The Rozelle Interchange project in Sydney aims to improve traffic flow and connectivity with a budget of $3.9 billion, starting in 2019 and expected to complete by 2024. It includes a multi-level tunnel system and surface interchange, with a focus on environmental impacts and community engagement. Proposed designs feature advanced traffic management systems and risk management strategies to address potential challenges during construction.

Uploaded by

leonard waithaka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views8 pages

Rozelle Interchange Design Presentation_6addde9dc908e82e35cbe9a97d0dfefb

The Rozelle Interchange project in Sydney aims to improve traffic flow and connectivity with a budget of $3.9 billion, starting in 2019 and expected to complete by 2024. It includes a multi-level tunnel system and surface interchange, with a focus on environmental impacts and community engagement. Proposed designs feature advanced traffic management systems and risk management strategies to address potential challenges during construction.

Uploaded by

leonard waithaka
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

ROZELLE

INTERCHANGE –
WESTCONNEX M4-M8
LINK
Civil Works Design Presentation
Prepared by: Mayank Singh Bora
Project Overview
• Project Location: Rozelle, Sydney, NSW, Australia
• Client: Transport for NSW (TfNSW) & WestConnex
• Budget: $3.9 billion
• Start Date: 2019 | Completion Date: 2024
• Primary Objective: Improve traffic flow, reduce congestion, and
enhance connectivity
Design Requirements &
Functional Specifications
• Multi-level tunnel system and surface interchange
• Grade-separated connections for major roadways (M4, M5, City
West Link)
• Tunnel ventilation, noise barriers, and sustainable infrastructure
• Intelligent Transport Systems (ITS) and smart tolling solutions
Proposed Design Concept 1 -
Multi-Level Tunnel System
• Multi-tier underground tunnels with dedicated ramps
• Separate lanes for local, regional, and freight traffic
• Emergency lanes, adaptive lane control, and automated traffic
management
• Reduces congestion, improves travel efficiency, but has higher
costs
Proposed Design Concept 2 - Semi-
Underground Interchange with
Flyovers
• Combination of underground tunnels and elevated flyovers
• Reduces excavation and tunneling costs while maintaining
efficiency
• Hybrid ventilation system improves air quality management
• Requires additional noise mitigation and urban planning
considerations
Environmental & Community
Impacts
• Air Quality: Tunnel ventilation and filtration systems
• Noise & Vibration: Acoustic barriers and restricted work hours
• Hydrology: Stormwater management to prevent flooding
• Biodiversity: Reforestation programs and habitat protection
• Community Impact: Stakeholder engagement and compensation
policies
Risk Management Strategies
• Geotechnical Risks: Ground stabilization and tunnel reinforcement
• Air Quality & Emissions: High-capacity ventilation and real-time
monitoring
• Construction Disruptions: Traffic detours and phased work
schedules
• Cultural Heritage: Preservation of historic sites and Indigenous
consultation
Next Steps & Approval Request
• Finalize preferred design concept based on stakeholder feedback
• Conduct further environmental and geotechnical assessments
• Obtain formal approval from Transport for NSW and regulatory
bodies
• Implement final project adjustments and begin construction phase