25
25
2.0 / R
2.0 / S
2.0 / T
PE /
R1 S1 T1 R4 S4 S4
1 3 5 1 3 5 1 3 5 1 3 5 1 3 5 1 3 5
K1 K3 K2 K4 K6 K5
/3.4 /3.7 /3.6 /3.4 /3.8 /3.6
2 4 6 2 4 6 2 4 6 2 4 6 2 4 6 2 4 6
/7.2 /7.6 /7.4 /7.2 /7.7 /7.4
/3.5 /3.5 /3.7 /3.5 /3.5 /3.7
/7.3 /7.3 1 3 5 /7.5 /7.3 /7.3 1 3 5 /7.5
24VDC /3.8 24VDC 24VDC /3.9 24VDC
24VDC F2 24VDC F3
/3.1 2 4 6 /3.2 2 4 6
/7.1 /7.2
R2 S2 T2 R3 S3 T3 R5 S5 T5 R6 S6 T6
110KW
-M1 110KW
-M2
M
3~ M
3~
/3.0
1 3 5
-F1
400A
2 4 6
L1 L2 L3 PE
2
Date 1/14/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 1
Modification Date Name Original Replacement of Replaced by Page 1/8
0 1 2 3 4 5 6 7 8 9
1.9 / R / R
1.9 / S / S
1.9 / T / T
R7 S7 T7 R8 S8 T8
1 3 5
F4
1 3 5 4A
2 4 6
-Q1
1.6-2.5A
R S T
CONTORL PHASE
R S T
T1
20A
3
0V 24V
1 3 5
K7
/4.5
2 4 6
/7.9
1 3
F5
16A 2 4
U1 V1 W1
X10 1 X11 2
M
-M3
FAN 3~
PE
1 3
Date 1/14/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 2
Modification Date Name Original Replacement of Replaced by Page 2/8
0 1 2 3 4 5 6 7 8 9
.0 / 24V / 3.9
1
1
F6
2
8 9 12 13 16 17 18 19 20
11
PH
14
1X:1
2X:1
3 13 13 13 13 13 13 13 13 11
S1 D31 D34 D32 D35 D33 D36 K3 K6 PH
/8.0 4 /3.3 14 /3.3 14 /3.5 14 /3.5 14 /3.7 14 /3.7 14 /1.3 14 /1.7 14 12
11
START_STAR_M1 START_STAR_M2 START_DLTA_M1 START_DELTA _M2
SS3 Q0.2 Q1.1 Q0.1 Q1.0
/8.0 12
/3.0
1X:6 1X:7
Q0.2 Q1.1 1X:12 1X:13
Q0.1 Q1.0 1X:18 1X:19 1X:20 1X:21 1X:22
/8.1
2X:2 1 1 1 1
1
F9 F10 F11 F12
2 2 2 2
4 5
1X:2 1X:3 1X:8 1X:10
3X:1 95 95 1X:14 1X:16
F2 F3
/1.3 96 /1.7 96
/7.1 /7.2
11 1X:4 1X:5 13 13 11 11
MP 2X:10 K1 K4 K2 K5
2X:7
/9.3 12 /1.2 14 /1.6 14 /1.4 12 /1.8 12
1 3 1 3
3X:2
S4 S6 S5 S7
/8.2 2 /8.3 4 /8.3 2 /8.4 4 1X:15 1X:17
/4.7 /4.6 /4.8 /4.7
13
1 I8.2 I8.3 I8.6
M1 2X:6 2X:8 2X:9 2X:11 FEED RUNING_M1 FEED RUNING_M2 CONTORL_PHASE
/1.2 14
11 11
2X:4 K3 K6
1 /1.3 12 /1.7 12
I1.7 I0.0 I0.2 I0.1 I0.4 I0.3
SS3 LIMTSWICH EMERGENCY STOP_M1 START_M1 STOP_M2 START_M2
/3.0
4 2
R F
I9.0 I9.1
MIXSER_F MIXSER_R Q0.0 Q0.3
13 23 13 23
DY1 DY1 DY2 DY2
/3.0 14 /3.0 24 /3.0 14 /3.0 24 1 1
F7 F8
2 2
MIXSER_F MIXSER_R 3X:3 3X:4
Q8.5 Q8.6
A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1
DY1 DY2 Y1 Y2 D31 D34 K1 K4 D32 D35 K2 K5 D33 D36 K3 K6
/9.3 I0.7 /9.4 I0.7
A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2 A2
MIXSER MIXSER
13 14 /3.1 13 14 /3.2 11 12 /4.7 11 12 /4.8 13 14 /3.6 13 14 /3.6 13 14 /3.7 13 14 /3.8
A1 A2 /7.2 A1 A2 /7.2 A1 A2 /7.4
A1 A2 /7.4 A1 A2 /7.6 A1 A2 /7.7
23 24 /3.2 23 24 /3.3 13 14 /3.4 13 14 /3.4
13 14 /4.6 13 14 /4.7 13 14 /3.5 13 14 /3.5 11 12 /3.7
11 12 /3.7 11 12 /3.5 11 12 /3.5
13 14 /7.3 13 14 /7.3 11 12 /7.5
11 12 /7.5 11 12 /7.3 11 12 /7.3
13 14 /3.8 13 14 /3.9
4.0 / 0V / 3.9
2 4
Date 4/4/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 3
Modification Date Name Original Replacement of Replaced by Page 3/8
0 1 2 3 4 5 6 7 8 9
20 21 26 27 28 36
2X:13 2X:16
3 11 11 13
PT1 -SS8 13 13 SS9 D49 13 13 11 11 13
/4.5
4 14 12 D47 D48 14 12 14 D31 D34 D31 D34 Emergncy stop
/4.1 14 /4.1 14 /3.3 14 /3.3 14 /3.3 12 /3.3 12 14
22 23 29 30
3
PT2
4
1X:24
I9.2
3X:5 rest emergncy
DLEYRY
3M Q0.4
31 32
F15
PUMP RUNING BACK PUMPING FAN
Q1.2 Q1.3 2 Q1.4
33 34
A1 A1 x1 x1 A1 A1 x1 x1 x1 x1
FLOW CONTROL SOLENID
D47 D48 Y3 Y4 D49 K7 S6 S7 S4 S5
A2 A2 /9.5 x2 /9.5 x2 A2 A2 /3.2 x2 /3.2 x2 /3.1 x2 /3.2 x2
/8.3 /8.4 /8.2 /8.3
3.0 / 0V / 4.9
3 5
Date 4/4/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 4
Modification Date Name Original Replacement of Replaced by Page 4/8
0 1 2 3 4 5 6 7 8 9
Emergency_stop Start motor 1 Stop motor 1 Start motor 2 Stop motor 2 Start pumping Start back pumping Mixir PT3(PID PWM) Temperature
PWM+ PWM- Feed runing motor1 Feed runing motor2 Oil tank surface PT1andPT2 Phase contorl Lemtsich mixer Mixser_f Mixser_r Rest emrgncy
I0.0 I0.1 I0.2 I0.3 I0.4 I0.5 I0.6 I0.7 IW64 PIW66 I8.0 I8.1 I8.2 I8.3 I8.4 I8.5 I8.6 I8.7 I9.0 I9.2 I9.3
Q0.0 Q0.1 Q0.2 Q0.3 Q0.4 Q0.5 Q8.0 Q8.1 Q8.2 Q8.3 Q8.4 Q8.5 Q8.6 Q8.7
Run motor 1 Main run motor 1 Delta Run motor 1 Star Run motor 2 Main PWM Run motor 2 Delta Run motor 2 Star Start pumping Start back pumping Start fan Mixser_r
Mixser_f
4 7
Date 4/4/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 5
Modification Date Name Original Replacement of Replaced by Page 5/8
0 1 2 3 4 5 6 7 8 9
1X/1~23
1:1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
95 95 A1 A1 13 13 A1 A1 11 11 A1 A1 A1
F2 F3 K1 K4 K1 K4 K2 K5 K2 K5 K3 K6 K7
/1.3 96 /1.7 96 A2 A2 /1.2 14 /1.6 14 A2 A2 /1.4 12 /1.8 12 A2 A2 A2
/3.1 /3.2
11 11
K3 K6
/1.3 /1.7 I8.2 I8.3 I8.6
12 12 FEED RUNING_M1 FEED RUNING_M2 CONTORL_PHASE
2X1
5 8
Date 4/4/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 7
Modification Date Name Original Replacement of Replaced by Page 6/8
0 1 2 3 4 5 6 7 8 9
2X/1~19
2:1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
3
S1 1 3 1 3
/3.0 4 1 S4 S6 S5 S7 11 11 13
SS3 /3.1 2 /3.2 4 /3.2 2 /3.2 4 -SS8 SS9 Emrgncy stop
/4.7 /4.6 /4.8 /4.7
11 /3.0 14
4 2 14 12 14 12
SS3 R F
/3.0 12
/3.0
/8.1
7 9
Date 4/4/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 8
Modification Date Name Original Replacement of Replaced by Page 7/8
0 1 2 3 4 5 6 7 8 9
3X/1~9
3:1 2 3 4 5 6 7 8 9
11 A1 A1 x1 x1
MP Y1 Y2 Y3 Y4
/3.0 12 /3.1 A2 /3.2 A2 /4.2 x2 /4.2 x2
I1.6 FLOW CONTROL SOLENID
PT1&PT2
8
Date 1/15/2023 EPLAN west grop = g
Ed. REISI + l
Appr. Project template with identification structure in accordance with IEC standard: Page structure with higher-level function and mounting location IEC_tpl001 Page 9
Modification Date Name Original Replacement of Replaced by Page 8/8