Materials
Trade
Description Unit Basic Price
FLOOR Bricks Nr
Concrete Mixer
day 1,200.00
operator
2 Anti Corrosive Primer M-002 litre 245.00 2 Plumber L-002 Day 3,500.00 2 Hire of Vibrator P-002 Day 1,000.00
3 Asbestos Corrugated Sheet M-003 Sq.ft 26.00 3 SK Labour L-003 Day 3,500.00 3 Vibrating Rammer P-003 Day 1,000.00
152 Tor Steel Rods including transport to site M-152 Kg. 68.00
S
Activity
1 Site Preparation & Excavation
5 Concrete Works
6 Formwork Note
8 Block Work
9 Brick Work
10 Roof
13 Plastering
14 Tiling
15 Ceiling
16 Painting
ok
Downs of all trades are according to the Building Schedule of Rates of the Department of Buildings.
Page 21 Of 112
Excavation in trenches for walls column pits in ordinary soil from 0' 0" to 5' 0" deep and depositing
01.B.03
excavated material not exceeding 30' 0"
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 2.25 2,500.00 5,625.00
Excavation in trenches for walls / column pits in hard/dense soil up to a depth of 5' 0" and depositing
01.B.04
excavated material to distance not exceeding 30' 0"
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 3.5 2,500.00 8,750.00
Excavation in trenches for walls column pits in mud/wet soil upto the depth of 5' 0" and depositing
01.B.05
excavated material not exceeding 30' 0"
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 3 2,500.00 7,500.00
Excavation in trenches for walls column pits in soft disintegrated rock (not requiring blasting)upto
01.B.06
depth of 5' 0" and depositing excavated material to a distance not exceeding 30' 0"
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 U / SK Labourer L-007 Day 2.5 2,500.00 6,250.00
SDS 02/24/2025
Page 22 Of 112
Excavation in trenches for walls column pits in Hard rock requiring Blasting upto depth of 5' 0" and
01.B.07
depositing excavated material to a distance not exceeding 30' 0"
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1 Blasting Powder M-007 Lbs 0.75 200.00 150.00
SDS 02/24/2025
Page 23 Of 112
SDS 02/24/2025
Page 24 Of 112
Backfilling
Filling under floors including levelling, watering & compacting in 3" layers with available and
02.A.03
selected earth at site
Analysis for 1 Cube
No Item Description Item Ref Unit Quantity Rate Amount
1.02 U / SK Labourer L-007 Day 2 2,500.00 5,000.00
SDS 02/24/2025
Page 25 Of 112
SDS 02/24/2025
Page 26 Of 112
03. Anti termite Treatment & DPC
03.A.01 Anti-Termite treatment on excavated foundation and compacted soil under floors.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1 D. D. T. Powder M-038 Lbs 16 25.00 400.00
DPC
3/4" thick DPC in cement sand 1:2 finished with 2 coats hot tar and blinded with
03.B.01
sand.
Analysis for 1 Sqr
2
2 Mixing Concrete 1: 2 1/2: 5 (1 ")
2 Per Cube Unit Qty Rate @ Amount
2 Materials
2 1 Cement cwt 14 2,850.00 39,900.00
2 2 Sand cubes 0.6 27,000.00 16,200.00
2 3 1 1/2" Metal cubes 0.9 0.00 -
2 Material cost 56,100.00
2 allow for Material Transport 0 -
2 Total Material cost 56,100.00
2 Machinary
2 1 Mixer hiling charges day 0.33 1,500.00 495.00
2 Laborers
2 1 Skilled laborers day 1 3,500.00 3,500.00
2 2 Unskilled laborers day 6 2,500.00 15,000.00
2 Total 75,095.00
2 Over Head and Profit 0 -
2 Rate Per Cube 75,095.00
1 Rate Per M3 26,535.34
2
3
3 Mixing Concrete 1: 2: 4 (3/4 ")
3 Per Cube Unit Qty Rate @ Amount
3 Materials
3 1 Cement cwt 18 2,850.00 51,300.00
3 2 Sand cubes 0.5 27,000.00 13,500.00
3 3 3/4" Metal cubes 0.88 17,000.00 14,960.00
3 Material cost 79,760.00
3 allow for Material Transport 0% -
3 Total Material cost 79,760.00
3 Machinary
3 1 Mixer hiring charges day 0.33 1,500.00 495.00
3 Laborers
3 1 Skilled laborers day 1 3,500.00 3,500.00
3 2 Unskilled laborers day 6 2,500.00 15,000.00
3 Total 98,755.00
3 Over Head and Profit -
3 Rate Per Cube 98,755.00
1 Rate Per M 3 34,895.76
3
4
4 Mixing Concrete 1: 1 1/2: 3 (3/4 ")
4 Per Cube Unit Qty Rate @ Amount
4 Materials
4 1 Cement cwt 23 2,850.00 65,550.00
4 2 Sand cubes 0.42 27,000.00 11,340.00
4 3 3/4" Metal cubes 0.82 17,000.00 13,940.00
4 Material cost 90,830.00
4 allow for Material Transport 0 -
4 Total Material cost 90,830.00
4 Machinary
4 1 Mixer hiling charges day 0.33 1,500.00 495.00
4 Laborers
4 1 Skilled laborers day 1 3,500.00 3,500.00
4 2 Unskilled laborers day 6 2,500.00 15,000.00
4 Total 109,825.00
4 Over Head and Profit 0 -
4 Rate Per Cube 109,825.00
1 Rate Per M 3 38,807.42
4
5 50mm thick (1:3:6 (1 1/2")) cement concrete screed in foundation at depths not exceeding
1500mm
5 Per square Unit Qty Rate @ Amount
5 Concrete mixing cost
5 Materials
5 1 Cement cwt 2.17 2,850.00 6,184.50
5 2 Sand cubes 0.09 27,000.00 2,430.00
5 3 3/4" Metal cubes 0.15 17,000.00 2,550.00
5 Material cost 11,164.50
5 allow for Material Transport 0 -
5 Total Material cost 11,164.50
5 Machinary
5 1 Mixer hiling charges day 0.06 1,500.00 90.00
5 Laborers
5 1 Skilled laborers day 0.17 3,500.00 595.00
5 2 Unskilled laborers day 1 2,500.00 2,500.00
5 Total 14,349.50
5 add for wastages 10 % 0.1 1,434.95
5 Concrete Placing cost
5 Laborers
5 1 Skilled laborers day 0.13 3,500.00 455.00
5 2 Unskilled laborers day 0.5 2,500.00 1,250.00
5 Total 17,489.45
5 Over Head and Profit 0 -
5 Rate Per square 17,489.45
5
6 75mm thick (1:3:6 (1 1/2")) cement concrete screed in foundation at depths not exceeding
1500mm
6 Per square Unit Qty Rate @ Amount
6 Concrete mixing cost
6 Materials
6 1 Cement cwt 3.25 2,850.00 9,262.50
6 2 Sand cubes 0.13 27,000.00 3,510.00
6 3 3/4" Metal cubes 0.23 17,000.00 3,910.00
6 Material cost 16,682.50
6 allow for Material Transport 0 -
6 Total Material cost 16,682.50
6 Machinary
6 1 Mixer hiling charges day 0.08 1,500.00 120.00
6 Laborers
6 1 Skilled laborers day 0.25 3,500.00 875.00
6 2 Unskilled laborers day 1.5 2,500.00 3,750.00
6 Total 21,427.50
6 add for wastages 10 % 0.1 2,142.75
6 Concrete Placing cost
6 Laborers
6 1 Skilled laborers day 0.13 3,500.00 455.00
6 2 Unskilled laborers day 0.75 2,500.00 1,875.00
6 Total 25,900.25
6 Over Head and Profit 0 -
6 Rate Per square 25,900.25
7
7 150mm thick (1:2 1/2 :5 (1")) cement concrete (floor Mass concrete)
7 Per square Unit Qty Rate @ Amount
7 Concrete mixing cost
7 Materials
7 1 Cement cwt 7 2,850.00 19,950.00
7 2 Sand cubes 0.3 27,000.00 8,100.00
7 3 3/4" Metal cubes 0.45 17,000.00 7,650.00
7 Material cost 35,700.00
7 allow for Material Transport 0 -
7 Total Material cost 35,700.00
7 Machinary
7 1 Mixer hiling charges day 0.17 1,500.00 255.00
7 Laborers
7 1 Skilled laborers day 0.5 3,500.00 1,750.00
7 2 Unskilled laborers day 3 2,500.00 7,500.00
7 Total 45,205.00
7 add for wastages 5 % 0.05 2,260.25
7 Concrete Placing cost
7 Laborers
7 1 Skilled laborers day 0.5 3,500.00 1,750.00
7 2 Unskilled laborers day 1.5 2,500.00 3,750.00
7 Total 52,965.25
7 Over Head and Profit 0 -
7 Rate Per square 52,965.25
7
Note
Note
Note
Note
Note
Note
Note
Note
Page 38 Of 112
06.A.01 Sawn timber formwork to 9" x 9" cement concrete column in ground floor.
Analysis for 0.15 Sq
No Item Description Item Ref Unit Quantity Rate Amount
Sawn timber formwork to 9" x 9" cement concrete
1.01 06.A.02 1 Use 1 1,206.00 1,206.00
column in ground floor - Making Mould
1.02 Bolts 16mm 18" (12 nos 20 uses) M-010 No 0.6 75.00 45.00
1.04 Timber props 4" x 2" M-144 L.ft 3.5 65.00 227.50
1.07 Carpenter - dismantling, cleaning & repairing L-008 Day 0.25 3,500.00 875.00
U / SK Labourer - dismantling, cleaning &
1.08 L-007 Day 0.25 2,500.00 625.00
repairing
Total for 0.15 Sq 4,496.00
Rate for 1 Sq 29,973.33
Rate(Say) 1Sq 29,973.00
Rate(Say) 1ft2 299.73
Rate(Say) 1m2 3,225.09
Ground floor - First Floor 1m2 3,225.09
First Floor - Second Floor 1m2 3,547.60
Second Floor - Third Floor 1m2 3,902.36
Third Floor - Fourth Floor 1m2 4,292.60
06.A.02 Sawn timber formwork to 9" x 9" cement concrete column in ground floor - Making Mould
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Thick Class II Timber M-141 Sq.ft 18.15 65.00 1,179.75
1.02 2" x 2" Class II Timber In Yokes M-143 L.ft 17.1 22.00 376.20
1.03 2" x 1" Class II Timber Battens. M-142 L.ft 16.12 12.00 193.44
Beam
SDS 02/24/2025
Page 39 Of 112
1.08 Carpenter - dismantling, cleaning & repairing L-008 Day 0.5 3,500.00 1,750.00
06.B.02 Sawn timber formwork for 9" x 12" concrete beams in ground floor - Making the mould
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Thick Class II Timber M-141 Sq.ft 60 65.00 3,900.00
1.02 2" x 1" Class II Timber Battens. M-142 L.ft 24 12.00 288.00
1.03 2" x 2" Class II Timber In Yokes M-143 L.ft 45 22.00 990.00
1.04 4"X2" Timber bearers M-144 L.ft 30 65.00 1,950.00
1.05 Wire Nails M-161 Lbs 2 50.00 100.00
1.06 Carpenter L-008 Day 1.5 3,500.00 5,250.00
1.07 U / SK Labourer L-007 Day 2 2,500.00 5,000.00
Total for 4 Uses 17,478.00
Rate for 1 Uses 4,369.50
Rate(Say) 1 Use 4,370.00
SDS 02/24/2025
Page 40 Of 112
06.B.03 Sawn timber formwork for concrete beams in ground floor-Assembling - Materials
Analysis for 6 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber props 4" x 2" M-144 L.ft 110 65.00 7,150.00
1.02 2" x 2" Class II Timber for bracings M-143 L.ft 80 22.00 1,760.00
1.03 1" Thick Class II Timber base plate M-141 Sq.ft 6 65.00 390.00
1.04 Timber Wedges M-151 No 22 5.00 110.00
Total for 6 Uses 9,410.00
Rate for 1 Uses 1,568.33
Rate(Say) 1 Use 1,568.00
Slab
06.C.02 Sawn timber formwork for 20" x 10" concrete slab in ground floor - Making panels
Analysis for 4 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 1" Thick Class II Timber M-141 Sq.ft 220 65.00 14,300.00
SDS 02/24/2025
Page 41 Of 112
1.02 Timber props 4" x 2" M-144 L.ft 121 65.00 7,865.00
1.03 Wire Nails M-161 Lbs 4 50.00 200.00
1.04 Carpenter L-008 Day 3 3,500.00 10,500.00
1.05 U / SK Labourer L-007 Day 3 2,500.00 7,500.00
Total for 4 Uses 40,365.00
Rate for 1 Uses 10,091.25
Rate(Say) 10,091.00
06.C.03 Sawn timber formwork for underside of first floor slab - Assembling
Analysis for 6 Uses
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Timber props 4" x 2" M-144 L.ft 690 65.00 44,850.00
1.02 2" x 2" Class II Timber In Yokes M-143 L.ft 66 22.00 1,452.00
1.03 Timber Wedges M-151 No 122 5.00 610.00
1.04 1" Thick Class II Timber M-141 Sq.ft 33 65.00 2,145.00
Total for 6 Uses 49,057.00
Rate for 1 Uses 8,176.17
Rate(Say) 8,176.00
SDS 02/24/2025
Page 42 Of 112
07. Reinforcement
Tor steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.01
with G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 M.S./Tor Steel Rods including transport to site M-152 kg 50 68.00 3,400.00
Mild Steel reinforcement to lintels, slabs, beams or columns bent to shape, laid in position and tied
7.02
with G.I. Wire as directed.
Analysis for 1 Cwt.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 M.S./Tor Steel Rods including transport to site M-068 kg 50 68.00 3,400.00
5.328 0.125
120
6000
Page 44 Of 112
08.01 8" Thick hollow block work in cement and sand mortar 1:5 in ground floor (Cavities unfilled)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Hollow Cement Block (16"x 8"x 8") M-057 No 112 30.00 3,360.00
08.02 6" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Hollow Cement Blocks (16"x 8"x 6") M-059 No 112 22.00 2,464.00
08.03 4" Thick hollow block work in cement and sand mortar 1:5 with cavities unfilled.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Hollow Cement Blocks (16"x 8"x 4") M-058 No 112 27.00 3,024.00
09.01 Brick Work in cement sand 1:5 in 4-1/2" thick walls in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Bricks M-019 No 550 5.50 3,025.00
1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 151.25
1.03 Cement M-026 Bag 1.3 2,850.00 3,705.00
09.02 9" thick brick wall cement sand 1:5 in ground floor
09.05 Brick Work 13 1/2" thick in cement sand 1:5 in superstructure in ground floor
09.06 9" Brick Walls in cement sand 1:8 in superstructure in ground floor
4 1/2" Thick Brick Walls (wire cut) in cement sand 1:5 in superstructure in ground floor (facing to
09.07
brickwork measured separately)
Analysis for 1 Sqr
09.08 9" Thick in Cement and Sand 1:5 with wire cut Bricks (Facing to brickwork measured separately)
Analysis for 1 Sq
13 1/2" Thick Brick wall (wire cut) in cement and sand 1:5 in ground floor (Facing to brickwork
09.10
measured separately)
Analysis for 1 Sqr
Extra over for facing including raised pointing 1/8" thick in cement and sand 1:1 mixture in ground
09.11
floor
Analysis for 1 Sqr
09.12 3" Thick floor paved in lime mortar 2:5 in ground floor
Steps 1' -1 1/2" x 0' 6" in brick in cement and sand 1:5 with 1/2" thick cement and sand 1:2
09.13
rendering including necessary excavation.
Analysis for 10 L.ft
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.14
rendering 1/2" thick 1:2 to exposed faces with 1' 6" ramp including necessary excavation.
Analysis for 10 L.ft
Brick Drain in cement and sand 1:5 mix, 9" wide and 6"-9" average depth including cement
09.15
rendering 1/2" thick 1:2 to exposed faces without ramp including necessary excavation.
Analysis for 10 L.ft
Timber framework for culicut pattern tile hip roof in single storey building consisting of wall plate ,
10.A.01
beam, ridge plate, rafters etc.(Preservative treatment to be measured separately)
Analysis for 6 Sqrs
10.A.02 Roof Covering With calicut pattern clay tiles in single storeyed building
10.A.03 Timber framework for corrugated asbestos sheet roof in single storeyed building
Roof covering with corrugated asbestos sheets (Timber frame work and ridge covering measured
10.A.04
separately)
Analysis for 3.6 Sqrs
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Asbestos Corrugated M-003 Sq.ft 420 26.00 10,920.00
10.A.05 One layer half round clay tiles over corrugated asbestos roof covering
10.A.06 Asbestos close fittings ridging fixed complete with roofing screws or bolts (hook)
10.A.07 Ridging covering with calicut pattern ridge tiles bedded in cement lime mortar 1:1:4
10.A.08 3/4" X 9" high valance board fixed with brass screws to ends of rafters (For tile roofing)
10.A.09 3/4" X 9" high barge board fixed with brass screws at 2 ft. 0"centres to side of rafters
Roof Plumbing
18 B.W.G (1.2 mm) galvanised iron sheet valley gutter 3' 0" girth over all once bent with end laps
10.B.01 not less than 9" width including 3/4" tongued and grooved planks laid to slope and profile on timber
members.
Analysis for 15 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Sheet (8'X4') M-052 Sheet 2 2,200.00 4,400.00
18 B.W.G (1.2 mm) GI Flashing 1' 6" girth overall 3 thies bent with end laps not less than 6",
10.B.02 soldered, turned and tucked up to not less than 6" into chase cut in wall and pointed in 1:2 mortar,
lower end dressed over roof covering not less than 1' 0" wide
Analysis for 15 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Sheet (8'X4') M-052 Sheet 1 2,200.00 2,200.00
6" half round PVC eave gutter fixed to timber valance board including gutter joiner and brackets
10.B.03
fixed at 18" centres (other specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 6" eave gutter lengths (12' each) M-088 No 2 0.00 -
3 1/2" PVC rain water down pipes fixed to brick wall with wooden plugs buried in wall (other
10.B.07
specials paid seperately)
Analysis for 24 L.ft.
No Item Description Item Ref Unit Quantity Rate Amount
1.01 3 1/2" down pipe lengths (12' each) M-078 No 2 0.00 -
valance board
barge board
Page 64 Of 112
Page 65 Of 112
Door Single Hung 3' 3" X7' 0" high overall with frame having 1 1/4" thick sash and 3
11.A.01
1/4" X 2 1/4 ft. timber frame(glazing, ironmongery & painting measured separately)
1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00
Door glazed and paneled double hung 4' 0" x 7' 0" high overall with frame including
11.A.02 1 1/4" thick sash and 3 1/4 x 2 1/4" frame (Glazing, Ironmongory and painting
measured separately)
Analysis for 28 Sq.ft
1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00
Plywood door single hung 3' 1-1/2" x 6' 11-1/2" overall with frame having 1-1/4"
11.A.03 thick sash and 3 1/4" x 2 1/4" frame (Glazing, Ironmongory and painting measured
separately)
Analysis for 21.75 Sq.ft
1.05 6' 9" X 2' 9" Plywood Sash M-074 No 1 2,000.00 2,000.00
Door Ledged, braced and battened single hung 2' 6" x 6' 6" overall,with frame
11.A.04 having 7/8" thick tongued & Grooved planks and 3-1/4" x 2-3/4"frame (Glazing,
Ironmongory and painting measured separately)
Analysis for 16.25 Sq.ft
1.05 5/8" Mild Steel Dowels 4" Long. M-067 No 2 6.00 12.00
window, Glazed 7'. 0" x 4' 0" High overall with frame comprising 3 No openable
11.A.05 sashes and 3 1/4" x 2 1/4" frame and mullions (Glazing, Ironmongory and painting
measured separately)
Analysis for 28 Sq.ft
1/8" clear sheet glass panes exceeding 1' 0" but not exceeding 4 squere feet cut
11.A.06
and fixed with timber beadings to doors and windows.
Analysis for 9 Sq.ft
Ironmongery
Page 68 Of 112
11.B.01 Butt Hinges 5" X 2 1/2" Brass
Analysis for 1 No
Analysis for 4 No
Analysis for 1 No
Analysis for 1 No
Analysis for 1 No
Analysis for 6 No
Analysis for 6 No
Analysis for 6 No
12.01 1/2 " Diameter PVC pipes fixed to walls (Specials paid separately)
12.02 3/4 " Diameter PVC pipes fixed to walls (Specials paid separately)
12.03 1 " Diameter PVC pipes fixed to walls (Specials paid separately)
12.05 1 1/2" Diameter PVC pipes fixed to walls (Specials paid separately)
12.06 2" Diameter PVC pipes fixed to walls (Specials paid separately)
12.07 3" Diameter PVC pipes fixed to walls (Specials paid separately) Type 1000
Excavation for laying 1/2 " to 3" dia meter PVC pipes in ground not less than 1' 6"
12.08
Deep, Backfilling & Compacting
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Chasing brickwork for laying 1/2" to 1 1/2 " dia PVC pipes and making good average
12.09
depth 2" (Pipes and specials paid separately)
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Chasing brickwork for laying 1 1/2" to 3 " dia PVC pipes in ground and floor and
12.10
making good. average depth 3" (Pipes and specials measured paid separately)
Analysis for 100 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Page 78 Of 112
1.01 2 1/2" PVC Elbows / Bent / Socket M-084 No 10 350.00 3,500.00
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
Analysis for 10 No
No Item Description Item Ref Unit Quantity Rate Amount
A. Wall Plastering
B. Rendering
C. Sofit Plastering
D. Skirting
Wall Plastering
13.A.01 5/8" thick plastering to wall in Cement and sand 1:3 including Cement floating
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.A.02 5/8" thick to wall in cement and sand 1:5 finished semi-rough with wooden float.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
5/8" thick to wall in lime cement and sand 1:1:5 finished semi-rough with wooden
13.A.03
float.
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
5/8" thick Plastering to wall in lime cement and sand 1:1:5 finished smooth with
13.A.04
lime putty floating.
Analysis for 1 Sqr
13.A.05 5/8" thick plastering to wall in lime and sand 2:5 including floating with lime putty.
Analysis for 1 Sqr
Rendering
13.B.01 3/4" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.B.02 1/2" thick rendering in cement and sand 1:3 finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
13.B.03 1/2" thick rendering in cement and sand 1:2 in floors, finished smooth
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
` 1.01 Cement M-026 Bag 1.5 2,850.00 4,275.00
13.B.04 3/4" thick rendering in cement and sand 1:2 in floors finished smooth
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
3/4" thick rendering in cement and sand 1:2 in colored cement floors finished
13.B.05
smooth
Analysis for 1 Sqr
Sofit Plastering
3/8" thick plastering to Soffit Slab in Cement and sand 1:3 including floating with
13.C.01
Lime putty
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
3/8" thick plastering to sides and softfit of beams in Cement and sand 1:3 including
13.C.02
floating with Lime putty
Analysis for 1 Sq
Skirting
1/2" x 6" Skirting in cement and sand 1:3 projected or flush to walls finished with
13.D.01
floating including forming groove
Analysis for 10 L.ft
No Item Description Item Ref Unit Quantity Rate Amount
Rate(Say) 1m 820.00
Page 88 Of 112
Ground floor 1m 820.00
First Floor 1m 902.00
Second Floor 1m 992.20
3rd floor 1m 1,091.42
Page 89 Of 112
Page 90 Of 112
Page 91 Of 112
Page 92 Of 112
Page 93 Of 112
14. Tilling
A. Wall Tilling
B. Floor Tilling
Wall Tilling
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.01
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (6''x6") M-155 No 400 75.00 30,000.00
1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 3,000.00
1.03 Cement M-026 Bag 2.5 2,850.00 7,125.00
1.04 Sand M-113 Cu 0.11 27,000.00 2,970.00
1.05 White Cement M-159 Lbs 1 17.50 17.50
1.06 Mason L-009 Day 4 3,500.00 14,000.00
1.07 U / SK Labourer L-007 Day 4 2,500.00 10,000.00
1.08 U / SK Labourer L-007 Day 0.25 2,500.00 625.00
Total for 1 Sqr 67,737.50
Rate for 1 Sqr 67,737.50
Rate(Say) 1Sq 67,738.00
Rate(Say) 1ft2 677.38
Rate(Say) 1m2 7,288.61
Ground floor 1m2 7,288.61
First Floor 1m2 8,017.47
Second Floor 1m2 8,819.22
Third Floor 1m2 9,701.14
Glazed tiles fixed to walls including bedding in cement mortar 1:2 and raking in ground floor.
14.A.02
(Specials measured separately)
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Glazed Tiles (8''x12") M-156 No 150 100.00 15,000.00
1.02 Allow 10% of Items ( 1.01 ) for Wastage - - - - 1,500.00
1.03 Cement M-026 Bag 2.5 2,850.00 7,125.00
1.04 Sand M-113 Cu 0.11 27,000.00 2,970.00
1.05 White Cement M-159 Lbs 1 17.50 17.50
1.06 Mason L-009 Day 4 3,500.00 14,000.00
1.07 U / SK Labourer L-007 Day 4 2,500.00 10,000.00
1.08 U / SK Labourer L-007 Day 0.25 2,500.00 625.00
Total for 1 Sqr 51,237.50
Page 94 Of 112
Rate for 1 Sqr 51,237.50
Rate(Say) 1Sq 51,238.00
Rate(Say) 1ft2 512.38
Rate(Say) 1m2 5,513.21
Ground floor 1m2 5,513.21
First Floor 1m2 6,064.53
Second Floor 1m2 6,670.98
Third Floor 1m2 7,338.08
Floor Tilling
14.B.01 Terrazzo floor tiles on 1/2" thick cement and sand 1:2 in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Terrazzo Tiles 12" X 12" M-132 No 100 150.00 15,000.00
1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 750.00
1.03 Cement M-026 Bag 1.25 2,850.00 3,562.50
1.04 Sand M-113 Cu 0.07 27,000.00 1,890.00
1.05 Coloured Pigment M-035 Lbs 2 175.00 350.00
1.06 Wax Polish M-158 Lbs 0.5 150.00 75.00
1.07 Cotton Waste M-037 Lbs 2 12.50 25.00
1.08 Mason L-009 Day 4 3,500.00 14,000.00
1.09 U / SK Labourer L-007 Day 3 2,500.00 7,500.00
1.10 U / SK Labourer L-007 Day 0.5 2,500.00 1,250.00
Total for 1 Sqr 44,402.50
14.B.02 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and pointing in neat cement in ground floor
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Pressed Tiles 8" X 8" M-130 No 225 75.00 16,875.00
1.02 Allow 5% of Items ( 1.01 ) for Wastage - - - - 843.75
1.03 Cement M-026 Bag 1.25 2,850.00 3,562.50
1.04 Sand M-113 Cu 0.07 27,000.00 1,890.00
Page 95 Of 112
1.05 Colouring Powder M-036 Lbs 0.25 175.00 43.75
1.06 Cotton Waste M-037 Lbs 2 12.50 25.00
1.07 Mason L-009 Day 4 3,500.00 14,000.00
1.08 U / SK Labourer L-007 Day 4 2,500.00 10,000.00
1.09 U / SK Labourer L-007 Day 0.5 2,500.00 1,250.00
Total for 1 Sqr 48,490.00
Rate for 1 Sqr 48,490.00
Rate(Say) 1Sq 48,490.00
Rate(Say) 1ft2 484.90
Timber Framework for 4' 0"x4' 0" flat asbestos ceiling (Sheet Measured separately)
15.01
Comprising of 4"x2" joists and 2"x2" bearers in class 1 timber
Horizontal ceiling lining using 4' 0"x4' 0" flat asbestos cement sheets fixed with and including
15.02
beading and cove mouldings on timber framework(Timber, framework, painting m/separately)
3/4" thick tongued and grooved Lunumidella ceiling boards fixed horizontal on 4"X2" class I
15.03
timber Joists at 2' 0" centres with 1 1/2 " Brass Nails
1.02 6" x 3/4" Lunumidella Ceiling Planks. M-135 Sq.ft 215 28.00 6,020.00
3/4" X 6" wide tongued and grooved Lunumidella ceiling boards fixed to underside of roof
15.04
rafters. (Existing) with 1 1/2" brass nails including levelling with timber strips where necessary
1.01 6" x 3/4" Lunumidella Ceiling Planks. M-135 Sq.ft 220 28.00 6,160.00
A. Wall
B. Sofit
C. Wood
D. Steel
Wall
16.A.01 Preparing and apply one coat of Alkali resistant primer and two coats of emulsion paint to walls.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 180.00 162.00
1.02 Emulsion Paint M-043 litre 1.4 280.00 392.00
1.03 Water M-157 Gal 0.1 0.30 0.03
1.04 6" Brush M-021 No 0.1 495.00 49.50
1.05 Sand Papers M-114 Sheet 2 3.50 7.00
1.06 Painter L-001 Day 1.25 3,500.00 4,375.00
Soffit
Preparing and apply one coat of alkali resistant primer and two coats of emulsion paint to soffit of
16.B.01
slabs
Analysis for 1 Sq
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.9 180.00 162.00
1.02 Emulsion Paint M-043 litre 1.5 280.00 420.00
1.03 Water M-157 Gal 0.1 0.30 0.03
1.04 6" Brush M-021 No 0.1 495.00 49.50
1.05 Painter L-001 Day 1.75 3,500.00 6,125.00
Wood
Prepare and apply one coat of preservative (oil type) to structural timber including touching up cut
16.C.01
ends etc. after fixing.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Wood Preservative M-165 Gal 0.605 450.00 272.25
16.C.02 Painting new timber work with two coats wood preservative
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Wood Preservative M-165 Gal 0.5 450.00 225.00
16.C.03 Preparing and painting wood work with primer and 2 coats Enamel paint
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Primer M-075 litre 0.75 180.00 135.00
Steel
16.D.01 Prepare surface of steel trusses and apply two coats of anticorrosive primer.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 2.25 245.00 551.25
Apply one coat of anti-Corrosive primer and two coat enamel paint on already shop primed and
16.D.02
erected steel roof truss.
Analysis for 1 Sqr
No Item Description Item Ref Unit Quantity Rate Amount
1.01 Anti Corrosive Primer M-002 litre 0.2 245.00 49.00
16.D.03 Prepare and apply two coats primer and finishing soat of enamel paint to mild steel (angle/flat) gate.