Demo Industrial Projects all India

The document lists various projects across different industries in India, detailing their titles, values, statuses, and locations. Many projects are in the planning or execution stages, with some already commissioned or abandoned. Key sectors include manufacturing, process industries, and engineering, with a focus on chemicals, metals, and pharmaceuticals.

Uploaded by

joshi11atul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views16 pages

Demo Industrial Projects all India

The document lists various projects across different industries in India, detailing their titles, values, statuses, and locations. Many projects are in the planning or execution stages, with some already commissioned or abandoned. Key sectors include manufacturing, process industries, and engineering, with a focus on chemicals, metals, and pharmaceuticals.

Uploaded by

joshi11atul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

SrNo.

Project Title Project Value Industry Status of the Project

1 Synergia Life Scien 0 Process Industries > Drugs & Pharma > Planning

2 Patan Sugarcane Ind 0 Manufacturing > Sugar Under Execution

3 Mukand plans to set


Rs 30 Crore Manufacturing > Metal > Iron & Steel Under Execution

4 Om Sponge plans to 0 Manufacturing > Metal > Iron & Steel Under Execution

5 Maa Danteshwari Mai 0 Process Industries > Chemical > Distilla Commissioned

6 Virchow Petrochemi 0 Process Industries > Drugs & Pharma Under Execution

7 Rudra Labs is sett 0 Process Industries > Drugs & Pharma Hold/Abandoned

8 Eco Steel India pl 152.11 Cr. Process Industries > Chemical > Distilla Planning

9 SIP Chemical IndusRs 5.10 Crore Process Industries > Chemical > Synthe Commissioned

10 Vasudha ChemicalsRsP 5.37 Crores Process Industries > Chemical > Synthe Hold/Abandoned

11 Prism Advance Tech


Rs 102.69 crore Process Industries > Chemical > Distilla Planning
12 Construction of grai 0 Process Industries > Chemical > Distilla Commissioned

13 Nolvox Pharma is s 0 Process Industries > Drugs & Pharma Planning

14 Bharat Rasayan is Rs 380 crore Process Industries > Chemical > Agro C Hold/Abandoned

15 Win Waste Managem


15 Cr. Process Industries > Solid Waste recylinPlanning

16 Shree Hari Dyes An 0 Process Industries > Chemical > Synthe Planning

17 Nirma is setting up950 Cr. Manufacturing > Cement & Ceramics > Under Execution

18 Blackrock Steel & PRs 94.97 Cr. Manufacturing > Metal > Iron & Steel Planning

19 High Court of Megh 0 Manufacturing > Engineering > Electric Planning

20 Expansion of exist Rs 6746.23 cr Process Industries > Fertiliser Commissioned

21 Aloke Steels is set Rs 912 Cr Manufacturing > Metal > Iron & Steel Planning

22 Supreme Sugars is 250


s Cr. Process Industries > Chemical > Distilla Planning

23 Parad Corporation 6i Cr. Process Industries > Chemical Commissioned

24 Vibrant Fine Chem14


i Cr. Process Industries > Chemical > SpecialPlanning

25 Vasudha Chemicals P 0 Process Industries > Chemical > Synthe Under Execution

26 Atibir Hi-Tech Priv Rs 51.49 Cr Manufacturing > Metal > Iron & Steel Planning

27 Rashi Steel & Power


Rs 1362 Cr Manufacturing > Metal > Iron & Steel Planning
28 Council of Scientif 0 Process Industries > Chemical Commissioned

29 Vikalp Bio and Disti 0 Process Industries > Chemical > Distilla Planning

30 Badami Sugars is se507.69 Cr. Manufacturing > Sugar Under Execution

31 Shreenath Orgochem
3 Cr. Process Industries > Chemical > Dyes Planning

32 AeroEagle Automobil 0 Manufacturing > Engineering > Electric Planning

33 H.P. State Electro 0 Manufacturing > Engineering > Electric Planning

34 Foxconn Technology 0 Manufacturing > Engineering > ElectricaPlanning

35 Alsons Met Infra is 0 Process Industries > Chemical > Distilla Planning

36 AAI is setting up E 5 Cr. Manufacturing > Engineering > Electric Planning

37 AAI is setting up E 0 Manufacturing > Engineering > Electric Planning

38 Laxmi Organic plans 0 Process Industries > Chemical Planning

39 Epigral Limited pla 0 Process Industries > Chemical Planning

40 Ambuja Concrete No
₹1,400 crore Manufacturing > Cement & Ceramics > Planning

41 Summercool Home Ap 0 Manufacturing > Engineering > Home aPlanning

42 Divine Vidyut is set155 Cr. Manufacturing > Metal > Iron & Steel Planning

43 Kumardhubi Steels48.14
i Cr. Manufacturing > Metal > Iron & Steel Planning
44 Nelcast is setting 190 Cr. Manufacturing > Metal > Iron & Steel Planning

45 BSNL is setting up 0 Manufacturing > Engineering > ElevatorPlanning

46 Punyashlok Ahilyade 0 Manufacturing > Engineering > ElevatorPlanning

47 Hindustan Urvarak 0 Manufacturing > Engineering > ElevatorPlanning

48 Nilachakra Minerals 0 Manufacturing > Metal Planning

49 Torrent Green HydRs. 10,260.00 cror Process Industries > Chemical Planning

50 Dalmia Bharat Refra


Rs. 1,200.00 crore Manufacturing > Tyres & Tubes Planning
Product Country State City Capacity Place Of Work

Drug Formulation India Gujarat Vadodara 90 tpa Vadodara dist, Guj

Sugar India Maharashtra Satara 900 TCD Patan, dist. Satara

Steel Plant India Karnataka Koppal (4,00,000 MTPA toKanakapur, dist. K

MS Ingots/Billets India Chhattisgarh Raipur from 30,000 tpa toChhattisgarh

Distillary/Alcohol India Chhattisgarh - 80 KLPD & 2 MW

Active PharmaceutiIndia Telangana Mahabubnagar 1,750 tpm Mahaboob Nagar,

Dugs and formulatIndia Telangana - 55.0 TPM Kondapur Mandal,

Distillary India Andhra Pradesh Anantpur 200KLD, 6 MW Anantappur, Andhr

Synthetic ChemicalIndia Maharashtra Palghar 4128 TPA Palghar

Synthetic ChemicalIndia Maharashtra Raigad

ethanol unit India Gujarat Ahmedabad 100 klpd Ahmedabad dist, G


Distillary India Bihar Patna 100 klpd Patna dist, Bihar

Pharmaceutical APIIndia Gujarat Ahmedabad Gangad, Tal: Bavla

Agro Chemicals India Gujarat Bharuch 48290 MTA Sambheti

Common hazardous
India Uttar Pradesh - Amroha.

Synthetic organic India Gujarat - 256.55 MT/M Ahmedabad

Integrated cementIndia Rajasthan - Nimbol village Pali.

MS Billets India Chhattisgarh Raipur 3,20,000 TPA Raikheda.

>UPS India Meghalaya - Shillong

Fertiliser India Gujarat - Bellary.

Iron & Steel India Jharkhand - Budhakhap

Distillary India Maharashtra - 200 KLPD Pandegaon

Chemical India Gujarat Bharuch Saykha Industrial E

Speciality chemicalIndia Gujarat Bharuch Bharuch

srinathshetty@va India Gujarat -

Iron & Steel India Jharkhand Giridih Giridh

Iron & Steel India Chhattisgarh Bilaspur Masturi,


lab chemicals/ co India Uttar Pradesh Lucknow Lucknow.

Distillary India Delhi - 12,000-Ton Delhi.

Sugar plant India Karnataka Bagalkot 2,500 to 5,000 TCDBagalkot.

Dye intermediatesIndia Gujarat - 148 MT per monthAhmedabad.

Electric Vehicles India Maharashtra Pune 2,400 units per yePune.

i-Fi network accessIndia Himachal Pradesh - Himachal Pradesh.

Battery energy storIndia - -

Grain-based ethanIndia Maharashtra Thane 150 KLPD (kilo literThane.

EV Charging India Chhattisgarh - Raipur.

EV charging statio India Maharashtra - Kolhapur

Chemical India Orissa Jagatsinghapur Jagatsinghpur dist

Chemical India Orissa Jagatsinghapur Jagatsinghpur dist

Cement India Orissa Cuttack Ambuja Concrete No

Home and kitchen India Uttar Pradesh Ghaziabad 5,000 square meter
Prayagraj.

Iron & Steel India Jharkhand - Saraikela, Jharkha

Iron & Steel India Jharkhand - Dhanbad.


foundry India Tamil Nadu - 54,000 TPA to 118,Tiruvallur, Tamil N

Elevator India Andhra Pradesh - Vijayawada.

Passenger Lifts India Maharashtra Solapur Solapur.

Elevator India Madhya Pradesh - Railhead Dhosawas,

Ore beneficiation India Orissa - 19,000 TPA. Sapha, District Cut

Green Ammonia pro


India Orissa Ganjam Ganjam, Odisha.

Tyres, tubes, and fIndia Orissa Balasore Balasore, Odisha.


March 2020 : Work on project is under-planning stage due to land development work is going on and may start in fu

Sept 2020 ; Work on project is under-planning stage due to lock down.

March 2021 : Work on project is under-planning stage due to land acquisition work is going on and may start in furth

Sept 2021 ; Work on project is under-planning stage due to land acquisition work is complete, govt approvals is got
Contact Details
March 2022
Project :Construction work is going on and scheduled
Details for completion
Contractor in further May-June
Constructor Updated2022.
Date
Sept 2022 : Project work had completed. production will be start in Feb 2023.
Synergia Life Sciences
Synergia
March Life
2023plans Sciences
Private
: Construction plans to setisup
Limited.,,Synergia
work goinga new probiotics
on and likely facility
to at Anjesarinvillage
be completed further inafter
Vadodara
diwali.dist, Gujarat.
Om Sponge to expand MS Ingots/Billets unit in Raipur district of Chhattisgarh.
Life Sciences Pvt. Ltd.
The upcoming manufacturing 1503, unit will
Universal cover over 5.54 acres of land parcel.
Majestic,
The project will also include waste-based power plant, biogas-based power plant and fly ash bricks manufacturing p
Sept 2023 : AroundP40 L Lokhande
percent work Marg, is completed and scheduled for completion in further Jan-Feb 2024.
Company is awaiting environmental clearance (EC)
Chembur, not decided
for the project.not decided 16-09-2024
Om Sponge is awaiting environment clearance for the project.
March 2024 : Around Mumbai 400071,
70 percent work is completed and scheduled to be completed within 2 moths.
AsMaait receives
Danteshwari approval, the
Maharashtra,
Maize company
Processing India &will soon finalise
Marketing the contractor
Societyand machinery
is planssupplier.
Work on the project is expected to commence by Cooperative
November 2022. Limited to set up d Grain based Ethan
Mr Shubham Shukla
Sept
Sept 2024
Mukand
Proposed :: Project
2024plans
Capacity to set
Almost isupstill
8866741824
–
80 %80anin planning
KLPD
work donestage
expansion
isGrain grated
based
and due tooperational
steel
Ethanol
will be govt
plant approvals
Plant atand
Village
by isKanakapur,
2.0end inofprogress.
Nov 2024.dist. Koppal, Karnataka
MW
Oct Cogeneration
2022 : Project Phone:
Power
is still +91-22-6266 9600
Plant
under-planning stage due to awaiting for govt approvals an may start in further 1 year.
t•
(4,00,000 MTPA Area:
Total Project to 7,00,000
Patan
+91-22-6266 haMTPA),
Sugarcane
7.37 9600Industries
(18.21 acres)
Limited,,Patan Sugarcane Local Contractor in house team 16-09-2024
March
Aug 20222024: : Project
Project is is still
Industries
still in inLimited,
planning
planning stage
stage due due
to to environmental
awaiting for clearancesclearances.
environmental is awaited for the project.
April 2023
Virchow : Govt approvals
Petrochemical Regd isOff: process
setting
Shikka isactive
goingpharmaceutical
upMansion, on and may start in further(API)
ingredients 5-6 months.
manufacturing unit with a capacity of 1,
Mukand Limited,Mukand
Sept 2024 : Project is under-construction and expected to be completed 4-5 months.
The project Limited,
also includes a 12 MW co-generation Not power plant.
disclosed. Notwork
disclosed. 14-09-2024
Feb
March 2023 : Environmental
2024 : Project
Plant atclearances
is under-process
Hospet Road, isand
received, Around
likely for 30 percent
completion by end of is completed
this years, and remaining work may be
Excavation work is Village in progress.
Om
Ginigera, Districtand machinery supplier has been finalised for the project.
Contractor
Sponge,9JPR+767,
Feb
Sept2024
2024: :Around 85
50 percent
AlmostMunrethi, work
% workChhattisgarh is completed
is completed andnot and expected
disclosed
expected tonot
be completed
for completion disclosed
in further by 1end of next months March 2024
14-09-2024
years.
493221
Sept
Sept 2023
2024 :: Project
Work onwork projectis under construction and schedueld to be completed in year end
is commissioned.
Maa Danteshwari Maize Mojj Engineering Systems Choice Consultancy
ltd.<br /> Services Pvt. Ltd<br />
Processing & Marketing 81-B/15, MIDC, Bhosari, Shree Pune,
Shakambhari
Maharashtra
14-09-2024
Corporate
41102<br
Park,Plot
/> No:156-15
Sept 2024 : AlmostCooperative 50 % work isSociety completed andTel: expected
020 2712 for 0360
completion
Phone: 022 in further
6707 99991 years.
Limited,Maa Danteshwari
Virchow Petrochemical
Pvt. Ltd.,,Virchow
Eco Steel India plans for distilling, rectifying
PetroChemicals PrivateSyntheticandnot disclosed
blending Not disclosed.
of spiritsRightsource
unit at Anantappur, 14-09-2024
Industrial Solutions
Andhra Pvt. Ltd<br />
Pradesh.
SIP Chemical Industries is plans to Setup Organic Chemical PlotManufacturing Unit Tarapur />
No.203, H.No.5-36/203,<br MIDC, Dist. Palgh
Limited Prashanthi Nagar, IDA-Kukatpally,<br />
200
Rudra KLD (100
Labs KLD in
is setting Phase-1
Rudraup drugs +and
100formulation
Labs,Rudra KLD Labs in Kondapur Mandal, Sangareddy.
Nov 2022 : Project
in Phase-2) along with is
Sy Nostill
6 MWunder-planning
134/A1,Co-generation stage
Terpole Project due to awaiting
(3 MW in Phase-1 for govt +approvals.
Hyderabad-
3 MW500072, Telangana.<br />
in Phase-2),
not decided 27-09-2024
040-23700602, 23075699,<br />
Sept 2024 : Projectvillage, is still notKondapur
started Mandal,
any work due to some issues,40126589, 7416073137<br />
Sept 2024 : ProjectSangareddy is still in planning stage due to a govt approvals ,environmental clearances process is going on an
Sept 2023
Prism Advance : Around Eco75 Steel
Technology percent work isiscompleted
Enterprise
District,,Sadasivpet,Sangar planning to andsetlikely
up antoethanol
be completed within 1in-2Ahmedabad
unit at Halvad
[email protected]<br months.
/> dist, Gujarat.
India,8-2-614/A/B/3/1, not disclosed [email protected]
not disclosed
Perfact Envirosolutions27-09-2024
Private Limited<br />
The proposed project Flat-401
will alsoBurri Residency,
comprises an installation of three MW Head co-generation
Office:<br /> power plant.
March 2024 : Construction Road No.11, workBanjara
is completedHills and commercial production 5th Floor, may
NN start
mall,within
Mangalam1 months.
Palace, <br />
Vasudha ChemicalsSIP Private
Chemical Limited is plans to set up expansion consented Excipients
Industries,SIP viz Poly Glycols , Polysorbates
Company is awaiting financial
Chemical Industries closure and environment clearance for the
Sector project.
3, Rohini -110085<br />
not disclosed 27-09-2024
Sept 2023 : Project is
Plot under-process
No. E-73 MIDC, and likely for completion in Phone:5-6
further 011months.
4928 1360<br />
Septcontractor
The 2024 : Work onmachinery
and project is commissioned.
Tarapur, supplier are still being finalized. <br />
March 2024 : Around 80-90 Chemicals
Vasudha percent work Private
is completed and expected Haryana
to beRegional
completed Office:<br
within 1/>months.
The company expects Limitedto start the work on the project
,Vasudha by
not disclosed Q1/FY24 and
Avanta to compete
Business
not disclosed by Q3/FY25.
Centre, 6th Floor ,BPTP Park Cent
26-09-2024
Chemicals Private Limited
Sept 2024 : Work on project is dropped due to shiffted plant to gujarat.
March 2024 : Project is still
at Plot No.in Hplanning
-5 & H-13, stage due to environmental clearances is received but still some noc is pend
Prism
MIDC Taloja,Advance Technology
Panvel,
Enterprise Pvt Ltd. ,Prism not decided Envisolve LLP <br />
Raigad, Maharashtra 25-09-2024
Advance Technology 201, Bliss Heights, Plot No. 27, Scheme No 78 - III,
Sept 2024 : Construction work is not yet started due to concern to certification work is under-process and may start
Enterprise Pvt Ltd.
Company has scheduled the project completion date for November 2023.

March 2024 : Construction work is going on.


Nolvox Pharma is setting up Pharmaceutical APIs, API Intermediates and Preservatives at Vill: Gangad, Tal: Bavla, Dis
Brajendra Kumar Builders
Total area of the
Sept 2024 : Work on project
Pvtproject is 27903
Ltd.,Brajendra m2.Kumar and
is commissioned Notcommercial
disclosed production
Not disclosed is started. 25-09-2024
Builders Pvt Ltd.
Bharat
April 2023Rasayan is planning
: Project Apois still intoplanning
Achuara setNh up31 agrochemicals,
stage unit at Sambheti
Barhdue to awaiting Vagra in Bharuch.
for govt approvals and may start in further 1 years
Nolvox Pharma
Patna, Near Barh, Patna- Private
June 2023 : ProjectLimited,Nolvox
is still inBihar,
803213, planning stage duenot
Pharma
India. to awaiting
decided for govt not approvals
decided and E.C 25-09-2024
Private Limited
Sept 2024 Project is still in planning stage due to govt permission , environmental clearances is awaited and may sta
Contact Ketankumar Sharp Engineering, EPC contractor<br />
Sept 2024 : ProjectBharat Rasayan
is still stopped
Dhasania, Director,due Survey 2, Ramprasad
to govt approvals Yadav Compound,
, environmental Koldongri,
clearances Lane but
is received No. still
1, Andheri
marketEast,
con
Win Waste Management is
Limited,Bharat setting
No. 83, Village: Gangad, up common
Rasayan hazardous
+919820939960<brwaste treatment
not /> decided storage and disposal
25-09-2024 facility at Amroha.
Limited
Taluka Bavla, District: [email protected]<br />
Plant add : Plot No. Shivalik Solid Waste Management Limited, EIA Con
Win
June 2023 : ProjectD/3/21/2/1 Waste
is in planning Management
stage.
Dahej III,Project
GIDC work will be start in Mr3Sibhadra Brahma<br />
to 4 months.
Private Limited,Win
Industrial Estate, Village Waste not decided Mobile: 8288079363,<br
24-09-2024/>
Management
Sept 2024 : ProjectSambheti is still in planning Private stage due to govt approvals Bhagwati
Vagra, District: <br />
, environmental clearances process/>is going on an
Limited Enviro Care
Email: [email protected] Pvt. Ltd.,<br
Shree Hari Dyes And
Shree Hari Dyes And Chemicals is setting up synthetic organic chemicals Plot No.: 28,29,30,
industry dyesParmeshwar Estate-II, Opp.
& dye intermediates AM
unit at A
Chemicals,Shree Hari Dyes not decided Mobile No. 9824051541<br 24-09-2024/>
Nirma
Sept 2024is setting upAnd
: Project integrated not cement
Chemicals
is still started project
due to govt- Clinker (1.48 tois4.38
permission MTPA),
Landline
awaited and Cement (2.28
No.0794008305<br
may start to 6.14
/> next years.
in further
MTPA), CPP (25 to Plot 60 MW) No.:and 439/1 WHRB and (4.7
417,to 15 MW) at Nimbol village Email Pali.
Id [email protected]
Nirma,Nirma
Phase No.: II, Limited GIDC Estate,
Nirma
Vatva-382445,House, Asharam not disclosed not disclosed 24-09-2024
Blackrock
Gujarat
Sept 2024 Steel
Narmada & Valley
: Project Power
Road, is setting
Fertilizers
is under-process
Ahmedabad, up MS expected
& and
Gujarat- Billets Limited
Chemicals at for
Village Raikheda
is set up Expansion
completion in furtherof1 existing
years. Ammonia, Urea plant
Expansion
capacity atproject
Bharuch\ to produce MSGujarat
Ahmedabad, Billets -3,20,000 TPA, Rerolled Steel Products 3,38,000 TPA (through Hot Charging 1
Blackrock
380009. Steel & Power
Private Limited,Blackrock not decided not decided 23-09-2024
Sept 2024 :ofProject Steel &
is Ammonia, Power
still in planning Private
stage due to govt permission, environmental clearances is going on and may st
expansion
High Court ofexisting
Meghalaya
Limited is plansUrea, to setEthyl
up Acetate & Ammonium
Nitrate Melt Plants &installation
High Court of of
Supply of DG Sets for Meghalaya High Court in Shillong New Weak Nitric Acid and Ammonium Nitrate Prills Plants,
Meghalaya
Meghalaya,High Court of not decided NA Sponge Iron Unit 23-09-2024
Aloke Steels Industries Meghalaya Private Limited is set up Expansion of existing at
Sept 2024
Budhakhap : Project
village inis still in
Jharkhand. planning stage due to tendering process is under-process and may start within 5-6 mont
March 2024 : GovtContact approvals, environmental clearances is received and expected to be completed by this months.
E. Kharumnuid,
Gujarat
MHJS, RegistrarNarmada Valley
Expansion of existing Sponge Co,Gujarat
Fertilizers Iron Unit from 120,000 TPA to 480,000
not disclosed notTPA, Installation23-09-2024
disclosed of 6x20
Ton IF, 2x20 Ton LRF,
Narmada1x3 strand
Sept 2024 : Work on project is completed. Valley 6/11m CCM
Fertilizers for production of 360,000 TPA MS Billets,
Installation of 750 & TPD Rolling Mill
Chemicals for production of 225000 TPA TMT Bar, Captive Power Plant
Limited
of 58 MW and 37,000 Aloke TPA Steels Ind(P) Plant
Slag Crushing
Ltd.,,Aloke Steels Not Decided Not Decided 23-09-2024
Supreme Sugars is setting
Industries up distillery
Private unit
Limited at Pandegaon.
Sept 2024 : Project is still in planning stage due to awaiting for govt approvals, environmental clearances and may st
at village: Budhakhap,
establish 200 KLPDSupreme Sugars
distilleryRamgarh,
District: unit based Private
on sugarcane juice/syrup/Mantras
State C molasses/ Green Resources
B heavy Hall No.1,
molasses First
as a raw Floor, NI
material to
Parad Corporation Limited,Supreme
is setting up chemical Sugars mfg unitnotindecided
Saykha Industrial Mr Shri Estate.
Sanjay Patil<br
23-09-2024
/>
Sept 2024 : ProjectPrivate is still inLimited
planning (SSPL)
stage due to awaiting for govt (iv)Mobile
approvals, No. 8888820305 Pradnya
environmental clearances nalawade
and may(v)L
st
March 2024 : Project Contactis still:in planning stage due to awaiting for govt approvals , environmental clearances and may
Rajwardan
Parad Corporation
Ghorpade, Director, A/P Private
Limited,Parad Corporation not decided not decided 21-09-2024
Sept 2024 : Work on Private
project Limited
is commissioned.
Contact : Amit Parikh,
Vibrant Fine ChemVibrant is setting
Director, Fine
up Chem,Vibrant
speciality chemicals and intermediates unit in Bharuch.
Fine Chem not decided not decided 21-09-2024
Sept 2024 : Project Contact
is still : Mayur
in planning Ram,
Atibir Hi-Tech Private
Partner,Limited 410,is plansstageto setdue to awaitingsteel
up expansion for govt
plantapprovals, environmental
in Giridh District Jharkhand clearances .
Vasudha Chemicals Private
Vasudha Chemicals Private Limited is plans to set up expansion consented Excipients viz Poly Glycols , Polysorbates
project aims to enhance Limited the production
,Vasudha not disclosed NA its existing steel 21-09-2024
Rashi
capacitySteel
of & Power
ingots from Limited
Chemicals 60,000 is plans
TPA
Private toto set up expand
1,48,500
Limited TPA andand modernize
increase the output of billets, plant at
TMT
Sept 2024
Village : Project
Paraghat, is under-construction
Tehsil Masturi, District and expected
Bilaspur, for completion within 5-6 months.
Chhattisgarh
bars, and rods fromat21,349 Plot No. TPA H to-5 &2,37,600
H-13, TPA. Additionally, the company plans to boost the
installed capacity of Atibir
MIDC Hi-TechPanvel,
its reheating
Taloja, Pvt
furnace and slag crusher
expansion includesLtd.,,Atibir
Raigad, Maharashtra Hi-Tech Private not decided NA 16-09-2024
facilities for iron ore beneficiation
Limited
Sept 2024 : Project is still in planning (1.90
stageMTPA),
due to a coal
govtwashery
permission (0.35 MTPA), aand
is awaited pellet
mayplant
start in further next year.
(1.30 MTPA with PGP Village:of 400 Nm³/hr),P.O
Mohanpur, and–a captive power plant of 43 MW (36 MW WHRB and
Rashi
7 MW coal with dolochar-based
Udnabad, Steel & CFBC). Power
Ltd.,,Rashi Steel and Power not decided not decided 16-09-2024
Limited (RSPL)
Sept 2024 : Project is still in planning stage due to govt permission is awaited.
at Village Paraghat, Tehsil
Masturi, District Bilaspur,
Chhattisgarh.
Council of ScientificCouncil of Scientific
and Industrial & is setting up lab chemicals/ compounds in Lucknow.
Research
Vikalp Bio and Distillery is setting
Industrial up 12,000-Tonnot
Research,Council CBG plant in Delhi.
disclosed NA 14-09-2024
Project is commissioned, of Scientific and Industrial
will manufacture compressed
Research biogas (CBG) with a
capacity of 12,000 Vikalp tons. The Biofacility
and Distillery
will be located in Delhi.
Private Limited,Vikalp Bio not decided NA 14-09-2024
and Distillery
Project is still in planning stage due Private
to govt permission is awaited.
Badami Sugars is setting Limited up 200 KLPD capacity and
expand its sugar plant BadamifromSugars
2,500 to 5,000 TCD for white crystal and refined sugar in Bagalkot.
Limited ,Badami Sugars Praj Industries Lt NA 14-09-2024
Shreenath Orgochem is
Limited setting up dye intermediates facility in Ahmedabad.
Sept 2024 : Project is under-construction and expected to be completed within 3-4 months.
Contact : Prasanna S
AeroEagle
total capacityAutomobiles
of theCopmed is setting
proposed
Hulageri, upRelation
expansion
Public electric buses,
is set electric
to reach 148three-
MT perwheelers,
month and electric tractors in Pune
Pharma,Shreenath
Officer, Sy. No. not decided NA 14-09-2024
,Project
with a isproduction capacity
Orgochem
still in planning
310/1,310/2 of 2,400
Private
stage due andto units
Limited
govt permission is waited.
310/3,
per year. The company has filed an Industrial Entrepreneurs Memorandum (IEM) to initiate this
project. AeroEagle Automobiles
Private Limited ,AeroEagle NA NA 27-09-2024
Automobiles
Project is still in planning stage Private
Limited
H.P. State Electronics
Foxconn Technology India is setting
Development Corpup,H.P.
open battery
NA energy storage NAfacility in India. 27-09-2024
H.P. State State Electronics
Alsons
e companyMetElectro
Infra
is isDevelopment
setting upwith
in discussions grain-based
the
Corp.ministerethanol
of unit in Thane.
industry about potential Foxconn jointTechnology
ventures for India
BESS development in Tamil Nadu.
to produce grain-based Private ethanol (undenatured ethyl
Limited,Foxconn NA NA 27-09-2024
alcohol of 80% strength or
Technology
Project is still in planning stage. higher)Indiafrom sources
Private like maize and broken rice in Thane,
Maharashtra, withLimited a capacity of 150 KLPD (kilo liters per day). The company has filed an
Industrial Entrepreneurs AlsonsMemorandum
Met Infra Private (IEM) to initiate this project.
Limited ,Alsons Met Infra not decided NA 27-09-2024
Privatestage
Project is still in planning Limited due to govt permission is awaited
Contact : Ashok Kumar
AAI is setting up EVAirports
Charging
Jain, Authority
Director,stations at of Raipur Airport
AAI is setting up EVIndia,Airports
charging station at Kolhapur
Authority of NA Airport. NA 27-09-2024
India
Project is still in planning stage due to tendering process is going on..
Airports AuthorityContactof India :(AAI)
Dr. S.D.invites bids for the license to supply, install, test,
Sharma,
commission, operate, Airports Authority
and Director,
Airport maintain anofElectric Vehicles (EV) Charging Station at Kolhapur
India,Airports Authority of NA NA 27-09-2024
India
Project is still in planning stage due to tendering process is going on.
Contact : Kunal Kishor,
Laxmi Organic plans Laxmi
to setOrganic
Office ofup Industries
a synthetic
Airport organic chemicals manufacturing unit in Jagatsinghpur dist, Odisha.
Director,
Ltd,Laxmi Organic
Kolhapur Airport, NA NA 27-09-2024
The high-level clearance Industries Ltd,
authority (HLCA) meeting chaired by Chief Minister Mohan Charan Majhi recently approved
Kolhapur-416004,
Chandramukhi Basement,
Epigral
Epigral Limited plans to establish Limited,Epigral
a chemical manufacturing unit in Jagatsinghpur dist, Odisha.
Limited NA NA 27-09-2024
The high-level clearance (formerly known(HLCA)
authority as meeting chaired by Chief Minister Mohan Charan Majhi recently approved
Ambuja Concrete North Meghmani plans Finechem
to set up aLtd) cement grinding unit in Cuttack, Odisha.
Summercool HomeAmbuja Appliances Concreteis setting
North up Summercool, a leading home and kitchen appliances brand in Prayagraj.
The high-level clearance Privateauthority
Limited ,Ambuja
(HLCA) meeting NA chaired by Chief NAMinister Mohan 27-09-2024
Charan Majhi recently approved
s set to launch a new manufacturing
Concrete North Private
facility in the NainiLimited
Industrial Area, Prayagraj. The plant will cover 5,000 square meters,
Divine Vidyut
expanding the iscompany’s
setting up ferro
Summercool alloy and sponge iron facilities in Saraikela, Jharkhand.
Home
production
Kumardhubi Steels is setting up
Appliances MS ingot capacity
unit and rolling mill in Dhanbad.
NA NA 27-09-2024
Ferro Alloy (Si-Mn)
Project is still with
Limited
in planning a capacity
,Summercool
stage. of 30,000 TPA and Sponge Iron (DRI) with a capacity of 1,20,000 TPA.
Expansion of existing Home 27000 TPA M.S.Limited
Appliances Ingot unit to 148,500TPA MS Ingot/Billets by installing
3x15T (by replacement
The expansion Divine
includes of Existing
Vidyut
the addition 2x4T
of aFurnace
Ltd,Divine Waste Heatwith Recovery
2x15T & Addition of 1x15T
Boiler (WHRB) andIF)isalong withat the existing site loca
situated
CCM-1x2 strand, 4/7m Vidyut radius,
Limited enhancement ofnot slagdecided
crusher capacity
NA from 9,000TPA to
26-09-2024
33,000TPA and
Project is still inProduction
Contactstage
planning :ofArun
145,000TPA
dueSinha, Rolled
to awaiting forProducts (TMT Bars/Structural/etc) by
govt approvals..
installing 1x25TPH GeneralRolling Mill along with 1x30TPH capacity reheating furnace (for emergency
Manager,
use) at Village: Rajpura,Kumardhubi Steels Private
P.O.: Kumardhubi, District: Dhanbad, Jharkhand
Limited ,Kumardhubi not decided NA 25-09-2024
Steels Private Limited
Project is still in planning stage due to govt permission is awaited.
at Village: Rajpura, P.O.:
Kumardhubi, District:
Dhanbad, Jharkhand
Nelcast is setting up foundry unit in Tamil Nadu

from the current capacity of 54,000


TPA to 118,661 TPA (Liquid Metal)
Nelcast,Nelcast
Project is still in planning stage dueLimited
to govt permission is awaited.
not decided NA 25-09-2024
located at SF. No. 37/1,
38/1A, 1B, 4, 44/1,
Bharat
BSNL is setting up SITC Sanchar Nigam
of 8-Passenger MRL Lift at BSNL Bhavan, Vijayawada.
Limited,Bharat Sanchar not decided NA 25-09-2024
Nigam stage
Project is still in planning Limited
tendering process is going on but still participate is awaited and may start within 2-3
Contact : Edukondalu
Punyashlok Ahilyadevi
Basvani, Executive
Holkar Solapur
Engineer (Electrical), NA NA 25-09-2024
Punyashlok Ahilyade University,Punyashlok
Ahilyadevi Holkar Solapur
Hindustan UrvarakHindustan
and Rasayan Urvarak & up handling, transportation, and warehousing support at Railhead Dhosaw
is setting
Rasayan Limited,Hindustan NA NA 25-09-2024
Urvarak and Rasayan
Limited
Nilachakra Minerals Nilachakra Minerals
is setting up chrome ore beneficiation plant in Sapha, District Cuttack, Odisha.
Private Limited,Nilachakra not decided NA 25-09-2024
Minerals
Project is still in planning Private
stage Limited
due to awaiting for govt approvals.
Contact : Sri Satish Kumar
Torrent Green HydrogenTorrent Green
plans
Rout, Director,forHydrogen
Green Ammonia project in Ganjam, Odisha.
Nilachakra
Private Limited,Torrent
Mineral Private Limited At- NA NA 25-09-2024
Green
The high-level clearance Hydrogen(HLCA)
Sabar authority
Sahi, Privatemeeting chaired by Chief Minister Mohan Charan Majhi recently approved
Dalmia Bharat Refractories
Limited set up a manufacturing unit for tyres, tubes, and flaps in Balasore, Odisha.
Dalmia Bharat Refractories
Ltd.,Dalmia
The high-level clearance Bharat
authority NA chaired by Chief
(HLCA) meeting NAMinister Mohan 25-09-2024
Charan Majhi recently approved
Refractories Ltd.
Registered office:
EDC

31-03-2025
30-09-2025
30-11-2024

30-09-2025

28-02-2025
31-01-2025