The document outlines the tender for renewal work on the road from PC Farah to Gadaya Latifpur to Nagla Chatti in Mathura, detailing the price schedule and specifications for various construction activities. It includes a breakdown of quantities, estimated rates, and total amounts for tasks such as laying stone ballast, applying tack coat, and constructing embankments. The total estimated cost for the project is approximately INR 27,29,081.25, with specific instructions for bidders regarding the submission of their proposals.

Uploaded by

sharmaanil34720
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views

File

The document outlines the tender for renewal work on the road from PC Farah to Gadaya Latifpur to Nagla Chatti in Mathura, detailing the price schedule and specifications for various construction activities. It includes a breakdown of quantities, estimated rates, and total amounts for tasks such as laying stone ballast, applying tack coat, and constructing embankments. The total estimated cost for the project is approximately INR 27,29,081.25, with specific instructions for bidders regarding the submission of their proposals.

Uploaded by

sharmaanil34720
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Percentage BoQ 13

Tender Inviting Authority: Superintending Engineer, Agra Circle, PWD, Agra

Name of Work: Renewal work with PC Farah to Gadaya Latifpur to Nagla Chatti road (VR) K.M. 1, 2, 3 (810) in Distt. Mathura

Contract No: Dated-


Bidder
Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent
columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values
NUMBER only )
TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #
#
Sl. Item Description Quantity Units Estimated TOTAL TOTAL AMOUNT
No. Rate AMOUNT In Words
1 2 4 5 6 53 8
1 Providing, laying, spreading and compacting machine crushed INR One Lakh Ninety
stone ballast of approved quarry of 53~22.4mm size to water Five Thousand Only
bound macadam of G-3 specification including spreading in
uniform thickness, hand packing rolling with power roller 8 to
10 tonnes in stages to proper grade and camber applying and
brooming with crushable screening material i.e. stone dust to fill-
65.00 Cum 3000.00 195000.00
up the interstices of coarse aggregate, watering & rolling making
necessary earthen bund to protect edges, lighting, guarding,
barricadding etc. including the cost of all materials, labour, T &
P etc. required for proper completion of work aas per MORD
specifications no 405.

2 Providing & applying Tack Coat with bitumen VG-10 using INR One Lakh Fifty Two
Bitumen pressure distributor at the rate of 0.30 Kg./Sqm. on the Thousand Seven Hundred
prepared primed granular/old painted surface, cleaned with air & Ninety Three and Paise
compressor, including all Taxes, Material, Labour, T&P etc 10537.50 Sqm 14.50 152793.75 Seventy Five Only
required for proper completion of the work, as per MORD
specification No. 503 (including cost of Bitumin)

3 Providing, laying & rolling of open graded Premix Carpet of INR Sixteen Lakh Sixty
20mm thickness composed of 13.2mm to 5.60mm aggregates Four Thousand Nine
including mixing in a suitable plant, laying & rolling with a three Hundred & Twenty Five
wheeled 80-100KN Static Roller capacity, finished to required Only
level & grades Bitumen @ 14.6 Kg./ 10 sqm. area for premixing 10537.50 Sqm 158.00 1664925.00
including all Taxes, Material, Labour and T&P etc required for
proper completion of the work, as per MORD specification No.
508. (including cost of Bitumin)
4 Providing and laying seal coat type "C" sealing the voids in a INR Five Lakh Seventy
bituminous surfsce P.C. surface laid to specified levels grade Nine Thousand Five
and cross fall using with 6.7 mm nominal size grit of Gwalior Hundred & Sixty Two
quarry @ 0.09 cum per 10sqm with Bitumen @ 6.50 kg/10sqm and Paise Fifty Only
including heating of Bitumen to the required temperature and 10537.50 Sqm 55.00 579562.50
including all material , Labour & T&P etc. as per Clause 510
case-III of MORD Specification. (including cost of Bitumin)

5 Construction of Embankment/Patri with approved material INR One Lakh Thirty Six
obtained from borrow pits with all leads & lifts, transporting to Thousand Eight Hundred
site, spreading, grading to required slope and compacting to meet Only
requirements etc complete as directed by Engineer Incharge 1200.00 Cum 114.00 136800.00
including all machinery charges & including all labour, T&P etc
required for proper completion of the work. As per table no. 300-
2

Total in Figures INR Twenty Seven Lakh


Twenty Nine Thousand
2729081.25 &Eighty One and Paise
Twenty Five Only

Quoted Rate in Figures INR Zero Only

Select 0.00
Percentage BoQ 13
Tender Inviting Authority: Superintending Engineer, Agra Circle, PWD, Agra

Name of Work: Renewal work with PC Farah to Gadaya Latifpur to Nagla Chatti road (VR) K.M. 1, 2, 3 (810) in Distt. Mathura

Contract No: Dated-


Bidder
Name :
PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent
columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values
NUMBER only )
TEXT # NUMBER # TEXT # NUMBER NUMBER # TEXT #
#
Sl. Item Description Quantity Units Estimated TOTAL TOTAL AMOUNT
No. Rate AMOUNT In Words
1 2 4 5 6 53 8
Quoted Rate in Words INR Zero Only

Note - 1- Rates are inclusive of all taxes but excluding GST which shall be paid extra as applicable
2- Labour cess @ 1% will be deducted from contractor's bill at the time of payment