12 2-Step Picking Process

The document outlines the steps for setting up Two-Step Picking in a warehouse management system, including configuration of storage types and bins, creation of wave management processes, and optimization of access strategies. Key actions include creating storage type 2010, adjusting product master settings, and executing sales order processes. The final steps involve monitoring and confirming warehouse tasks related to the picking process.

Uploaded by

veeresh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views2 pages

12 2-Step Picking Process

The document outlines the steps for setting up Two-Step Picking in a warehouse management system, including configuration of storage types and bins, creation of wave management processes, and optimization of access strategies. Key actions include creating storage type 2010, adjusting product master settings, and executing sales order processes. The final steps involve monitoring and confirming warehouse tasks related to the picking process.

Uploaded by

veeresh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

2-STEP PICKING

1. Set Up Two-Step Picking


SPROImgEWMGoods issue processwave
managementgeneral settingsSet Up Two-Step Picking
 Warehouse: PLAN
 Two-step picking:2
 2 step product depend: select
 Process type: 2010

2. Create storage type: 2010

3. Create storage bin for 2010 sto.type: 2010-2STP

4. Change WPT 2010

5. Create WPT 2020


 WP.Category: 2
 Activity: PICK
 Dest.sto.type: 9020
 Dest.bin GI-ZONE
6. Change product master PLAN-M1
2-Step picking: 2

7. Specify Storage Type Search Sequence


SproimgewmGI ProcessstrategiesSpecify
Storage Type Search Sequence

PLAN- 2STEP---2010
8. Determine Storage Type Search Sequence for Stock Removal
Path as 7

PLAN 2020 X 2STP STRR

9. Optimization of Access Strategies for Stor. Type Determination in


Stck Rmvl

Select: 2SP and Removal Ind

10. Create sales order VA01


11. Create OBD: VL01N
12. /SCWM/PRDO
13. Create wave: SCWM/WAVE
14. Assign OBD Orders to wave
15. Goto Monitor: /SCWM/MON
 Release Wave
 Release withdrawl
Observe:source and detination details for task
Dest.should be 2010-STEP
Confirm warehouse task.
 Release subdivision