rating of pumps being supplied under the contract.
Further, main pumps mentioned above include both
“common hydrant & spray pumps” as well as “fire
water transfer pumps”
36. VI/B Volume-I 454/1178 Fire Water Source Fire Water Source
M4 1.03.00 Water for the Fire Protection system shall be drawn from fire Water for the Fire Protection system shall be drawn from
water storage tanks to be provided by the Bidder. Water for
fire water storage tanks to be provided by the Bidder.
filling up the fire water storage tanks shall be drawn from the
following two sources: Water for filling up the fire water storage tanks shall be
a) From service water tank drawn through fire water transfer pumps & inter
b) From rain water harvesting tank as second source. intermediate fire water tank. There shall be two sources
Fill in line from above two sources shall be in the of water to fill intermediate fire water tank:
scope of vendor. Bidder shall interconnect the same to each
a) service water tanks as primary source.
of the fire water tank through individual motorized isolation
valve. b) rain water harvesting tank as second source.
Intermediate fire water tank shall be filled with the help
of service water pumps and harvested rain water
pumps. Fill in line from above two sources shall be in
the scope of vendor. Bidder shall interconnect the
same to intermediate fire water tank through individual
motorized isolation valve.
37. VI/A Volume- 190/1178 12.02.00 Fire Water Pumping System: Fire Water Pumping System:
III
a) Complete fire water pumping system consisting of two (2) Complete fire water pumping system consisting of two
nos. fire water storage tank, fire water pumps & drives (2) nos. fire water storage tank, one (1) no.
(common for hydrant system and spray system), batteries intermediate fire water tank, fire water pumps & drives
and battery chargers for the diesel engines drives, automatic (common for hydrant system and spray system), fire
pressurization system consisting of electric motor driven water transfer pumps & drives, batteries and battery
jockey pumps, required instruments, controls, and panels as chargers for the diesel engines drives, automatic
per the detailed specifications in Part-B of technical pressurization system consisting of electric motor
specification. driven jockey pumps, required instruments, controls,
and panels as per the detailed specifications in Part-B
of technical specification.
38. VI/B Volume-I 466/1178 7.00.00 -------------------------------- Following clause has been added:
Amendment No.1 to Technical Specification
M4 (xiii) Intermediate Fire Water Tanks: One (1) number
vertical cylindrical column supported fixed cone roof
type MS fire water storage tank shall be provided by
the bidder. To avoid vacuum creation inside the tank,
two (2) nos. vents each of size min. 150 NB shall be
provided on the roof of the tanks. Minimum effective
capacity of intermediate fire water tank shall be 500
m3.
39. VI/B Volume-I 469/1178 Annexure- Annexure-II (Technical Design Data) has been revised and To meet TAC guidelines
M4 II is attached as Annexure to this amendment.
40. VI/A Volume 189/1178 11.02.00 Service water system: Service water tanks (2x100%), Service water system: Service water tanks
III d) Service water pumps (2x100%), Service water pumps
(2x100%), all piping/valves/fittings for Service water (2x100%), Rainwater Harvesting Pumps
system. (2x100%), all associated piping/valves/fittings for
Service water system.

Note: - In addition to cater plant service water


requirements, service water pumps &
rainwater harvesting pumps shall also be used
to fill intermittent tank further used to cater
plant fire water requirements.